EXPERIENCED MISSION ASSURANCE ENGINEER

Summary

Performs analysis of system configurations and / or individual equipment to verify satisfactory conformance with safety, quality, and / or engineering standards.

Generates fault trees, failure mode and effect analyses, and / or hazard analyses that identify situations where design and / or operational documents either fail to include or fail to satisfactorily integrate applicable requirements.

Utilizes root cause deterministic processes to eliminate or acceptably reduce recurring problems so as to improve schedule and / or cost without compromising quality and / or safety.

Familiar with MIL-STD-882, MIL-STD-1629, FAR, IEC, NFPA, OSHA, NASA Policy Directives, NASA Policy Guidelines, and other regulatory type requirements.

Familiar with Relux Studio and CAFTA analytical software. Also familiar with Microsoft Office software products.

Degree - BS: Electrical Engineering Technology, South Carolina State University.

Experience

Reliability Engineer

United Space Alliance

Kennedy Space Center, Fl

1996 to 2010

Analysis of the Launch Complex 39A and Launch Complex 39B Potable Water Systems, Firex Water Systems, Sound Suppression Water Systems and Hypergol Servicing Systems.

Analysis of the Firex Water Pumphouse at the Hypergolic Maintenance Facility, at the Vehicle Assembly Building Utility Annex, and at the Pad Pumpstation.

Analysis of the 60-Hertz Low Voltage Power Distribution System at the Vehicle Assembly Building, the 60-Hertz Low Voltage Power Distribution System at the Shuttle Landing Facility, the Microwave Scanning Beam Landing System at the Shuttle Landing Facility, and the Hypergol Deservicing System located at Orbiter Processing Facility High Bays 1, 2, & 3.

Reviewed and approved changes to pre-planned system test procedures and/or problem report corrective action plans (including limited-use and/or use-as-is material review dispositions) to ensure such changes did not violate applicable programmatic and/or regulatory requirements.

Researched failure data to ensure field equipment did not depict an unanticipated unacceptable risk and to verify existing mitigation efforts continued to be satisfactory.

Corrective Action Engineer

Lockheed Martin Space Operations Company

Kennedy Space Center, Fl

1987 to 1996

Researched failure data, operations and maintenance documents, programmatic and/or regulatory requirements, manufacturer’s suggestions and/or performed real-time audits of operational activities to confirm or deny a problem should be classified as a recurring problem negatively impacting the cumulative processing effort.

Prevented undesirable schedule impacts and realized either cost savings or cost avoidances by resolving situations classified as a recurring problem negatively impacting the cumulative processing effort.

Reviewed and approved changes to pre-planned system test procedures and/or problem report corrective action plans (including limited-use and/or use-as-is material review dispositions) to ensure such changes did not violate applicable programmatic and/or regulatory requirements.

System Engineer

Lockheed Space Operations Company

Vandenberg Air Force Base, Ca

1985 to 1986

Edited pre-planned system test procedures, generated and implemented corrective action plans for Ground Support System Equipment at Vandenberg Air Force Base associated with the Orbital Maneuvering System / Reaction Control System.

Design Engineer

Planning Research Corporation

Systems Services Company

Kennedy Space Center, Fl

1977 to 1985

Prepared detailed drawings that modified portions of the Facility Cable System at each launch pad, MLP, OPF high bay, the VAB, and the LCC as well as the underground Plant-In-Place Cable System to obtain optimum and economical utilization of communication capabilities at Kennedy Space Center.

Created a record drawing that depicted cable interconnections of the Facility Cable System at each major facility including the eventual connection location on the Orbiter's 0-1 and 0-2 umbilical interfaces.

Estimated equipment, labor and material costs.

Successfully managed a three-person team performing all modifications to the Facility Cable System at Kennedy Space Center.