SHRUTI DESHPANDE
**** ****** *****, ******, ** **205 682-***-**** *****************@*****.***
CAREER OBJECTIVE
Seeking a rewarding position in which my knowledge, skills and experience in mechanical engineering can be utilized to the benefit of the organization.
EDUCATION
Masters of Science in Mechanical Engineering December 2010
University of Texas, Arlington, TX GPA: 3.9
Bachelors of Engineering in Production Engineering May 2005
KKW College of Engineering, Pune University, India GPA: 3.8
Graduate Courses: Structural Aspects of Design, Finite Element Methods, Advanced Finite Element Methods, Continuum Mechanics, Gas-dynamics, Control System Components, Engineering analysis I & II.
CERTIFICATION
Engineer in Training (EIT) April 2010
Texas Board of Professional Engineers
ACADEMIC PROJECTS
Graduate Thesis
Topic: Elastic buckling and inelastic post buckling analysis of structural components. This finite element analysis is performed on shell components and truss structures.
Created models of shell components and Truss members using Pro/Engineer Wildfire 4 and ANSYS
Performed Static Structural Analysis in ANSYS for all structural members to analyze the buckling and post buckling behavior.
Developed test plans, facilitated tests and created test reports for shell components.
Undergraduate
Presented paper on ‘Modeling, Simulation and Optimization of Fixture Design’ at MIT, Aurangabad, India
Presented paper on ‘Lasers in Metallurgy’ at Government College, Pune, India
Presented seminar on Design of Experiments (DOE)
SKILLS
Software: Microsoft Office, ANSYS, PRO-Engineer Wildfire 4.0, MATLAB, Q- DAS (statistics package like Minitab), AutoCAD, SAP R3 & R2 module, IQIS
PROFESSIONAL EXPERIENCE
BOSCH Ltd, India 2006 to 2008
Project Engineer - Quality
Product quality – High precision manufacturing of Diesel Injector Body and Injector Nozzles
Provide Quality Engineering support for manufacturing and related projects.
Troubleshoot manufacturing processes and equipment.
Supervise 10 Quality Auditors. Schedule and Plan audit workload.
Develop and implement process improvements.
Lead teams in identification of risk/hazards and failures associated with manufacturing processes and create process FMEA documentation.
Develop test plans, analyze data, and document results in technical reports (process validations, manufacturing qualifications, etc.)
Ensure compliance with product and industry requirements and champion Quality policies and principles throughout the company.
Data Collection and Analysis, familiar with laboratory instruments and various analysis tools.
Responsible for conducting PPAP and ISIR for nozzles.
Perform 5S audits.
Liaison Engineer - New Product Development
Interface with design, manufacturing, regulatory, material testing and other engineering groups in new product introduction.
Outline certification test plans and oversee dimensional , functional and material tests.
Zero Mileage Customer Complaints – Investigation and analysis
Central contact for Local and export customer issues.
Analysis using 8D methodology and IQIS (Integrated Quality Information System).
Initiate and follow-up corrective actions.
Evaluate defect ppm.
Machine and process capability evaluation using QDAS.
Management of quality control circles in the organization using tools such as 8D, Stop Sign, Paynter Chart, PDCA.
Plant Coordinator for Bosch Diesel Systems – Quality Management for defect statistics and PDCA cycle (Plan Do Check Act) and IQIS.
Working knowledge of FMEA, GD&T, DVP&R and TS16949.
Achievements
Improved first pass yield of Hydro Erosion operation through reduction of flow rejection from 3.2% to 0.56%.
Reduced consumption of abrasive Tetrabor F-1000 by 15%.
0-km Defect ppm reduction from 49 ppm in 2006 to 16 ppm in 2007
ASEA BROWN BOVERIES (ABB), India 2004 to 2005
Intern – Design Engineer
Completed multidisciplinary training;
Designed an Automated Fixture for assembly using AutoCAD.
RELAVENT TRAINING
Implementing Statistical Process Control on internal processes.
Six Sigma beginners training.
Trained on SAP for Customer Complaint Handling (IQIS-Integrated Quality Information System and BOSCH Warranty Systems), Bangalore
8D procedure for handling customer complaints
HONORS
University of Texas Arlington, Arlington, TX
College of Engineering
Graduate Teaching Assistant Fall 2010
CO-CURRICULAR ACTIVITIES
Tau Beta Pi, SWE member
BOSCH Ltd, event organizer (i.e., Nasik Run)
Indian Students Technical Association, Production Engineering Student Association, BOSCH Ltd committee