DEVENDRA CHANDRANT GANDHI

plcd1c@r.postjobfree.com

+919********* / +912*********/ +919*********

SEEKING FOR THE POST OF SR.PIPEING DESIGNER

Professional Qualification:

• Mechanical Draftsmen from India, 1988.

• Total experience: 24 Years

• Nationality: Indian

• Age: 49 Years, Sex: Male

Summary of Experience:

• Industries: Oil and Gas

• Total of 24 years in Piping Design experience with a considerable and vast knowledge in Offshore and On shore Pipe Line Oil & Gas field using Auto CAD.

• At present I am working in Mott MacDonald, Muscat, Oman as a Senior Piping/Pipeline Designer. For PDO-ODC projects.

• Specialized and Highly competent & well versed with Design, drafting and checking Piping/Pipeline General arrangements, Isometrics, Pipe supports, Valve schedules &Tie-in schedules for various offshore platforms, onshore Well Hook-Ups and Petrochemical plants in line with P&ID’s and PEFD’s

• Self-confident to work independently taking the responsibility of the design and the project and to lead a Piping team of Designers & D’man.

• Technical Engineering support for the yard, during the Piping fabrication and installation.

• Decision making and allocation the job/work for the piping personnel

• With a good communication skills in English, coordinating and Co-operating with other Engg. Discipline groups such as Mechanical, E&I and Structural.

• Worked with Multinationals and has very sound communicating skills

Highly competent in the production of Pipeline Drawings, Riser Guide clamps, Conductor guide clamps, Tie-in spool & Close-out spool Isometrics for various offshore platforms.

Software Experience:

• Intools

• AutoCAD 2010

• PDMS/PDS/Microstation/ Bently Plant Space training complited

Detail Professional Experience:

1) At present working for Mott MacDonald Company, Muscat, Oman for there Piping/pipeline Projects of OXY at Mukhaizna Site.

a) Conduct necessary fieldwork inclusive of walk downs of current systems, locate tie-ins and measuring.

b) Perform with civil or structural along with stress departments to assure suitable flexibility and assist piping systems.

c) Prepare piping design sketches as required by drafting personnel.

d) Check piping drawings developed by drafting personnel.

e) Ensure performance of staff members is in compliance with established project standards.

f) Check piping design drawing of vendor shop.

g) Complete isometric drawings and piping layout as needed.

h) Ensure to complete pipe component and run detailed drawings as necessary.

i) Review project parameters related to piping requirements.

j) Develop preliminary Bills of Materials with respect to piping design.

k) Administer technically to outsource function as required.

l) Interpret and administer various Pipe Material and options.

m) Participate project meetings plus provide project status.

n) Prepare the Engineering Deliverables and follow-up. Conduct the weekly technical discussion with Engineering and finalise the Deliverables.

o) Prepare and manage schedule for piping design projects.

2) DRAGON OFFSHORE INDUSTRIES LLC. Sharjah, UAE. (Rigs, Oil & Gas offshore platforms)

FROM 19th APRIL 2009 TO 29th March 2011 AS A SR. PIPING DESIGNER

A: Jack-Up Rigs and Offshore Plate Forms

• Prepare and perform site survey including photos and measurements or to ensure that designs are good for implementation

• Propose concepts application to the requested modification and define the most appropriate one.

• Coordination with engineers in charge or of other discipline.

• Prepares detailed design of piping in accordance with standards, codes and company specifications.

• Propose Fabrication and installation method.

• Ensure that produced drawings designs are safe, easy to built and install and in accordance with company and industries specification.

o Elaborate MTO based on produced piping drawings.

o Checks that Materials used on design meet company specification.

o Modification of existing drawings or establishment of new one.

o Ensure Technical quality of all documents produced.

o Manage updating and maintenance of Technical documents electronic data base.

2. Senior Piping Designer offshore projects for Ramboll Oil & Gas and deputed to Mearsk Oil Qatar for there Al Shaheen oil field from Dec. 2006 to |Dec. 2008:

• Understand the Scope of work clearly and prepare the schedule and planning for the project.

• Going for Offshore Platform site survey.

• Detail Design Engineering of Oil production, Water Injection, Gas injection & Gas blow down flow line Hook-ups.

• Prepare Piping General Arrangements, Isometrics, Pipe supports details.

• Prepare Tie-In Schedules and Bill of Materials.

• Checking and submitting the piping & pipe support drawings for the Engineer’s approvals.

• Co-ordinate with Engineering Contractor and Client to get the approval for the Drawings, Specs, Datasheets, Procedure etc.,

• Prepare the Engineering Deliverables and follow-up. Conduct the weekly technical discussion with Engineering and finalise the Deliverables.

• Co-ordinate with Engineering Team to issue the approved drawings for the Construction.

• Attend the Site Inspection with the Engineering team.

• Coordinating with the construction team to achieve the goal as per the Schedule.

• Recruited the other key personals for the Projects.

• Involve in the Testing and Commissioning of the Piping systems.

• Make a good relationship with the Clients and Contractors to achieve the Goal as per the Schedule

3) LAMPRELL ENRGY LTD. SHARJAH, UAE. (Rig & Oil Platform)

From SEPT. 2004 TO NOV.2006 WORKING AS A PIPING DESIGNER IN

LAMPRELL ENERGY LTD (SHARJAH, UAE)

A United Kingdom based engineering company specialized in designing & construction of offshore modules & Offshore rigs maintenance Worked for EPC projects in detail engineering such as:

1) NOBLE, EXPRO

2) ENSCO 95, 96, 97, 54, 88, 94.

3) GULF – 3

4) ATLAS

5) JUNANA

6) SANTAFI

7) CHARLAS COPLAND

Worked in various system:

A. Prepared Details piping fabrication drawings including all the existing information’s for air compressor area, generator area.

B. Zero Pollution System, Well Test Burner Boom Piping, Deluge piping, High Pressure Mud piping.

C. Choke and Killed Manifold piping.

D. Engine Lube oil & Dirty Oil, Compressed Air piping.

E. Mud pump Piping, Raw water Piping/

F. Cantilever Service Lines piping.

G. Emergency Generator piping, Bulk Air compressor Piping, Diesel Tank Piping.

H. Bilge Piping, Feeling Lines piping, Oily water separator system.

I. Low pressure mud, surge tank, fillings line for all services & drill water Piping systems.

4) KVAERNER POWER GAS INDIA PVT.LTD. at Mumbai Office

FROM OCT 03 TO AUG 04 WORKING AS A SR. PIPING DESIGNER

For Project Thai Acralic project in Thailand

• Prepare Piping General Arrangements, Isometrics, Pipe supports details.

• Prepare Tie-In Schedules and Bill of Materials.

• Checking and submitting the piping & pipe support drawings for the Engineer’s approvals.

• Co-ordinate with Engineering Contractor and Client to get the approval for the Drawings, Specs, Datasheets, Procedure etc.,

• Co-ordinate with Engineering Team to issue the approved drawings for the Construction.

• Attend the Site Inspection with the Engineering team.

• Co-ordinating with the construction team to achieve the goal as per the Schedule.

• Involve in the Testing and Commissioning of the Piping systems.

• Make a good relationship with the Clients and Contractors to achieve the Goal as per the Schedule.

5) AUG 02 To SEP 03

CCIC – QATAR RLX & QAFCO

• Prepare Piping Isometrics, Fabrication Piping Spool, Pipe supports details.

• Prepare Tie-In Schedules and Bill of Materials.

• Checking & Revised for As Built Drawings.

6) ARUN KELKAR AND ASSOCIATES Jan 98 To June 02

From Jan !998 to June 2002 as a Piping Designer

A: Deputedv to Bharat Petroleum for refinery upgrading various piping systems

• Prepare and perform site survey including photos and measurements or to ensure that designs are good for implementation.

• Drafting/ Design and Revising existing drawings to up-date.

• Propose concepts application to the requested modification, Shut Down jobs and define the most appropriate one.

• Coordination with engineers in charge or of other discipline.

• Prepares detailed design of piping in accordance with standards, codes and Refinery’s specifications.

• Ensure that produced drawings designs are safe, easy to built and install and in accordance with company and industries specifications.

o Elaborate MTO based on produced piping drawings.

o Checks that Materials used on design meet company specification.

o Modification of existing drawings or establishment of new one.

o Ensure Technical quality of all documents produced.

o Manage updating and maintenance of Technical documents electronic data base.

7)Aug 95 To DeC.97

ARTSON ENGG.LTD.

• I was working as Squad Leader for a team of Designers and Draughtsman. The responsibilities includes attending the Engineering Meetings, Client Meeting, Optimization of piping layouts, design of pipe supports with respect to the applicable standards, guiding the persons, co-ordinating with other departments like E&I and Struc, Man-hour Estimation, Progress report preparation and making the Piping deliverables as per the Clients requirements.

- Handled three Projects:

1) MRPL & BASF – Mangalore.

2) UNILEVER CYELON LTD.- Srilanka.

3) HPCL REFINERY MUMBAI-FCCU REVAMPING PROJECT

8)AUG 88 TO JULY 95

MEECON ENGINEERING – Deputed to Bharat Petroleum Corp.Ltd.-Refinery.

General Arrangements Drawings, Piping Isometric, Equipment Layouts, P&ID,Materials take off, as Built, Vessel Details, Update and produce Engineering Drawings, Specifications, Codes, Standards. Actual Field Survey and job co-ordination for new and maintenance jobs.

PERSONAL DETAILS

DATE OF BIRTH : 20TH December 1962

FATHERS NAME : Mr. Chandrakant

PERMANENT ADDRESS : NEELYOG APRT. B1/404.

GAURISHANKAR WADI NO.2,

PANTA NAGAR, GHATKOPER,

MUMBAI-400 075.

TEL: 009*-**-****-** 71

Mobil: 009***********

PASSPORT NO. : Z 2031151

Date of Issue –22/12/2009

Place of Issue – Dubai

Date of Expiry- 21/12/2019

LANGUAGES KNOWN : English, Hindi, Marathi,

MARITAL STATUS : Married

EDUCATIONAL : Passed H.S.C. Exam. In March 1985

QUALIFICATION

TECHNICAL EDUCATION : Passed Mechanical & Piping draughtsman I.T.E.I

In May 1988.

COMPUTER LITRECY : Auto-cad Release-2000

Auto-cad Release -2008

Auto-cad Release -2012

Knowledge in Taliso-CCIC Software for Piping

PDS, Micro station / Plant space Training completed

SAFETY COURSES : BASIC FIRE FIGHTING

H.U.E.T. & SEA SURVIVAL

H2S AWAARENESS

Devendra C. Gandhi