On-site Project Engineer with 15-year record of on time success in a multitude of construction settings. Experienced with coordinating the $23M Interior General Trades contract at the new Indianapolis Midfield Terminal project and supervising crews of up to 12 carpenters on various projects that include Conseco Field house, (Indianapolis, IN), the 4 story Unity Junior High School, (Cicero, IL) and buildings 130/207 at the Dupont Hospital Campus (Fort Wayne, IN). Work experiences prior to 1990 involved building and managing multiple units for a national restaurant chain in the metro areas of Washington DC. / Nashville, TN.
TECHNICAL SKILLS:
• Experienced w/ hardware installations for INGERSOLL RAND/VON DUPRIN, YALE, SARGENT, LOCKNETIC, ADAMS-RITE, PEMCO, KABA and SCHLAGE
• Electronic hardware integration experience/knowledge
• Proficient in reading and understanding blueprints and construction specifications
• ADA & Fire-Life Safety experience/knowledge
• As Built and Design Build drafting/submittals
• LEEDS compliance experience
Experienced w/ installation methods for:
• Metal Stud/Drywall Systems
• Shaft Wall Systems
• Trespa / Alucobond composite wall panels (phenolic)
• Intumescent / CAFCO fireproofing applications
• Accordion/Coiling Overhead Doors
• Loading Dock equipment
• Composite and Stainless Steel Partitions
Computer Skills:
• Microsoft Office (Excel, Power Point, Word, etc,,)
• Adobe Photoshop
• Prolog
EMPLOYMENT:
Smoot Construction, L.L.C. - Indianapolis, IN 2006-2009
New Indianapolis Airport Midfield Terminal Project
Project Engineer responsible for coordination of items contained within the scopes of Divisions 5 thru 12, Interior General Trades. Primary areas of concern were with integration of security software and electronic hardware at all secured points of entry as well as construction of several different drywall/metal stud systems along security and fire-life safety corridors.
Selected Contributions:
• Successfully revised/implemented/managed installation schedules during 5 month delay in project due to structural steel incident.
• Coordinated/detailed 3 hour fire rating changes to security line walls, frames/doors after airlines switched from electric to diesel tugs.
• Recommended changes to hardware schedule, prior to ordering, after preliminary examination revealed incompatibilities involving numerous hardware sets.
1994-2005 Supervisor/Foreman, Estimator, DHI Inc. / Local #60, Indianapolis, IN.
• Extensive experience with the installation of wood/metal doors, frames and hardware
• Experience with installation/integration of electronic high security hardware
• Supervision for crews of up to 12 carpenters
• Metal Studs and Drywall
• Phenolic and SS partitions
• Custom Cabinets/Trim installations
• Duties included estimating and contract submittals
1990-1994 Design/Detail Draftsman, ACA Calumet / Eli Lilly, Indianapolis, IN.
• Utilities and Maintenance Engineering Department at Eli Lilly
• Design/Detail drafting of utilities used in the manufacturing process
• Process Systems design/detail and drafting
• Process Systems Design and Implementation Team
• Trained in AutoCAD, AutoTROL
EDUCATION:
A.A.S. Computer Programming. I.V.T.C. (Indiana Vocational Technical College)
A.A.S. Construction Technology/Applications. I.V.T.C./Vincennes University. (Journeymen Apprentice Training Program)
REFERENCES:
Joe Raper – ADG (Aero Design Group) 317-***-**** (******@******.***)
Adam Wilensky – Smoot Construction 317-***-**** (*********@*******.***)
Yngvar Brynildssen – Kaman Inc 317-***-**** (******.***********@*****.***)