Personal information
CV title Electrical Superintendent,
Commissioning specialist
Name Mohammadreza Ardehi
Date of birth 30.01.1970
Gender Man
Country Malaysia
Telephone 006**********
Telephone +601********
E-mail ******@*****.***
Marital status Married
Occupational status Freelance
Education
Period Degree School Subject
1988.09.01 - 1991.08.01 Associated Degree Institute technology chamran Electrical subjects
design & analyse for ac machine(I,II,III), dc machine(I,II), transformers(I,II),
electronic, protection relays, power generation & distribution, project control, physic of electricity ,circuit electric (I,II,III), engineering mathematics, elec. motor, workshop related to all items before, some general course
1984.09.01 - 1988.08.01 Diploma Technical High school Chamran Electrical subjects
technical calculation, technical course, workshops(for
years, 16houres every week) industrial workshop,
electrical circuits, motor, electronic, transformer
Experience
Period Company Position title Business sector
2010.09.01 - 2011.11.01 Petropars Operation Management co. Head of Electrical Oil
Data base preparation for CMMS plan procedure.
Preparation a list of equipment as system approach such as pyramid list for MAINTA software. such as TOTAL prepared in 2 phases in south pars.
Critical assessment, PPM creation, shutdown type and shutdown constrain, isolatable type and isolation tag, and any data related to maintenance and repair of each one of equipment. Plan maintenance as agenda accorded the manufactures and plan production procedure. installations (prepare database for MAINTA software such as equipment list and for each one, shutdown type, shutdown constraints, isolatable tag, isolation type and PPM.)
2008.03.01 - 2010.08.01 South pars (MBPG) commissioning engineer Oil
Document preparation, FEED engineering for pre-com. & commissioning such as OPERCOM strategy prepared by TOTAL FINA ELF in phases 2,3 and by Eni in phases 4,5 as OPERCOM strategy .
Document preparation for pre-com. and commissioning not only related to commissioning plan, also it is clear every department as procurement and construction if the plan assigned such as OPERCOM strategy. Alternatively, plan.
First by systemization approach, define system and subsystem. Utility necessary as turndown ratio, and by how many of packages it be prepare, these data by investigation in engineering documents preparation in basic design should be do, and after marked-up P&ID, PFD and SLD any disciplines can be extract its equipment related to each subsystem as status index, define priority as milestone strategy.
Priority and milestone defined, as first start-up, first gas-in in a gas refinery, so which units and which packages included in first milestone. This plan by conformity SLD, P&ID and PFD marked up.
Punch list procedure and preparation these data as software necessary like ICAPS, or others project created.
2007.03.01 - 2008.03.01 Petropars LTD electrical commissioning supervisor Oil
Pre-commissioning & Commissioning all panels, transformers, Motor, heater,...all electrical equipment of a huge gas refinery included 6 train (production lines) utility, reception facility.
cathodic protection, lighting, earthing, lightning, VSD panels and motors.
coordination with commissioning group and operation team, and also preservation maintenance.
support vendors specialist on site.
2003.09.01 - 2007.03.01 Eni Italy (Agip) electrical supervisor Oil
construction and commissioning supervisor,
Pre-commissioning of electrical status index of subsystems
Visual inspection of equipment ( motors , cables, transformers,...)
Compliance with Project specs , safety rules, codes,
Quality of installation, Static Tests of equipment
« Cold testing » : calibration of instruments, machinery alignement ,(De-energised tests), static test
enter the result in ICAPS software, punch list preparation, up to RFC (Ready for commissioning)
commissioning
Electrical motors uncoupled runs , electrical breakers operation
Running-in and on-line tests of plant utilities, and main process equipment in closed loop (wherever applicable), Dynamic test
up to RFCU(ready for start-up
the plan strategy such as OPERCOM (TOTAL FINA ELF strategy)
control as subsystem and system status index, of everyone of
performance test and coordination with method and maintenance group for preservation maintenance
and in operation during, WDN (warranty defected notification)
2002.01.01 - 2003.08.01 Poolad consultant engineers co E&I supervisor Shipping
The shipping Port in MAHSHAHR, include:
ship unloaded, stacker reclaimed & train loading include,
more than 6 km belt conveyer
Electrical and instrument & control
equipment in BIKOT project
Construction & commissioning of all electrical equipment & instrument devices.
Project analyze and control the progress
1998.09.01 - 2002.01.01 MOSHANIR(electrical engineers consultant) Projects coordinator and supervisor Energy
Electrical Construction & Commissioning Supervisor & Welding inspector , Project coordinator
consultant and supervision of EHV substation and power plant switchgear supervision of projects (KARKHE, KAROON3, MASJED SOLEYMAN, CHOGHADAK, DIVANDAREH, BOOSHEHRE2) & 400KV/230KV/132KV/66KV/20KV Substations equipment disconnected switch, circuit breaker, CT, PT, REACTOR, 400/230/132/60/20kv trans., protection relays (CBF, distance, directional?) in control panels.
supervision of power station basic design & construction, commissioning
aluminum bas-bar welding inspector
provide as-built drawings
control contractors invoice
Prepare learning course for construction and Commissioning supervisor.
1995.04.01 - 1998.08.01 Hard metal project head of maintenance Production
Install & startup machines (spark, wire cut, chamfer, sintering, spray dryer, CVD, PVD?). Main factors: Japan TOOSHIBA TANGOLO
prepare maintenance planning
prepare procedure planning
define the critical point in procedure train
1994.01.01 - 1995.03.01 NIPC(national Iranian Petroleum Co.) electrical supervisor Oil
electrical supervision, BUTTACOLOR & ALACOLOR site
plant producer plant provide call of tender documents control contractor
invoice
Design power distribution in construction during
lighting design(material storage, street lighting)
Key competence
I am good familiar to OPERCOM strategy actually in last 10 years I work on it directly in five gas and oil project.
good familiar in system approach,
ICAPS software operation and database preparation
CMMS (computerization maintenance management system) behalf ICAPS by MAINTA software, and also IFS software
Electrical superintendent,
Switchgears relay protection, transformer, electro motors, PDMS, PDS, relay coordination, cathodic protection, lighting, lightening, all check and test as checklist and test procedure
Commissioning engineer
Method and maintenance planer
Construction manager
Management of document preparation of Pre-com. and commissioning managing
CMMS plan procedure and database preparation
Everything above for onshore and offshore facility
And maintenance, preparation database for CMMS plan as critical assessment, PPM, scheduling tag (relation equipment in a same package or same duty), Shutdown type Shutdown constraints, Isolatable tag and isolation type, reliability.
Other experience, positions of trust, interests etc
Ability to work with planning software packages
Experienced in preparing reports such as weekly report & monthly report
Experience in Preparing work breakdown structure (WBS) and coding the project
Preparing of Project Invoices
Good teamwork motivation and time management ability
Ability in define interface point to point between disciplines and contractors and areas.
Ability for manage and lead disciplines in project.
Language
Persian (Farsi)
English
Turkish
Arabic
Preferences for future positions
Electrical supervisor
commissioning engineer
method and maintenance planer
Pre-commissioning and commissioning data preparation
Job category Contract
Personnel responsibility Yes
Result responsibility Yes
Ready to relocate Yes
Term of notice in current Less than 1 month