NAME: M Noorzally B Ismail
ADDRESS: NO *, Jalan 7/3D, Seksyen 7, Bdr Baru Bangi, 43650 Selangor
TELEPHONE NO: 006***-*******(H/P), 006**-********(Hse)
YEAR OF BIRTH: 06.08.1968
NATIONALITY: Malaysian
LANGUAGES : English, B Malaysia
QUALIFICATION: MARA Technical of Institute
Advance in Piping Oil and Gas Industrial
Certificate in Structural
COURSES ATTENDED: Administering Microsoft Windows NT 4.0 – MCSB –( Feb 98)
Supporting M/S Windows NT 4.0 Core Technologies ( Mar 98)
Netware Service and Support (Novell – MCSB- (June 96)
Netware 3.1x Administration (Novell- MCSB- (Oct 95)
Plant Design System P&ID – (Internal by Intergrafik)
Micro station CAD Advance Drafting Techniques
PDS 3D Reviewer – Lurgi (India) – Nov 2006
COMPUTER LITERACY: MS-Word, Excel, Lotus, Novell & Windows NT Networking, Micro station & AutoCAD, I-Sketch-(for Isometric)
COUNTRY OF WORK: Thailand, Sudan, Canada, and Italy.
SUMMARY OF EXPERIENCE
More than 18 years project experience in design oil and gas industries pipeline & field production facilities. With exposure and knowledge of Code and Standard related to oil and gas engineering. Professionally trained as CAD System Administrator, System Networking, Electronic Document Management System and technical drawing development with regard to oil & gas industry. Skilled, competent and successfully tested in the system and networking of pipeline and plant engineering.
RESUME OF POSITION HELD
Position Held:
May 2012 – Present
ARMADA DINAMIK SDN BHD
SECONDED TO RNZ GROUP
PIPING CHECKER
1) WEST DIYARBEKIR OIL DEVELOPMENT PROJECT
2) EPIC OF WELL HEAD PLATFORM & LIVING QUATERS
• Review and clash check PDMS Drawing
• Checked Isometric GA & P&ID
• Prepared mark-up for spool drawings.
• Coordinate with others discipline on clash check
Position Held:
Dec 2010 – Apr 2012
Hyundai -PFC Engineering JV (Contract Staff)
Lead PDMS Team/Piping Checker.
1) PLANT REJUVENATION REVAMP 2 ( PRR2 ) – PETRONAS GAS BERHAD
• Review and clash check PDMS Drawing using cyclone –laser scanning.
• Updated & submitted status of drawings to EM
• Monitoring 9 PDMS Operators.
• Coordinate with others discipline on clash check
Piping Checker
Project Involved with:
2) PLANT REJUVENATION REVAMP 2 ( PRR2 ) – PETRONAS GAS BERHAD
Position Held:
Sept 2009 – Present
Ranhill Worley Parson.
Piping Designer
Project Involved with:
1) M3 – RELIEF VALVE REPLACEMENT & E11 AND LCOT– EXTINGUISHING WATER BASED SYSTEM
•
• As-built P&ID’s as per existing plant
• Prepare and check isometric
• Determine Tie-In Location at site
• Prepare demolition isometrics
• Prepare pipe supports locations and details
• Field verifications for revamp work
• Check at site for routing and clearance
• Assist construction team for construction
• Coordinate with others discipline on crash check
Position Held:
Jun 2008 – Aug 2009
Foster Wheeler E&C (Malaysia) Sdn Bhd.
Jun 2008 to Aug 2009
Piping Designer
Project Involved with: PSR 2 Revamp Project
2) PETRONAS PENAPISAN MELAKA SDN BHD (PPMSB).
• Work for Unit 22(Naptha Hydrotreater), 23(CCR Platformer), 25(C6 Isomerisation)
• Prepare and update Equipment Location Plan for plot plan review
• Prepare and update piping study and general arrangements
• As-built P&ID’s as per existing plant
• Prepare and check isometric
• Determine Tie-In Location at site
• Prepare demolition isometrics
• Prepare pipe supports locations and details
• Field verifications for revamp work
• Check at site for routing and clearance
• Assist construction team for construction
• Coordinate with others discipline on crash check
Position Held:
Sept 2006 – May 2008
Lurgi Sdn Bhd
PDS – Designer
3) PETRONAS (PML) MEGA METHANOL PROJECT – LABUAN.
• Update PDS system to ensure that all revisions are reflected on the system as latest revision.
• Operate the PDS Design Review
• Making sure that all available PDS Design Review is ready for operation.
• Update session of Design Review is loaded on all stations
• Update master list and drawing register
• Coordinates with main office in Frankfurt on PDS issues.
• Assist the Piping team, as well as client’s and contractor’s representatives during design review meetings, after consultation with Piping Superintendent
• Making sure that the drawings sent to Subcontractor are in the correct revision indices and that obsolete drawings are removed.
• Assist company Planner on compiling work progress status.
• Prepare Mechanical Completion Certificate for Contractor.
• Prepare punchlist status for MC application.
Position Held:
Sept 2005 – Sept 2006
Muhibbah Petrochemical Engineering
Piping Designer
4) TAR JATH DEVELOPMENT PROJECT (FPF PROJECT PACKAGE 3) - SUDAN
5) MAL A DEVELOPMENT PROJECT (FSF PROJECT) - SUDAN
• Detail design for pipe routing
• Coordinate with structure,civil,instrument & electrical on crash check
• Prepared & checking isometric drawing.
• Provided & checking material take-off.
• Coordinates with crossing and installation on crash check
• Prepared & check P & ID drawing
• Prepared pipe support
• Coordinate with engineers,site Inspector and construction team and prepared proposal and detail engineering drawing
Position Held:
October 1992 – 20 June 2005
OGP TECHNICAL SERVICES SDN BHD
Piping Designer
6) MELUT BASIN OIL DEVELOPMENT PROJECT (APS ENGINEERING,ROME(ITALY)/KHARTOUM,SUDAN)
7) GREATER DIFFRA EXPORT PIPELINE PROJECT (K.LUMPUR/HEGLIG,SUDAN)
8) MUGLAD BASIN DEVELOPMENT PROJECT ( CALGARY/ HEGLIG, SUDAN)
Responsible for the overall piping engineering design for the project as follow:
Coordinate Drafting work for plant section
All drawing are done in Autocad & Microstation
Detail design for pipe routing
Coordinate with structure,civil,instrument & electrical on crash check
Prepared & checking isometric drawing.
Provided & checking material take-off.
Coordinates with crossing and installation on crash check
Prepared & check P & ID drawing
Prepared pipe support
Coordinate with engineers,site Inspector and construction team
CADD SYSTEM ADMINISTRATOR
9) PRAI PNGV
10) PERLIS LATERAL
11) TANJUNG LANGSAT GDC PROJECT
12) BINTULU LPG BOTTLING PLANT
13) NEW MCOT CRUDE OIL TANK PROJECT
• Prepared and checked structural drawings
• Prepared and checked piping/mechanical drawings.
14) PROPANE DEHYDRO PROJECT
• Setting up and ensure ISDN line for transfer file/drawings between United Kingdom and Kuala Lumpur office will be running smoothly
• Setting up 10 user computer and printer for KTA staff at our office
• Provided troubleshoot service for server and printer problems
• Monitor server resources to track usage and disk space
• Backup-up and restore files and directories using tapes.
• Prepared and checked piping/mechanical drawings.
• Prepared and check Isometric
15) MLNG CONVERSION PROJECT
• Converted drawings from manual to Plant Design System (PDS)
16) YADANA PIPELINE PROJECT – ( Base in Bangkok Office)
• Setting up CAD system for Engineering phase in Kuala Lumpur
• Ensure efficient functioning of CAD system including maintenance of data backup system in the event of hardware failure.
• Provide training to draftsmen in Bangkok office.
• Ensure CAD department in Bangkok office is running smoothly.
• Established personal and shared network security system
• Prepared and checked piping/mechanical drawings.
• Prepared and check Isometric
17) PGU 111 – LOOP 1 & 2 PROJECT
• Set-up server, workstation & network service hardware and software
• Established personal and share network storage for data and application files.
• Established and maintain a network security system.
• Monitor server resources to track usage and disk space
• Back-up & restore files and directories using tapes
• Prepared Piping/Route and Profile Drawings
• Prepared and checked piping/mechanical drawings.
• Prepared and check Isometric
18) LUMUT METER STATION
19) GURUN AND PERLIS METER STATION
20) PETRONAS ENERGY PHILLIPINE
21) GAS PROCESSING PLANT (GPP 5 & 6)
• Set-up server, workstation & network service hardware and software
• Established personal and share network storage for data and application files.
• Established and maintain a network security system.
• Monitor server resources to track usage and disk space
• Back-up & restore files and directories using tapes
• Prepared Piping Drawings ( Plot Plan,P&ID & Isometric Drawings)
• Prepared and checked piping/mechanical drawings.
• Prepared and check Isometric
Position Held:
March 1991 – August 1992
ANTAH BIWATER JV
Draftsman
22) RURAL WATER SUPPLY SCHEME
• Involved in Pipeline Water Treatment Facilities, Vessel, Reservoir, Construction and installation works for East Cost Area (Kelantan, Terengganu & Pahang)
Position Held:
March 1991 – August 1992
MALAYSIAN MINING CORPORATION (MMC)
Draftsman
23) FELDA PETROCHEMICAL PROJECT (FPG)
• Prepared electrical and piping drawings
Reference : Mr Radzin Ismail
Principle Engineer
Project Management Division
Group Technology Solutions, Research & Technology Division
Level 6, Menara Dayabumi
Kuala Lumpur
Mr Paimin Kasimon
Project HSE Manager
Petronas Carigali Sdn Bhd
Level 23, Tower 1
KLCC
Kuala Lumpur
03-20517924