Post Job Free
Sign in

Project Manager Engineer

Location:
Mesa, AZ, 85213
Salary:
85000.00
Posted:
March 26, 2012

Contact this candidate

Resume:

Allen J. Anderson

Cell: 602-***-****

Email: **************@***.***

LinkedIn: http://www.linkedin.com/pub/allen-anderson/20/a89/861

CONSTRUCTION SUPERINTENDENT / PROJECT MANAGER

18+ Years of Commercial Construction Industry Leadership

Contribute 100%; dedicated to quality workmanship and high performance results.

Highly Accomplished, Multi-talented Superintendent / Project Manager with excellent project management expertise. A leader in streamlining operations resulting in significant cost savings, increased productivity, and gains in profitability for the company. Willing to relocate.

Knowledge of general construction means/methods, codes, MAG requirements, and standards

Construction CPM scheduling and updating

Complete site construction supervision including managing multiple crews, subcontractors and vendors

Hands on experience in heavy structural concrete, yard piping, surveying/layout, grading, paving and all underground utilities

Demonstrated ability to establish and maintain relationships with established field teams, subcontractors and owners

Excellent ability to achieve project completion within schedule and budget constraints safely

Selected Career Achievements

> $525,000 locker room renovation. South Mountain Community College 2011

> $700,000 dining hall expansion, ground-up occupied 2-story addition, AZ Veterans Dining Hall, 2010

> $1.5 million, 18,000 sq. ft. ground-up warehouse addition, Wrico Stamp & Griffith Bay Building, 2008-2009

> $1.75 million, 15 acre sports complex, Desert Broom Sports Park, 2007-2008

> $2.75 million demolition of temporary building, new CMU building, Patterson Elementary School, 2006-2007

> $3.5 million, phased renovation of occupied building, City of Mesa Municipal Renovation, 2005-2006

PROFESSIONAL EXPERIENCE

JOKAKE CONSTRUCTION – Phoenix, AZ, May 2011 to November 2011

Project Manager / Project Superintendent

Job Order Contract: Estimate, Buyout, Manage, and coordinate subcontractors on JOC Projects.

Work with Owner’s to develop a scope of work for JOC projects. Create project schedules; procure bids from Subcontractors, compile estimate through submissions to Owner. Create Subcontractor contracts, coordinate Subcontractors, and manage job sites through completion.

SDB, INC., Tempe, AZ, September 2005 to October 2010

Project Superintendent/Project Manager

Superintendent on CM@Risk park project with City of Phoenix. Managed and coordinated all site construction operations. Assisted with all preconstruction design drawing reviews and provided constructability review and input. Managed all city and regulatory inspections and maintained necessary permit compliance. Developed and maintained project schedule on a weekly basis and coordinated weekly progress meetings with owner, engineer and consulting architect. Updated project record drawings daily to reflect work completed in the field, along with preparing and submitting all record documents at project completion.

Resumé of Allen J. Anderson Page 2

SUNDT CONSTRUCTION, Tempe, AZ, September 1993 to October 2005

Sr. Project Engineer

Construction of new office buildings, retail buildings, and schools. Completed all project organization and tracking tasks including procurement, subcontractor and supplier tracking. Maintained field documentation and created daily reports for project manager. Updated project record drawings daily to reflect work completed in the field, along with preparing and submitting all record documents at project completion. Trained in CPM project scheduling and maintained construction schedules for various projects. Provided project managers with comprehensive resource loaded

Schedules and reports.

SS STEEL, Lakeside, CA, June 1990 to September 1993

Estimator / Project Manager

Estimated structural and miscellaneous steel, procured materials, and managed projects through completion.

MILITARY EXPERIENCE

United States Army – 1981 – 1987

Military Police Corp - K-9 Corp - Attack Certified, Nacardic Certified

EDUCATION AND CERTIFICATIONS

Dale Carnegie School of Communication- 2000

Project Management- University of Phoenix- Ongoing

OSHA 30 Hour, confined space entry, forklift operator, competent excavation, fall protection

CPR Certified

Maricopa County Air Quality Department Training

REFFERENCES

Dave Gornik Mesa, Az. 480-***-**** *******@***.***

Joe McGhee Phoenix, Az. 602-***-**** ***.******@******.***

Ed Riccio Tempe, Az. 480-***-**** **.******@***.****

Doyle Kahabka Tempe, Az. 480-***-**** *****@***.***

Nick Crisci Phoenix, Az. 602-***-**** ****.******@**************.***

Fred Freidl Phoenix, Az. 602-***-**** ****.******@*****.***

David Bannenburg Phoeinx, AZ 602-***-**** *****.**********@*******.********.***

Brian Randash Idaho ********@*******.***

Resumé of Allen J. Anderson Page 3

PROJECT LIST SYNOPSIS

Project Name Description Client

Aquatic centers renovation Renovations of four aquatic centers City of Chandler

Litchfield Park Branch Library Tenant improvements, Interior TI Maricopa County Library District

Cemeterio Lindo Gate Entrance Decorative cemetery entrance City of Phoenix

Oregon Street Arcade Sidewalk Improvements Structural Steel covered walkway and sidewalks City of Chandler

South Mountain Community College Locker & Gym Renovation Modernize locker rooms, remodel corridors Maricopa Community College, SMCC

Palomino Elementary School – Noah Clinic Renovation Interior & Electrical, Plumbing & HVAC upgrades Scottsdale Health Care

Arizona VA Dining Hall Expansion Addition and Renovations State of Arizona

Griffith Bay Building New CMU Building Office Warehouse Wrico Corporation

Wrico Stamping Addition Addition and Renovation Wrico Corporation

Patterson Elementary School New Classroom Building, new addition, demolition and renovate six existing classroom buildings, gymnasium, kitchen and offices Gilbert School District

Desert Broom - Tatum and Cave Creek Park and supporting facilities & utilities City of Phoenix

Air Intake Shaft Remodel Precast panel addition to federal bldg. GSA

Municipal Building Remodel Interior & HVAC upgrades City of Mesa

Camelback office renovations Interior HVAC and electrical upgrades Lee & Associates

Gainey Ranch Town Center I & II Office and Retail Building Lee & Associates

Breckenridge Elementary School 68,000 SF Elementary School Summit School District

Summit High School 190,000 SF High School with gymnasium, pool, kitchen, classrooms Summit School District

Harvey’s Hotel & Casino 300,000 SF Hotel and Casino Harvey’s Casino

PROJECT DETAILS

Chandler Aquatic Centers – Jokake Construction - 2011/2011

-Reference (Dave Gornik 480-***-**** - Joe McGhee 602-***-****)

Estimator, Project Manager

Renovations of four aquatic locker rooms.

Litchfield Park Branch Library – Jokake Construction - 2011/2011

-Reference (Dave Gornik 480-***-**** - Joe McGhee 602-***-****)

Estimator, Project Manager

Tenant improvements, demolition of walls, carpet and new walls, carpet, paint, offices, trenching and boring of underground for fiber optics.

Cemeterio Lindo Gate Entrance – Jokake Construction - 2011/2011

-Reference (Dave Gornik 480-***-**** - Joe McGhee 602-***-****)

Estimator, Project Manager

Decretive gate entrance made of structural and ornamental steel.

Oregon Street Arcade Sidewalk Improvements – Jokake Construction - 2011/2011

-Reference (Dave Gornik 480-***-**** - Joe McGhee 602-***-****)

Estimator, Project Manager, Superintendent

Structural steel covered sidewalk, new sidewalks, street lights and landscaping.

Resumé of Allen J. Anderson Page 4

South Mountain Community College Locker & Gym Renovations – Jokake Construction - 2011/2011

References (Dave Gornik 480-***-**** - Joe McGhee 602-***-**** – David Bannerburg 602-***-****)

Estimator, Project Manager, Superintendent

Demolition of existing locker rooms and corridors; new tile, fixtures, toilet partitions and accessories, paint, polished concrete floors and school logo.

Palomino Elementary School, Noah Clinic Renovation – SDB, Inc. 2010/2010

– Reference (Ed Riccio 480-***-****)

Project Superintendent / Project Manager

The Clinic was a 2,500 square foot renovation consisting of demolition of existing electrical, plumbing and interior wall and finishes; new electrical, plumbing, framing and finishes within an operational existing elementary school.

AZ Veterans Dining Hall Expansion – SDB, Inc. – 2009/2010

– Reference (VA Engineering - Randy Koelle 602-***-****), (Ed Riccio – 480-***-****)

Project Superintendent / Project Manager

Dining hall expansion was a $700,000 hard bid, ground up occupied 2-story addition with a very aggressive 6-month schedule completed on time and budget.

Wrico Stamp and Griffith Bay Building – SDB, Inc. – 2008 / 2009

– Reference (Nick Crisci 602-***-****)

Project Superintendent / Project Manager

Wrico Stamp was a negociated 1.5 million dollar 18,000 sq. ft. ground up concrete tilt-up occupied warehouse addition. Griffith Bay Building was a 1.8 million dollar 10,000 ground up CMU and steel warehouse office building. Projects were completed on time and budget.

Desert Broom Sports Park – SDB, Inc. Project Superintendent / Project Manager, – 2007 / 2008

– Reference (Brian Randash ( ) - ) – (Nick Crisci 602-***-****)

Park was a hard bid 1.75 million dollar 15 acre sports complex that consisted of illuminated spots fields, widening of city streets, parking lots and CMU buildings. Project completed under budget and on time.

Air Intake Shaft Addition – SDB, Inc., Project Superintendent, – 2007

– Reference (Nick Crisci 602-***-****)

Project was a hard bid 1.2 million dollar demolition and addition of a pre-cast concrete air shaft.

Patterson Elementary School – SDB, Inc. Project Superintendent, – 2006 / 2007

– Reference (Nick Crisci 602-***-****)

Project was a hard bid 2.75 million dollar demolition of existing temporary building, new CMU building, demolition and renovation of six existing buildings and three CMU additions to existing buildings. Project was a very aggressive schedule with 90 percent of the work being completed during the school’s summer recess. The project was brought in on time and schedule.

City of Mesa Municipal Renovation – SDB, Inc., Project Superintendent / Project Manager, – 2005 / 2006

– Reference (Nick Crisci – 602-***-****)

Project was a hard bid 3.5 million dollar phased renovation of an occupied building. Work consisted of abatement of asbestos, demolition of interior, mechanical, electrical and finishes and replacement of same. Project was completed on time and under budget.

Prolog – Sundt Construction, Sr. Project Engineer, – 2001 / 2005

– Reference (Dave Gornik 480-***-****)

Worked with a team of coworkers from the company’s different offices to integrate the Prolog software for the companies’ procedures, developed training sessions for the different aspects of the software, and trained all company personnel through out the country on the use of the Prolog software.

Resumé of Allen J. Anderson Page 5

Phoenix Corporate Office Park – Sundt Construction, Sr. Project Engineer, – 1999 / 2001

– Reference (Fred Freidl 602-***-****)

This project was an office park renovation of four 2-story structures and one 4-story structure; and the addition of two, 2-level parking structures constructed of cast in place concrete.

Cotton Center Corporate Center – Sundt Construction, Project Engineer, – 1998 / 1999

– Reference (Fred Freidl 602-***-****)

This project consisted of three buildings; two buildings were 58,000 square foot light commercial / office space built of structural steel, tilt up concrete panel walls and decorative CMU; and the third building was a 185,000 square foot two store office building built of structural steel and glass curtain wall.

Gainey Ranch Office II– Sundt Construction, Project Engineer, – 1998 / 1998

– Reference (Fred Freidl 602-***-****)

This project consisted of a two story underground case in place parking structure, and a three story ground up office building consisting of structural steel and glass curtain wall and steel framed exterior.

Scottsdale Chola Office Building – Sundt Construction, Project Engineer, – 1997 / 1998

– Reference (Fred Freidl 602-***-****)

The structure was a 135,000 square foot 2-story office building constructed of structural steel with glass curtain wall exterior.

Summit County High School – Sundt Construction, Project Engineer, – 1995 / 1997

The high school was a 168,000 square foot school constructed of structural steel with a CMU exterior. The building had a 2-story classroom wing, kitchen and cafeteria, gymnasium, indoor NCAA certified pool, auditorium with professional theatrical stage and sound systems, an illuminated football field and track, and softball fields and soccer field.

Breckenridge Elementary School – Sundt Construction, Project Engineer, – 1995 / 1996

The elementary school was a steel structure with glass and brick exterior. The building had framed classrooms, gymnasium and kitchen / cafeteria.

Harvey’s Hotel and Casino – Sundt Construction, Project Engineer, Safety and Scheduling Engineer, – 1993 / 1995

Casino was a 300,000 sq. ft. six-story cast in place concrete structure with several different exterior finishes. The building layout: 2-levels of under ground parking, 2-levels of casino flooring, 2-levels of hotel rooms.



Contact this candidate