Post Job Free
Sign in

new job seeker

Location:
Garland, TX, 75042
Salary:
$18/hr
Posted:
May 21, 2009

Contact this candidate

Resume:

Juan Adan Rodriguez

**** ******** **.

Garland TX, 75042

Phone: 972-***-****

E-mail: *********@***.***

OBJECTIVE:

To secure a position involved with design, fabrication, and quality control of metal fixtures in a production environment with a company that will offer the opportunity for professional and personal growth.

SUMMARY:

Over seventeen years experience welding different types of metals. Fifteen years experience as a prototype developer for a metal fixtures company. More than ten years supervisory experience. Solely responsible for training junior employees in welding, bending, assembling, and repairing wire and metal fixtures. Responsible for quality control of all newly developed prototypes. Excel at accomplishing tasks under extreme time constraints.

SKILLS:

Leadership, Plasma metal cutting, Fork lift certified, Blue prints, Press break bending, High lift certified, Press break welding, Sheet metal shear, Loader certified, TIG welding, MIG welding, ARC welding, Tube bending, Air tools, Tube fitting, Sand blasting, Wire forming, Prototype development, Carpentry, Concrete laying, Maintenance

EXPERIENCE:

Lead Man/Prototype Developer Display Source LTD Apr 2000 - Apr 2009

Responsible for developing and implementing new ways to improve and expand the company’s product line. Responsible for cost and time efficiency on product development, while focusing on high quality standards. Solely responsible for the prototype development shop. Responsible for training and developing two new apprentices. Training included welding, tube bending and wire forming. Provide assistance in training operators how to repair defective items on the production line.

Equipment Maintenance/Prototype Developer Universal Display Co. Mar 1989- Mar 2000

Responsible for the maintenance, troubleshooting and repair of company machinery. Assisted in the rewiring of electrical runs for newly installed machinery. Installed water lines, gas lines and compressed air lines to facilitate operations on the production floor. Given the title of prototype developer after successfully improving and reinstating a series of products that had been obsolete after failing quality standards.

Foreman/Project Manager Construction contracting services Apr 1986- Mar 1989

Successfully lead a team of five employees. Accountable for tens of thousands of dollars worth of construction equipment. Responsible for the construction and refurbishing of over thirty homes. Solely responsible for safety procedures and training.

SPECIALIZED TRAINING:

Fork lift Certified

High lift Certified

Loader Certified

Welder (certified by Universal Display Co.)

Prototype Developer (certified by Universal Display Co.)

Leadership Training (provided by Universal Display Co.)



Contact this candidate