Post Job Free
Sign in

Electrical Project

Location:
kuala lumpur, 53300
Salary:
80000 per year
Posted:
January 06, 2012

Contact this candidate

Resume:

Personal information

CV title Electrical Superintendent,

Commissioning specialist

Name Mohammadreza Ardehi

Date of birth 30.01.1970

Gender Man

Country Malaysia

Telephone 006**********

Telephone +601********

E-mail ******@*****.***

Marital status Married

Occupational status Freelance

Education

Period Degree School Subject

1988.09.01 - 1991.08.01 Associated Degree Institute technology chamran Electrical subjects

design & analyse for ac machine(I,II,III), dc machine(I,II), transformers(I,II),

electronic, protection relays, power generation & distribution, project control, physic of electricity ,circuit electric (I,II,III), engineering mathematics, elec. motor, workshop related to all items before, some general course

1984.09.01 - 1988.08.01 Diploma Technical High school Chamran Electrical subjects

technical calculation, technical course, workshops(for

years, 16houres every week) industrial workshop,

electrical circuits, motor, electronic, transformer

Experience

Period Company Position title Business sector

2010.09.01 - 2011.11.01 Petropars Operation Management co. Head of Electrical Oil

Data base preparation for CMMS plan procedure.

Preparation a list of equipment as system approach such as pyramid list for MAINTA software. such as TOTAL prepared in 2 phases in south pars.

Critical assessment, PPM creation, shutdown type and shutdown constrain, isolatable type and isolation tag, and any data related to maintenance and repair of each one of equipment. Plan maintenance as agenda accorded the manufactures and plan production procedure. installations (prepare database for MAINTA software such as equipment list and for each one, shutdown type, shutdown constraints, isolatable tag, isolation type and PPM.)

2008.03.01 - 2010.08.01 South pars (MBPG) commissioning engineer Oil

Document preparation, FEED engineering for pre-com. & commissioning such as OPERCOM strategy prepared by TOTAL FINA ELF in phases 2,3 and by Eni in phases 4,5 as OPERCOM strategy .

Document preparation for pre-com. and commissioning not only related to commissioning plan, also it is clear every department as procurement and construction if the plan assigned such as OPERCOM strategy. Alternatively, plan.

First by systemization approach, define system and subsystem. Utility necessary as turndown ratio, and by how many of packages it be prepare, these data by investigation in engineering documents preparation in basic design should be do, and after marked-up P&ID, PFD and SLD any disciplines can be extract its equipment related to each subsystem as status index, define priority as milestone strategy.

Priority and milestone defined, as first start-up, first gas-in in a gas refinery, so which units and which packages included in first milestone. This plan by conformity SLD, P&ID and PFD marked up.

Punch list procedure and preparation these data as software necessary like ICAPS, or others project created.

2007.03.01 - 2008.03.01 Petropars LTD electrical commissioning supervisor Oil

Pre-commissioning & Commissioning all panels, transformers, Motor, heater,...all electrical equipment of a huge gas refinery included 6 train (production lines) utility, reception facility.

cathodic protection, lighting, earthing, lightning, VSD panels and motors.

coordination with commissioning group and operation team, and also preservation maintenance.

support vendors specialist on site.

2003.09.01 - 2007.03.01 Eni Italy (Agip) electrical supervisor Oil

construction and commissioning supervisor,

Pre-commissioning of electrical status index of subsystems

Visual inspection of equipment ( motors , cables, transformers,...)

Compliance with Project specs , safety rules, codes,

Quality of installation, Static Tests of equipment

« Cold testing » : calibration of instruments, machinery alignement ,(De-energised tests), static test

enter the result in ICAPS software, punch list preparation, up to RFC (Ready for commissioning)

commissioning

Electrical motors uncoupled runs , electrical breakers operation

Running-in and on-line tests of plant utilities, and main process equipment in closed loop (wherever applicable), Dynamic test

up to RFCU(ready for start-up

the plan strategy such as OPERCOM (TOTAL FINA ELF strategy)

control as subsystem and system status index, of everyone of

performance test and coordination with method and maintenance group for preservation maintenance

and in operation during, WDN (warranty defected notification)

2002.01.01 - 2003.08.01 Poolad consultant engineers co E&I supervisor Shipping

The shipping Port in MAHSHAHR, include:

ship unloaded, stacker reclaimed & train loading include,

more than 6 km belt conveyer

Electrical and instrument & control

equipment in BIKOT project

Construction & commissioning of all electrical equipment & instrument devices.

Project analyze and control the progress

1998.09.01 - 2002.01.01 MOSHANIR(electrical engineers consultant) Projects coordinator and supervisor Energy

Electrical Construction & Commissioning Supervisor & Welding inspector , Project coordinator

consultant and supervision of EHV substation and power plant switchgear supervision of projects (KARKHE, KAROON3, MASJED SOLEYMAN, CHOGHADAK, DIVANDAREH, BOOSHEHRE2) & 400KV/230KV/132KV/66KV/20KV Substations equipment disconnected switch, circuit breaker, CT, PT, REACTOR, 400/230/132/60/20kv trans., protection relays (CBF, distance, directional?) in control panels.

supervision of power station basic design & construction, commissioning

aluminum bas-bar welding inspector

provide as-built drawings

control contractors invoice

Prepare learning course for construction and Commissioning supervisor.

1995.04.01 - 1998.08.01 Hard metal project head of maintenance Production

Install & startup machines (spark, wire cut, chamfer, sintering, spray dryer, CVD, PVD?). Main factors: Japan TOOSHIBA TANGOLO

prepare maintenance planning

prepare procedure planning

define the critical point in procedure train

1994.01.01 - 1995.03.01 NIPC(national Iranian Petroleum Co.) electrical supervisor Oil

electrical supervision, BUTTACOLOR & ALACOLOR site

plant producer plant provide call of tender documents control contractor

invoice

Design power distribution in construction during

lighting design(material storage, street lighting)

Key competence

I am good familiar to OPERCOM strategy actually in last 10 years I work on it directly in five gas and oil project.

good familiar in system approach,

ICAPS software operation and database preparation

CMMS (computerization maintenance management system) behalf ICAPS by MAINTA software, and also IFS software

Electrical superintendent,

Switchgears relay protection, transformer, electro motors, PDMS, PDS, relay coordination, cathodic protection, lighting, lightening, all check and test as checklist and test procedure

Commissioning engineer

Method and maintenance planer

Construction manager

Management of document preparation of Pre-com. and commissioning managing

CMMS plan procedure and database preparation

Everything above for onshore and offshore facility

And maintenance, preparation database for CMMS plan as critical assessment, PPM, scheduling tag (relation equipment in a same package or same duty), Shutdown type Shutdown constraints, Isolatable tag and isolation type, reliability.

Other experience, positions of trust, interests etc

Ability to work with planning software packages

Experienced in preparing reports such as weekly report & monthly report

Experience in Preparing work breakdown structure (WBS) and coding the project

Preparing of Project Invoices

Good teamwork motivation and time management ability

Ability in define interface point to point between disciplines and contractors and areas.

Ability for manage and lead disciplines in project.

Language

Persian (Farsi)

English

Turkish

Arabic

Preferences for future positions

Electrical supervisor

commissioning engineer

method and maintenance planer

Pre-commissioning and commissioning data preparation

Job category Contract

Personnel responsibility Yes

Result responsibility Yes

Ready to relocate Yes

Term of notice in current Less than 1 month



Contact this candidate