CURRICULUM VITAE
Hafiz Ali Alvi
Chemical Engineer
Personal Details
• Present Address: House # 39, Crown Park, Baghbanpura,
Lahore 54920 Pakistan.
• Cell #. 009***********(Preferred Contact)
• E-mail: ***********@*******.***
• Nationality: Pakistani
• Date of Birth: Feb. 13, 1982
• Health Status: Good - No known illness or disability
• Language: Proficient in English & Urdu
Qualification.
Chemical Engineer with a good background and knowledge in the fields of Oil & Gas and Fertilizer Projects. Ample experience as a team member of different projects task force in high-pressure Quality Assurance environments.
Key Skill Qualifiers
• Piping Layouts and Isometrics Drawings.
• Piping material components.
• Preparation of piping design specifications.
• Preparation of piping material specifications.
• Piping material requisitions.
• Pipe wall thickness calculations and verification.
• Vendor clarification and technical bid evaluations.
• Piping relevant Codes & Standards.
• P&ID / PFD Study.
• Introduction to plot plans.
• Introduction to piping layouts / Piping plans.
Key Projects & Positions
1- Warranty Works Project, Petro Rabigh, Saudi Arabia (Nov 2010 to Date)
Position: Piping Materials / Design Engineer with following Responsibilities.
• Checking of final ISO Dwg.
• Preparation of Piping BM / BQ for construction.
• Technical support to procurement for the purchasing of material.
• Vendor technical clarification and bid evaluation.
• Field Engineering, support to piping construction team for site construction.
• Preparation of piping test packages.
2- Bulk Liquid Chemical Terminal (BLCT),ACT, Jubail, Saudi Arabia 10,000 MHS (May 2010 to Nov 2010)
Position: Lead Engineer (Piping Materials) with following Responsibilities.
• Preparation of piping material specifications.
• Preparation of piping design, Painting, Coating and Wrapping specifications.
• Preparation of specialty item requisition. (Pig Launcher and Receiver, Top Loading Arms, PSV, Strainers, RO, Cargo Hoses, Fire Fighting Euipments etc.)
• Preparation of piping bulk items requisitions.
• Vendor clarifications and technical bid evaluation report making..
• Checking of final MTO / Isometric drawings.
• Verification / Checking of feed documents related to piping materials/items.
3- ISOLATION OF TRUNKLINES PROJECT, ADCO, UAE (Dec 2009 to Jun 2010)
Position: Assistant Engineer (Piping Design) with following Responsibilities.
• Checking and Issuance of modified plot plan.
• Checking and Issuance of modified piping Layouts.
• Checking and Issuance of tie-in isometrics.
• Preparation of piping material specifications.
• Preparation of piping bulk items requisitions
• Vendor clarifications and technical bid evaluation report making.
• Checking of final MTO
4- Engro CO2 Recovery Project, Engro Chemicals, Dharki Pakistan 24,000 MHS (Dec 2008 to Feb 2010)
Position: Lead Engineer (Piping Materials) with following Responsibilities.
• Preparation of piping material specifications.
• Preparation of piping design specifications
• Preparation of specialty item requisition. (PSV, Strainers, RO, Level Gauges, spring support etc.)
• Preparation of piping bulk items requisitions
• Vendor clarifications and technical bid evaluation report making.
• Checking of final MTO / Isometric drawings extracted from PDS.
• Verification / Checking of feed documents related to piping materials/items.
5- 225 MW Bhikki Power Plant, Bhikki, Pakistan 30,000 MHS (July 2009 to Dec 2009)
Position : Lead Engineer (Piping Materials) with following Responsibilities.
• Checking of piping material specification.
• Preparation of data sheets and requisition for the following items;
o Strainers
o Safety Relief Valves
o Automatic Recirculation Valves
o Vacuum Breaker
o Flame Arrestors
o Restriction Orifice
o Steam Traps
o Hose Couplings
• Vendor clarifications and Technical Bid Evaluation Report Making.
6- Sulfur Recovery Unit, OGDCL, Dhakni Pakistan (Apr 2009 to June 2009)
Position : Lead Engineer (Piping Materials) with following Responsibilities.
• Preparation of data sheets and requisition for the following items;
o Strainers
o Jacketed Ball Valves
o Jacketed Plug Valves
o Spectacle Blinds
o Hose Couplings
• Preparation of MTO for piping specialty items.
7- Proposal for Fertil – 2 Project, Ruwais, UAE (Feb 2009 to Mar 2009)
Position : Lead Engineer (Piping Materials) with following Responsibilities.
• Preparation of specialty item requisition. (PSV, Strainers, RO, Sight Glass, Level Gauges, spring support, Silencer etc.)
• Preparation of piping bulk items requisition.
• Preparation of piping BOQ e.g. Insulation, Painting, Coating and Wrapping, Painting, Inch Dia. etc.
• Vendor clarifications and technical bid evaluation report making.
• Checking of final MTO / Isometric drawings.
8- Urea Debottlenecking Project, Fertil, Ruwais, UAE, 70,000 MHS (July 2007 to Dec 2008)
Position : Assistant Engineer (Piping Materials) with following Responsibilities.
• Preparation of piping material specifications.
• Preparation of piping design specifications
• Preparation of specialty item requisition. (PSV, Strainers, RO, Sight Glass, Level Gauges, spring support, Silencer etc.)
• Preparation of piping bulk Items requisitions
• Preparation of general specifications e.g. Color Coding for Piping Materials, Coating and Wrapping, Painting etc.
• Preparation of piping BOQ e.g. Insulation, Painting, Coating and Wrapping, Painting, Inch Dia. etc.
• Vendor clarifications and technical bid evaluation report making.
• Checking of final MTO / Isometric drawings.
9- ADCO Hipps, ADCO , UAE ( Feb 2007 to Jun 2007)
Position: Assistant Engineer with following responsibilities.
• Preparation of detail piping material specification.
• Preparation of Isometric drawings
• MTO Preparation for construction.
• Checking of overall MTO.
10- Compressor Station 7, Bahrain Gas Company, Bahrain. (Aug 2006 – Jan 2007)
Position: Assistant Trainee Engineer.
• Study of P&ID’s
• Checking of Plot Plans.
11- Parco Oil Refinery Turn Around 2. (16 Days)
Position: QHSE Inspector for DESCON Engineering Pvt. Ltd.
• Work as quality inspector for the checking of;
o Distillation Columns
o Heat Exchangers
o Drums and Tanks.
• Monitor cleaning of equipments and final box up of equipment with client approval.
Employment History
Employer: JGC GULF International Co. Ltd, Al-khobar, November 2010 to Date
I have joined JGC Gulf as Piping Material Engineer. I am working as Piping Material / Design Engineer on Petro Rabigh Warranty Works Project.
Current Project: Warranty Modification Project, Petro Rabigh, Rabigh, KSA
Position: Piping Material / Design Engineer
Reporting to: Piping Lead Engineer
Duties: Technical support to procurement for the purchasing of material.
Vendor technical clarification and bid evaluation.
Field Engineering, support to piping construction team for site construction.
Preparation of piping test packages.
Employer: DESCON INTEGRTED PROJECTS (Pvt.) LIMITED. (Previously known as JGC-DESCON ENGINEERING PVT. LIMITED). Lahore, Pakistan---- July 2006 to Nov 2010
I started my professional career with Descon Integrated Projects Pvt. Limited (Formally known as JGC-Descon,A joint venture of JGC and Descon Engineering) as ENGINEER. I worked in on different projects as piping material engineer. Now
Education
B.Sc. Chemical Engineering 2006
Institute of Chemical Engineering & Technology, University of The Punjab,
Lahore, Pakistan
Computer Skills
• Microsoft Office
• M. S. Visio
• Navis Works used for 3D view.
• Adobe Acrobat Reader
• Windows Operating System
Membership
• Member Pakistan Engineering Council : Chem / 6678
Internship / Training
• 1 Month Training in Century Paper and Board Mills (Pvt.) Limited, Pattoki – Lahore, Pakistan
References:
References can be provided upon request.