Post Job Free
Sign in

Project Plant

Location:
Kuala Lumpur, 436500, Singapore
Salary:
USD5000.00
Posted:
November 04, 2012

Contact this candidate

Resume:

NAME: M Noorzally B Ismail

ADDRESS: NO *, Jalan 7/3D, Seksyen 7, Bdr Baru Bangi, 43650 Selangor

TELEPHONE NO: 006***-*******(H/P), 006**-********(Hse)

YEAR OF BIRTH: 06.08.1968

NATIONALITY: Malaysian

LANGUAGES : English, B Malaysia

QUALIFICATION: MARA Technical of Institute

Advance in Piping Oil and Gas Industrial

Certificate in Structural

COURSES ATTENDED: Administering Microsoft Windows NT 4.0 – MCSB –( Feb 98)

Supporting M/S Windows NT 4.0 Core Technologies ( Mar 98)

Netware Service and Support (Novell – MCSB- (June 96)

Netware 3.1x Administration (Novell- MCSB- (Oct 95)

Plant Design System P&ID – (Internal by Intergrafik)

Micro station CAD Advance Drafting Techniques

PDS 3D Reviewer – Lurgi (India) – Nov 2006

COMPUTER LITERACY: MS-Word, Excel, Lotus, Novell & Windows NT Networking, Micro station & AutoCAD, I-Sketch-(for Isometric)

COUNTRY OF WORK: Thailand, Sudan, Canada, and Italy.

SUMMARY OF EXPERIENCE

More than 18 years project experience in design oil and gas industries pipeline & field production facilities. With exposure and knowledge of Code and Standard related to oil and gas engineering. Professionally trained as CAD System Administrator, System Networking, Electronic Document Management System and technical drawing development with regard to oil & gas industry. Skilled, competent and successfully tested in the system and networking of pipeline and plant engineering.

RESUME OF POSITION HELD

Position Held:

May 2012 – Present

ARMADA DINAMIK SDN BHD

SECONDED TO RNZ GROUP

PIPING CHECKER

1) WEST DIYARBEKIR OIL DEVELOPMENT PROJECT

2) EPIC OF WELL HEAD PLATFORM & LIVING QUATERS

• Review and clash check PDMS Drawing

• Checked Isometric GA & P&ID

• Prepared mark-up for spool drawings.

• Coordinate with others discipline on clash check

Position Held:

Dec 2010 – Apr 2012

Hyundai -PFC Engineering JV (Contract Staff)

Lead PDMS Team/Piping Checker.

1) PLANT REJUVENATION REVAMP 2 ( PRR2 ) – PETRONAS GAS BERHAD

• Review and clash check PDMS Drawing using cyclone –laser scanning.

• Updated & submitted status of drawings to EM

• Monitoring 9 PDMS Operators.

• Coordinate with others discipline on clash check

Piping Checker

Project Involved with:

2) PLANT REJUVENATION REVAMP 2 ( PRR2 ) – PETRONAS GAS BERHAD

Position Held:

Sept 2009 – Present

Ranhill Worley Parson.

Piping Designer

Project Involved with:

1) M3 – RELIEF VALVE REPLACEMENT & E11 AND LCOT– EXTINGUISHING WATER BASED SYSTEM

•

• As-built P&ID’s as per existing plant

• Prepare and check isometric

• Determine Tie-In Location at site

• Prepare demolition isometrics

• Prepare pipe supports locations and details

• Field verifications for revamp work

• Check at site for routing and clearance

• Assist construction team for construction

• Coordinate with others discipline on crash check

Position Held:

Jun 2008 – Aug 2009

Foster Wheeler E&C (Malaysia) Sdn Bhd.

Jun 2008 to Aug 2009

Piping Designer

Project Involved with: PSR 2 Revamp Project

2) PETRONAS PENAPISAN MELAKA SDN BHD (PPMSB).

• Work for Unit 22(Naptha Hydrotreater), 23(CCR Platformer), 25(C6 Isomerisation)

• Prepare and update Equipment Location Plan for plot plan review

• Prepare and update piping study and general arrangements

• As-built P&ID’s as per existing plant

• Prepare and check isometric

• Determine Tie-In Location at site

• Prepare demolition isometrics

• Prepare pipe supports locations and details

• Field verifications for revamp work

• Check at site for routing and clearance

• Assist construction team for construction

• Coordinate with others discipline on crash check

Position Held:

Sept 2006 – May 2008

Lurgi Sdn Bhd

PDS – Designer

3) PETRONAS (PML) MEGA METHANOL PROJECT – LABUAN.

• Update PDS system to ensure that all revisions are reflected on the system as latest revision.

• Operate the PDS Design Review

• Making sure that all available PDS Design Review is ready for operation.

• Update session of Design Review is loaded on all stations

• Update master list and drawing register

• Coordinates with main office in Frankfurt on PDS issues.

• Assist the Piping team, as well as client’s and contractor’s representatives during design review meetings, after consultation with Piping Superintendent

• Making sure that the drawings sent to Subcontractor are in the correct revision indices and that obsolete drawings are removed.

• Assist company Planner on compiling work progress status.

• Prepare Mechanical Completion Certificate for Contractor.

• Prepare punchlist status for MC application.

Position Held:

Sept 2005 – Sept 2006

Muhibbah Petrochemical Engineering

Piping Designer

4) TAR JATH DEVELOPMENT PROJECT (FPF PROJECT PACKAGE 3) - SUDAN

5) MAL A DEVELOPMENT PROJECT (FSF PROJECT) - SUDAN

• Detail design for pipe routing

• Coordinate with structure,civil,instrument & electrical on crash check

• Prepared & checking isometric drawing.

• Provided & checking material take-off.

• Coordinates with crossing and installation on crash check

• Prepared & check P & ID drawing

• Prepared pipe support

• Coordinate with engineers,site Inspector and construction team and prepared proposal and detail engineering drawing

Position Held:

October 1992 – 20 June 2005

OGP TECHNICAL SERVICES SDN BHD

Piping Designer

6) MELUT BASIN OIL DEVELOPMENT PROJECT (APS ENGINEERING,ROME(ITALY)/KHARTOUM,SUDAN)

7) GREATER DIFFRA EXPORT PIPELINE PROJECT (K.LUMPUR/HEGLIG,SUDAN)

8) MUGLAD BASIN DEVELOPMENT PROJECT ( CALGARY/ HEGLIG, SUDAN)

Responsible for the overall piping engineering design for the project as follow:

Coordinate Drafting work for plant section

All drawing are done in Autocad & Microstation

Detail design for pipe routing

Coordinate with structure,civil,instrument & electrical on crash check

Prepared & checking isometric drawing.

Provided & checking material take-off.

Coordinates with crossing and installation on crash check

Prepared & check P & ID drawing

Prepared pipe support

Coordinate with engineers,site Inspector and construction team

CADD SYSTEM ADMINISTRATOR

9) PRAI PNGV

10) PERLIS LATERAL

11) TANJUNG LANGSAT GDC PROJECT

12) BINTULU LPG BOTTLING PLANT

13) NEW MCOT CRUDE OIL TANK PROJECT

• Prepared and checked structural drawings

• Prepared and checked piping/mechanical drawings.

14) PROPANE DEHYDRO PROJECT

• Setting up and ensure ISDN line for transfer file/drawings between United Kingdom and Kuala Lumpur office will be running smoothly

• Setting up 10 user computer and printer for KTA staff at our office

• Provided troubleshoot service for server and printer problems

• Monitor server resources to track usage and disk space

• Backup-up and restore files and directories using tapes.

• Prepared and checked piping/mechanical drawings.

• Prepared and check Isometric

15) MLNG CONVERSION PROJECT

• Converted drawings from manual to Plant Design System (PDS)

16) YADANA PIPELINE PROJECT – ( Base in Bangkok Office)

• Setting up CAD system for Engineering phase in Kuala Lumpur

• Ensure efficient functioning of CAD system including maintenance of data backup system in the event of hardware failure.

• Provide training to draftsmen in Bangkok office.

• Ensure CAD department in Bangkok office is running smoothly.

• Established personal and shared network security system

• Prepared and checked piping/mechanical drawings.

• Prepared and check Isometric

17) PGU 111 – LOOP 1 & 2 PROJECT

• Set-up server, workstation & network service hardware and software

• Established personal and share network storage for data and application files.

• Established and maintain a network security system.

• Monitor server resources to track usage and disk space

• Back-up & restore files and directories using tapes

• Prepared Piping/Route and Profile Drawings

• Prepared and checked piping/mechanical drawings.

• Prepared and check Isometric

18) LUMUT METER STATION

19) GURUN AND PERLIS METER STATION

20) PETRONAS ENERGY PHILLIPINE

21) GAS PROCESSING PLANT (GPP 5 & 6)

• Set-up server, workstation & network service hardware and software

• Established personal and share network storage for data and application files.

• Established and maintain a network security system.

• Monitor server resources to track usage and disk space

• Back-up & restore files and directories using tapes

• Prepared Piping Drawings ( Plot Plan,P&ID & Isometric Drawings)

• Prepared and checked piping/mechanical drawings.

• Prepared and check Isometric

Position Held:

March 1991 – August 1992

ANTAH BIWATER JV

Draftsman

22) RURAL WATER SUPPLY SCHEME

• Involved in Pipeline Water Treatment Facilities, Vessel, Reservoir, Construction and installation works for East Cost Area (Kelantan, Terengganu & Pahang)

Position Held:

March 1991 – August 1992

MALAYSIAN MINING CORPORATION (MMC)

Draftsman

23) FELDA PETROCHEMICAL PROJECT (FPG)

• Prepared electrical and piping drawings

Reference : Mr Radzin Ismail

Principle Engineer

Project Management Division

Group Technology Solutions, Research & Technology Division

Level 6, Menara Dayabumi

Kuala Lumpur

012-*******

Mr Paimin Kasimon

Project HSE Manager

Petronas Carigali Sdn Bhd

Level 23, Tower 1

KLCC

Kuala Lumpur

03-20517924

019-*******



Contact this candidate