MANOJ KUMAR MALLICK **********.*******@*****.***
Mob No.: +971-********* begin_of_the_skype_highlighting +971-********* end_of_the_skype_highlighting
OBJECTIVE:
To obtain a challenging position in telecommunication field in a progressive organization where ample opportunities are available to utilize my potential to an optimum level.
WORK PROFILE:
More than 5 years of experience in TELECOM Industry.
Currently working as a RF 3G Optimization(EITC, du project) with IGTL Contracting Co. LLC,
UAE. from 28th Jan. 2009 to till date.
PROJECT DETAILS:
PROJECT: 1
Project name : DU-Nokia 3G optimization(Abu Dhabi region,UAE).
Operator : du, UAE
Vendor : Huawei
Company : IGTL Contracting Co. LLC
Duration : 28th January 2009 to till date
Activities Performed:
Initial/Post tuning for the roll out of the WCDMA network.
Defining nominal neighbor list 3G-3G and 3G-2G for the whole market
Defining drive routes for each clusters.
Carrying out drive test team for du in Southern Emirates region (Abu Dhabi
and Al Ain).
Doing Post Processing on Actix based on Coverage_RSCP, Quality_Ec/Io,
Pilot pollution, Missing
neighbors, Soft Handovers and IRAT Handovers using KPI reports and
drive test data and looking the health and alarm of sites.
Check over-spillage for International Roaming for UAE and Oman.
Monitor Statistics & Parameters, Locate the poor performing cells
and provide the solution to improve the network performance.
To check the KPI’s & meet accordingly by Optimization.
Rectify the Customer Problems generally low throughput issue.
Good knowlwdge about the events as 1A 1B 1C 2A 2B 4A 4B etc
Analyzing 3G-Scanner logs for Pilot Pollution & missing Neighbours.
PROJECT: 2
Project name : NOKIA Project, HARYANA.
Customer : Nokia Siemens Networks, Haryana
Company : SHIVAM INFOCOM PVT LTD.
Project Size : Turn Key Project
Duration : 11th October 2006 to 17th January 2009
Tools Used : Planning Tool :-Frequency Planning tool(Nokia),MapInfo 8.0,9.0
Testing Tool:-Tems 4.1, Tems 6.0, Tems 8.03,
Activities Performed:
Carrying out drive test for IDEA.
Drive test and walk Test includes for 2G network.
Carrying out drive test for 2G Clusters, Highway drives, major road.
Performing 2G Drive & Analyzing drive logs, GPRS Drive, Cluster Drive,
RAC Change, BSC Update, Software Updating, Analysis of 2G Drive Logs.
Attending customer complaints for Call Drops, Coverage Issues, etc.
Optimization of Antenna height & Tilt on the basis of OMCR reports &
drive test.
Daily Network Health Monitoring and accordingly taking action on key
performance Indicator parameters (e.g. DCR, SD Completion, Rx Quality,
HO failures) to meet the Network benchmarks.
Optimizing the BSS parameters and fine tuning the parameter as per the
requirement.
Complete drive test analysis & report analysis.
Analysis of Layer 3 Messages for basic troubleshooting related to
Handovers, and other parameters verification.
Neighbour statistics analysis for neighbour trimming.
Optimizing of New and neighbouring sites after a new site in a Cluster.
Preparation of New Site Databases in monthly roll-out targets.
Frequency planning for New sites which includes BCCH, TCH.
Analysis of Drive Test Data and taking necessary corrective measures,
like neighbour list addition and Interference analysis.
Performing Pre and Post Drive test of new site using Tems 6.0 & 8.03.
Carrying out Optimization Drive for improvement of KPI’s and to solve
Customer Complaints.
Carrying out Physical optimization which includes suggesting Antenna
re-orientation, Antenna height change, change in tilt, Relocation of site,
new site proposal, etc.
PROJECT: 3
Project name : NOKIA Project, UP.
Customer : Nokia Siemens Networks, UP.
Company Name : SHARDA COMMUNICATION.
Duration : 7th November 2005 to 10th October 2006
Role : BSS Engineer
Activities Performed:
Installed microwave of NOKIA (7 GHz AND 15 GHz)
Installed NOKIA Ultra Site BTS and Flexi BTS.
TRX power measurement.
VSWR & Return losses measurement.
Alarm patching.
Setting 13 MHz frequency by frequency counter.
2G Ultra and Flexi BTS
PDH Microwave Link
NEC Link (SDH,PDH)
Flexi Hopper Commissioning
FIU Commissioning etc
Only GSM Technology.
Academic profile:
EXAMINATION BOARD\UNIVERSITY YEAR AGGREGATE
B.E.(Electronics and Communication)
B.P.U.T TECHNICAL UNIVERSITY,ORISSA
2001-2005
66%
CLASS XII COUNCIL OF HIGHER SECONDARY EDUCATION, ORISSA
1997-1999
60%
CLASS X BOARD OF SECONDARY EDUCATION, ORISSA
1997
62%
TECHNICAL QUALIFICATIO:
Certified course in an industry level program on Hardware and Networking from CTTC, Bhubaneswar.
Completed course on Java, J2EE.
TRAINING INTERNSHIP:
Summer training at BSNL, Bhubaneswar on E10B Exchange in April 2005.
Project work on “Railway Signaling And its Control System using PROMISE Software”.
Winter training at NALCO,Damanjodi,Orissa in 2002
KEY SKILLS:
Hardware : Assembling, fault detection & rectification of Celeron/Pentium PC
Operating System : DOS, WINDOWS-98, 2000, XP, 7, NT.
Language/Packages : Java, JSP Servlet, Spring, iBATIS, XML, HTML, Oracle8i
Networking : TCP/IP, Networking, Sub-netting
PERSONAL DETAILS:
Date of Birth : 28th April 1981
Languages known : English, Hindi, Oriya.
Driving license : Having Indian Driving License Expiry on 2016.
Date :
Place: Middle East (UAE) (Manoj Kumar Mallick)