Post Job Free

Resume

Sign in

Construction Manager, Superintendent, Project Manager

Location:
Tuba City, AZ, 86045
Salary:
$60000
Posted:
April 25, 2011

Contact this candidate

Resume:

WINSTON CHATO Moab, UT ***** ubf7d7@r.postjobfree.com ~ cell: 801-***-****

Construction Superintendent ~ Specializing in Commercial Construction ~

PROFILE Results-oriented, hands-on construction professional with 12 years expertise in all aspects of construction development from start to completion. Verifiable track record for the successful completion of multimillion dollar construction projects through coordinating trades, developing partnerships and building positive rapport with architects, engineers, local officials, vendors and clients while maintaining costs.

Areas of Expertise lie in:

Construction Planning and Scheduling Safety and Compliance Management Organization and Time Management Vendor and Materials Management

EMPLOYMENT HISTORY Hogan and Associates Construction, Centerville, UT 2000-Present CONSTRUCTION SUPERINTENDENT 2007-Present Schedule, plan, organize and manage the overall commercial development for one of the largest companies in Utah ($500 million +/year). Responsibilities include preconstruction services, scheduling, building code compliance, purchasing of materials, quality control and project budget. Supervised various trade workers. Daily logs of job progression, take notes on visitors, changes of schedules.

KEY PROJECTS AND SELECTED ACCOMPLISHMENTS

Construction and completion of the new Moab Regional Hospital/Extemded Care Facility in Moab, Utah. Scheduling of subs, weekly sub & safety meetings, quality control of various trades word and self performed work.

Pre-construction services for the Box Elder High School Addition and Sports Field. A $35 million job involving site demolition, selective demolition, rough grading, construction in phases: Site & Utilities, New construction of classrooms, mechanical/electrical room, fitness rooms and kitchen & commons, Demolition of old building and construct remaining half of building.

Construction and completion of the Syracuse Public Works Building Addition. The $1.5 million, 8000 sq. ft., 2-story office addition to the existing public works added 10 new offices, a conference room, a receptionist lobby and a 2000 sq. ft classroom. The public works continued to operate without interruption during the 8 months of construction.

CONSTRUCTION FOREMAN 2006-2010 Assisted Superintendent, directed crews (concrete and excavation crews), organized the daily tasks, and directed safety meetings. Oversaw the site layout, building layout, columns, beams, stud walls, architectural concrete and design.

KEY PROJECTS AND SELECTED ACCOMPLISHMENTS

Assisted superintendents in construction of the new 2 story vocational tech building and elementary school for the Grand County School District in Moab, UT.

The $38 million Syracuse High School was built on a 52 acre site which included new baseball, softball, soccer and football fields. The high school was built in time for the 2007-2008 school year.

CARPENTER/LAYOUT MAN/SURVEYOR/IRONWORKER 2000-2006 Worked in various aspects of the construction phase from pre-construction services to the completion of each project. Site and building layout from footings and foundation, site utilities (gas, water, electrical, sewer, etc), masonry walls, structural steel (columns, beams, joist, girders and structural openings). Formed continuous footings and foundation walls with varies forming materials which consist of different widths and heights. Flatwork included exposed architectural concrete, varies sizes of concrete pours ranging from 81 sq. ft. to 10,000 sq. ft. Steel erection included the placement of columns, beams, joist and girders. Metal stud and dimensional wood framing. Installation of door frames, doors and hardware.

PROFESSIONAL DEVELOPMENT ACI Tilt up Technician Supervisor Certificate – January 2008 Heavy Equipment Certifications (Uni-loaders, gradall, backhoe and track hoe) – 2000

COMPUTER SKILLS

Computer literate; MS Office 2007 (Excel, Word, Outlook), Internet, Suretrak, Auto CADD, etc.



Contact this candidate