Post Job Free
Sign in

Engineer Quality Assurance

Location:
Macau
Salary:
USD6500
Posted:
August 29, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

Name : ROHAIZUL BIN CHE HUSIN @ ABD RAZAK

Contact No : +601*-*******

+601*-*******

Address : NO: 2011, SIMPANG 3 HJ KASIM,

BUKIT MARAK,

***** ****** ******, **** *****,

KELANTAN, MALAYSIA

Religion : Muslim

Race : Malay

Marital Status : Married

Date of Birth : 08.October,1974

Nationality : MALAYSIA

Email Address : ************@*****.***

****.********@*****.***

Position : STRUCTURAL DESIGNER

Professional : AUTOCAD R14, 2000, 2008LT,2010LT,2011CS

Associations Skill MICROSTATION 3.2, MICROSOFT WINDOW, MICROSOFT OFFICE.

PDMS DESIGN MODEL (3D), PDMS DRAFT (2D), Basic BOCAD MODEL

Knowledgeable of codes, standards and regulatory guidelines that apply

to the design disciplines.

Knowledgeable of the interface points between design disciplines.

Is able to use Microsoft Word, Excel, Access, and PowerPoint.

Structural design integrity of work scope and maintenance of standards.

Education / Certificate : SPM from Sek. Men. Putri. Saadong, Kelantan.

CERTIFICATE OF ENGLISH EXAMINATION from College Of Cormmance

AUTOCAD from Institute Cosmopoint, Kuala Lumpur. Malaysia

CERTIFICATE OF BUILDING CONSTRUCTION SAFETY AND HEALTH

from JKKP, wilayah persekutuan. Malaysia

CERTIFICATE OF MICROSTATION from Bently Institute, Kuala Lumpur.

SEQU OFFSHORE SAFETY TRAINING CERTIFICATE at MAS Airport.

M-BOSAT WITH REBREATHER (Malaysia Basic Offshore Safety

and Emergency Training) at TSTC. Kemaman, Terengganu. Malaysia

CERTIFICATE OF (PTW) PCSB PERMIT TO WORK by PETRONAS

CERTIFICATE OF NIOSH PETRONAS SAFETY PASSPORT by PETRONAS

SUMMARY OF EXPERIENCE

Over 17 years working experience in drafting engineering, Construction, Fabrication & Installation of

Offshore & onshore structure oil & gas industry. Which is involved in civil and steel structure dwg

DETAIL OF WORKIING EXPERIENCE

09/08/2007 – Present : NIZU ENTERPRISE.

SENIOR STRUCTURAL DESIGNER

17/02/2011 – Present Second to: Mustang Sime Darby Engineering Sdn. Bhd.

Projects involved:

SHELL *SKSWOOD BRUNEI WORK PACK PROJECT

HESS MALAYSIA *HESS BELUD SOUTH FEED DESIGN.

MURPHY *SERENDAH & PATRICIA DRY GAS PIPELINE

Scope of Work:

~ Works closely with discipline project engineers/designers and other discipline engineers in the delivery of project engineering/construction deliverables, quality control drawings and overall project support.

~ Develop designs and (new) drawings in electronic format (AutoCad)2D, PDMS DRAFT, PDMS 3D

~ Implement hand marked-up changes to drawings.

~ Provides quality assurance reviews and detailed checking support. Maintain and monitor drawing development progress. Meet project commitments and deliver to schedule. Identify & implement process improvement to reduce cycle time & cost.

~ Structural design integrity of work scope and maintenance of standards.

~ Prepare structural discipline man hour estimates to perform project tasks.

~ Offshore site survey with crew, measurement with referring dwg. and photo taking

~ Make sketches and discuss proposed design with platform superintendent

for comments and attach the site visit report.

~ Prepared design of framing dwg. and secondary dwg. accordance equipment layout dwg.

~ Prepared handrail, plating and grating dwg. accordance equipment layout dwg.

~ Design steel structural work.

~ Preparation of technical reports, specifications and material take-off from PDMS

~ Discussion with engineer for any changes of engineering module.

~ Do the transmittal AFC dwg. Submitted to department.

09/08/2007 – 30/11/10 Second to: MMC Oil & Gas Engineering Sdn. Bhd.

Projects involved:

FPSO *HEAT TRANSFER STUDY ON E-1750B

*STRAINER INSTALLATION EFFECT STUDY

KTSB *ENGINEERING DESIGN FOR STEEL STRUCTURE FOR FALL

ARRESTOR AND SAFETY RAILING AT TANK TRUCK (TTIULR)

& BREAK FLUID BAY2

PCSB *DESIGN FOR PROCESS UPGRADING AT ABU-A

*DCS UPGRADE AT TCOT

*PYROPHORIC MITIGATION AT RESAK-A PLATFORM

PETROFAC *BASIC ENG. STUDY ON GAS LLIFT COMPRESSION AT CENDOR.

Attach to: PETRONAS CARIGALI SDN.BHD.

Projects involved:

ANGSI-A *BOAT LANDING

*EXTENSTION PLATFORM

*UPGRADE SURAU

*STORE ROOM AREA

*CONDUCTOR GUARD SUPPORT AND DETAILS

*DESIGN WORKING PLATFORM FOR V1010

*DESIGN SERVICE PLATFORM FOR P6900

ABU-CLUSTER *FAB. CHEMICAL DRUM CONTAINER

SOTONG (SCPA) *HELIDECK UPGRADE FOR CRANE CLEAR VISUAL

RESAK OGT *SERVICE PLATFORM FOR WELDON PUMP

BEKOK-A *EXTEND PLATFORM FOR PIPING SERVICES

*DESIGN FENDERS BUMPERS TYERS @ BOAT LANDING

*DESIGN DECK EXTENSION AT MODULE 1

MALONG-A (MASA) *DESIGN INFILL DRILLING CONDUCTOR SUPPORT

OGT *KOCC PARKING SHED, WELDON PUMP PLATFORM

KEPONG-A (PM9) *RECTIFICATION OF BRUCKER FRAMING

FPSO (PCSB) *DESIGN SERVICE PLATFORM FOR SSV0001/2

*DESIGN PIPE SUPPORT AT TURRET AREA

PPTSB *PIPE SUPPORT AND LIGTHING POLE FAUNDATION.

*E140 HEAT EXCHANGER FOUNDATION DETAILS

Scope of Work:

~ Works closely with discipline project engineers/designers and other discipline engineers in the delivery of project engineering/construction deliverables, quality control drawings and overall project support.

~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Implement hand marked-up changes to drawings.

~ Provides quality assurance reviews and detailed checking support. Maintain and monitor drawing development progress. Meet project commitments and deliver to schedule. Identify & implement process improvement to reduce cycle time & cost.

~ Structural design integrity of work scope and maintenance of standards.

~ Prepare structural discipline man hour estimates to perform project tasks.

~ Manage structural engineering design and any design changes within budget and schedule.

~ Promote cost reduction and productivity enhancing initiatives.

~ Identify and review new technology development which could be applicable in providing more cost effective facilities.

~ Technical supervision of project designated structural designers and draftsmen in the Execution of their duties.

~ Offshore site survey with crew, measurement with referring dwg. and photo taking

~ Make sketches and discuss proposed design with platform superintendent

for comments and attach the site visit report.

~ Prepared design of framing dwg. and secondary dwg. accordance equipment layout dwg.

~ Prepared handrail, plating and grating dwg. accordance equipment layout dwg.

~ Design civil and steel structural work.

~ Preparation of technical reports, specifications and material take-off.

~ Preparation of Cost Estimates

~ Discussion with engineer for any changes of engineering module.

~ Do the transmittal AFC dwg. Submitted to department.

6/2/2004 – 30/07/2007 : AKER KVAERNER ENGINEERING S.E.A. SDN. BHD.

(Formerly known as Kvaerner Petrominco Engineering Sdn. Bhd.)

STRUCTURAL DESIGNER

Projects involved:

F6 –A (SSB SHELL)

BCPA2 VASAI (ONGC INDIA)

Scope of Work:

~ Works closely with discipline project engineers/designers and other discipline engineers in the delivery of project engineering/construction deliverables, quality control drawings and overall project support.

~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Implement hand marked-up changes to drawings.

~ Provides quality assurance reviews and detailed checking support. Maintain and monitor drawing development progress. Meet project commitments and deliver to schedule. Identify & implement process improvement to reduce cycle time & cost.

~ Structural design integrity of work scope and maintenance of standards.

~ Prepare structural discipline man hour estimates to perform project tasks.

~ Manage structural engineering design and any design changes within budget and schedule.

~ Prepared design of framing dwg. and secondary dwg.

accordance equipment layout dwg.

~ Prepared handrail, plating and grating dwg. accordance

equipment layout and architectural dwg.

~ Responsible to design of bridge support dwg.

~ Remark progress of dwg accordance by schedule

~ Offshore site checking with referring dwg

~ Discussion with engineer for any changes of engineering part

~ Design stairways for MSF and Building Module together with standard detail dwg.

~ Make it design for handrails standard dwg

1/2/2001 – 31/1/2004 : UNIMATSU SDN. BHD.

SNR. STRUCTURAL DRAUGTHMAN

Second to: Aker Kvearner Engineering S.E.A.

Technip Geoproduction Sdn. Bhd.

Projects involved:

BUNGA ORKID (TALISMAN)

TURIMANISTAN, KIKEH.(PETRONAS CARIGALI SDN. BHD.)

YOHO (SAIPEM SDN. BHD.)

GUNTUNG-A & D,(ESSO)

TAPIS-A (ESSO)

RESAK, LAWANG-A, LARUT (ESSO)

KR2 (TOYO)

ANGSI, ANPG-A, ANDR-A, ANDP-B, MLNG 3 (PETRONAS CARIGALI)

Scope of Work:

~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Sketches and design steel structural dwg.

~ Prepared design of framing dwg. and secondary dwg.

accordance equipment layout dwg.

~ Prepared handrail, plating and grating dwg. accordance

equipment layout and architectural dwg.

~ Remark progress of dwg accordance by schedule

~ Offshore site checking with referring dwg

~ Discussion with engineer for any changes of engineering part

3/5/1998 – 31/1/2001 : ZEECOMP CONSULTANT SDN. BHD.

SNR. STRUCTURAL DRAUGTHMAN

Second to: TL Offshore Engineering Sdn. Bhd.

Projects involved:

MAXUS SOUTHEAST SUMATERA, INDONESIA.

WIDURI GENERATION PLATFORM, CUTTA.

MANNAI MARINE CO. LTD. MUNA DECK (CUTTA)

PELANGI ALPHA, PIPELAY ENCHANCEMENT, CUTTA.

RUBY-A JACKET & DECK (PETRONAS CARIGALI)

MANLONG DECK, SOTONG TOPSIDE (PETRONAS CARIGALI)

Scope of Work: ~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Sketches and design steel structural dwg.

~ Prepared design of framing dwg. and secondary dwg.

accordance equipment layout dwg.

~ Prepared handrail, plating and grating dwg. accordance

equipment layout and architectural dwg.

~ Remark progress of dwg accordance by schedule

~ Offshore site checking with referring dwg

~ Discussion with engineer for any clutch of engineering part

~ Design for sea-fastening dwg. and Bridge rotation and detail dwg.

1/8/1995 – 30/4/1998 : TENAGA NAZAR SDN. BHD.

STRUCTURAL DRAUGTHMAN

Second to: Promet Fabrication Sdn. Bhd.

Projects involved:

COPOLYMER PLANT FOR EASTMAN CHEMICAL (M)

(POSTER WHELER PTE. LTD – KUANTAN, MALAYSIA.

MASA DEVELOPMENT PROJECT – `STJT-A’

SOTONG TOPSIDE (PETRONAS CARIGALI)

Scope of Work: ~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Prepared framing dwg. and secondary dwg.

accordance equipment layout dwg. mark-up by designer.

~ Prepared handrail, plating and grating dwg. accordance

equipment layout and architectural dwg.

~ Site meeting with client and second party

~ Remark progress of dwg accordance by schedule

~ Onshore site checking as per as-built dwg

~ Create sea-fastening dwg. according sketches by designer and engineer

2/5/1993 – 2/7/1995 : KONE ELEVATOR SDN. BHD.

SNR. DRAUGTHMAN CUM PROJECT CORDINATOR.

Projects involved:

HOSPITAL KEMAMAN, TERENGGANU.

(JABATAN BOMBA, KELANTAN.

ANGKASAPURI, KUALA LUMPUR.

PERPUSTAKAAN UNIVERSITI MALAYA, KUALA LUMPUR.

Scope of Work:

~ Develop designs and (new) drawings in electronic format (AutoCad).

~ Prepare mechanical lifting dwg.

~ Site checking accordance engineering dwg.

~ Arranged general worker at site

~ Site meeting with client and second party

~ Remark of progress accordance by schedule

~ Arrange site checking with JKKP, Malaysia.

3/3/1992 – 31/4/1993 : GUABENA CONSTRUCTION SDN. BHD.

SITE SUPERVISOR

Projects involved:

SRI SENTOSA CONDOMINIUM, KUALA LUMPUR.

Scope of Work:

~ Site checking accordance engineering dwg.

~ Check the verticalbillity of building

~ Arranged general worker at site

~ Site meeting with client and second party

~ Remark of progress accordance by schedule



Contact this candidate