PROFILE And QUALIFICATION:
Quality Control, Engineering, Quality Management System, Inspection, Certification and NDT in Oil & Gas, Marine, Power Plant and Petrochemical sector. Directly involve and responsible in the construction, fabrication and Installation of Mechanical equipment, Piping, structure and Welding fabrication of the project to make sure all areas complied with the Standards and quality required.
OBJECTIVE:
To obtain a responsible position and give contribution in a company, where my experiences, relationship, accomplishment and proficiency will allow me the opportunity for grows and improves.
EXPERIENCES AND EXPERTISE
INSPECTION, TESTING AND CERTIFICATION
Capable in Quality control of fabrication/construction (including mechanical, piping, structural, mechanical, painting/coating), installation, quality control/assurance of non-destructive test for oil & gas production, Floating Production Storage Offloading FPSO, off shore platform, pressure vessels, heat exchanger, boiler, pipeline, piping inspection, OCTG inspection, Wellhead & Christmas tree inspection.
MANAGEMENT SYSTEM
Development, review, implementation and auditing of:
- ISO 9001:2008, Quality management system latest edition
- OHSAS 18001:1999, Occupational health and safety management system
- Indonesia Industrial Safety and Health regulation Ministry of Manpower requirement No. Per 05/MEN/1996, Health and Safety management system (SMK3)
PROFESSIONAL SOCIETY MEMBER:
- Singapore Welding Society member No. SWS – F 2191
- Certification Body for Indonesia Inspection Company Association (BS-APITINDO) as Assessor
EDUCATIONAL AND PROFESSIONAL TRAINING & SEMINAR ATTENDED:
- 2009 CSWIP 3.1 Welding Inspector by TWI UK, Certificate of qualification No. 44702, Course certificate No. WIS5/BTM/09/04/106
- 2009 Quality Management System QMS – Upgrading ISO 9001:2008 by ISC – RABQSA Australia. Cert. No. QM-09237
- 2008 STOP ( Safety Training Observation Program) conducted by HSEQ Prosafe Production Services
- 2008 PTW Permit to Work training in FPSO installation by Prosafe Production Services Pte.ltd
- 2008 BOSIET including EBS, Fire fighting & Self rescue 5700 and HUET with EBS conducted by SMTC Global Singapore approved OPITO Cert. No. A59.SG.08.1017
- 2008 Travel Safely By Boat – 5605 OPITO approved Cert. No. A64.SG.08.1095
- 2008 Train to Trainer course by DTT Malaysia and DUJ Batam June 2008
- 2007 Improving Quality of Welding Based on International Standard (International Institute of welding – IIW Guidelines) by Germany Welding Institute Mannheim and University of Indonesia.
- 2006 Internal Audit Quality Management System ISO 9001 Training, Conducted by PT.GKS
- 2006 Internal Audit OHSAS 18001:1999 Occupational Health and Safety Management Systems conducted by PT.GKS
- 2006 CSWIP 3.4 RI Level II TWI Kuala Lumpur Certified as CSWIP CERT. NO. 26527
- 2005 Awareness ISO 9001: 2000, By Velosi International Sdn Bhd, Malaysia
- 2003 Expediting In house Training MODY INTER INDONESIA
- 2003 Welding Inspector Certification by Material Science, University of Indonesia, Ministry of Manpower and Directorate General of Oil and Gas certificate No 010/WI-RCMS-UI/IV/AL/2003
- 2003 Pakuan University Bogor-Indonesia major in Planology (Territorial and Urban Planning) Engineering
- 2002 Magnetic Particle Testing Re-certification SNTC-IA-2001 edition Certified as MT Level II (two) ASNT Inspector
- 1994Ultrasonic Theoretical and Practical Course for All Configurations SNTC-IA, Certified as UT Level II (two) All Configuration ASNT.
- 1993 Magnetic Practical Testing Training Course refer to SNTC-IA. Certified as MT Level II ASNT Inspector.
- 1993 Dye Penetrant Testing Training Course for Industrial Application refer to SNTC-IA, Certified as Dye Penetrant Level II ASNT Inspector
- 1992 NDT ASNT Level I UT/MT/PT SNTC-IA
- 1992 Graduated Bogor 1 Senior High School major in Biological science
WORK EXPERIENCES:
PROSAFE PRODUCTION SERVICES Pte. Ltd
International Business Park - SINGAPORE
August 2008 to Present
POSITION ; QA/QC Supervisor
Job description and responsibilities
Directly responsible to the Project Manager and Hook Up manager on Construction stage in all other quality and technical essential aspect to support the construction activities both offshore and onshore not limited of fabrication activities at vendor t Worksite
Prepare project quality budget and any cost matters affected by quality deficiencies or improvements.
Perform shop and site inspections of manufacturing / construction processes and field checks of field welding processes, inspection processes (including NDT and painting) and electrical / instrumentation checks / testing and provide detailed corrective and preventative actions.
Review and Check Specifications, Procedures, Code & ITP ( Inspection & Test Plan ) for Piping Fabrication, Structural, Mechanical equipment manufacturing and Erection
Develop necessary quality procedure , welding procedure and inspection procedure as require by project stage activities
Conduct internal and external audit and directly participate in the contractor evaluation and provide recommendations during the selection process, after contract awarded and during fabrication process.
Conduct vendor assessment and inspection to make sure both vendor and equipment which fabricated meet company requirement
Review and approve all Contractors Quality Plans and related documentation on behalf of The Company.
Monitoring Fabrication of Modules including Pressure Vessels (Separator, Glycol Contactor, Filter) and also Compressor and Structural Part at fabricator
Coordinate supervision and monitoring for all Contractor works both Offshore and Onshore to guarantee QA/QC for the services / works performed.
Performed welding procedure qualification test and welder qualification test
Monitoring material or Material Take Off (MTO) for installation both structural and piping.
Check actual, Review Drawings & Data Sheet (Piping & Instrument Drawing “P&ID”, Piping Plant, Isometric Drawing and Pipe Support Drawing)
Supervise and perform inspection, monitoring, verification, review NDT report include interpreting film result, witness test according technical specification, applicable standard / code and procedure / work instruction meet client requirements.
Conduct Line Check to ensure that all accessories and pipe Installed as per Isometric Drawing and issued punch list once found outstanding item.
Prepare and make sure The ITR prior commissioning are provide properly
Witnessed Hydrostatic Test as per Pressure Test on Test Package Block includes Flushing of piping after and before pressure test.
Witnessed Re-instatement to make sure correctness bolts, nuts and gaskets installed and its tightened and Closing Punch list once have been completed.
Directly involve in safety matter to make sure the personnel who are allocated to their specific areas work in accordance with the safe working / HSE procedure
PROJECT ASSIGNMENT
- As QA/QC Engineer / Site Engineer for Umuroa FPSO Piping and Mechanical Upgrade Project (August 2010-Present)
As per ASME B 31.3, ABS classification, AWS D1.1, Company and Client specification.
Tui Field Taranaki Basin – NEW ZEALAND.
- As QA/QC Supervisor Espoir Ivoirien FPSO Upgrade Project phase 1, Ph. 2 and Ph. 3.
As per ASME B 31.3, DNV classification, AWS D1.1, Company and Client specification.
IVORY COAST – WEST AFRICA.
PT. BUREAU VERITAS INDONESIA
Jakarta – Indonesia
June 2008 – August 2008
POSITION ; Mechanical and Piping Client Inspector Representative
PROJECT ASSIGNMENT
- As Client Site Representative on behalf TOTAL E&P Indonesie for Gas Fuel Package Tunu North Ph. 11and ENI Australia for Pressure Vessels Black Tip Project As per Australian Standard AS/NZS 1210
PT. DUA UTAMA JAYA
Batam – Indonesia
Nov. 2007 to June 2008
POSITION ; Senior Inspector ,Operation & Inspection coordinator, Welding Engineer
PROJECT ASSIGNMENT
- As Client Representative Inspector on behalf Prosafe Production Services Pte. Ltd for Espoir Ivoirien Project 183-V056, Module and Pressure Vessels (Separators, Glycol Contactor, Suction Scrubber and Piping) fabrication as per DNV classification, ASME VIII , ASME B 31.3 Process Piping and Client specification at Profab and Transalindo Batam.
- As Third Party Inspector MIGAS for WPQT and WQT Total Tunu Phase 11 & 12 Construction and fabrication of structural as per AWS D1.1, Total spec. GS STR 301, GS STR 201 and Migas regulation at Sembawang Marine Offshore Engineering, Batam
PT. GERBANG KRENINDO SAKTI
Jakarta – Indonesia
Dec. 2006 to Oct. 2007
POSITION : Senior Inspector Coordinator and Operation Manager
Official Duties:
• Report directly to Operation Manager for all operation, technical and quality matter in project
• Coordinate all inspectors and monitor all projects inspection activities and quality control.
• Maintaining all document control system in company.
• Coordinating all inspection activities being under taken in their areas.
• Ensuring that the personnel who are allocated to their specific areas work in accordance with the safe working / HSE procedure.
• Perform QA/QC inspection.
PROJECT ASSIGNMENT
- As TUV Rheinland Indonesia Inspector Representative and Technical Quality advisor for Schneider Kessel Germany of Waste Heat Recovery Boiler at Asahi Mas Chemical Plant as per EN 12952 – EN 12953 and Pressure Equipment Directive.
PT. JAVA VELOSI MANDIRI (Velosi Int’l Sdn Bhd)
Jakarta – Indonesia
March 2005 to November 2006
POSITION : Senior Inspector coordinator, Operation & Technical Manager
PROJECT ASSIGNMENT
- As Inspection Coordinator for BP Tangguh DCU 0065, Oil Country Tubular Goods, Wellhead Equipment and X-Mas Tree Drilling Equipment Project. As per API 5CT and API 6A
- As QC Client Representative / seconded Behalf Biothane Asia Pasific BV Netherland for BP Zhu Hai EGSB Settler fabrication include FRP Filter. As per AWS D1.1 & client spec.
- As QC Representative Coordinator / seconded behalf Hyundai Engineering for pressure Vessels Suban Phase 2 Conoco Phillips project and KOC for OCTG Hydrill Csg 22 7/8 R3.
- As Client Inspector Representative /seconded for Pressure Vessel inspection for KBR Escravos project.
- As QC Client Representative / seconded behalf Goro Nickel Australia for Fiber glass Reinforced Pipe Vinylester Piping Systems Project as per 15 LR App. B, ASTM D2583, D2584 and client specGCT01-000-8440-SP006
PED (Pressure Equipment Directive)
- As QC Client Representative behalf Biothane Asia Pasific BV Netherlands for EGSB Settler fabrication.
- As Client Inspector Representative for Pressure Vessel inspection for Agip KCO Kazakhstan, Petrofac JI 176 Kashagan Development project.
PT. MODY INTER INDONESIA (Moody international)
Jakarta – Indonesia
February 2005 to March 2005
POSITION : QA/QC Inspector
PROJECT ASSIGNMENT
- as Client inspector Representative/seconded for SHELL REFINERY GEELONG AUSTRALIA Ltd for Catalyst Cooler E 5311 A Fabrication, . As per Australian Standard AS/NZS 1210 Specification for Pressure Vessels, Client Spec. DEP.31.22.10.32 GEN. Vendor Jord’ International Australia
- as QA/QC inspector for Kodeco Energy Ltd. Gas Delivery Expansion Hook Up KE-5 CPP Central Process Compressor Madura offshore.
PT. CITRABUANA INDOLOKA - INTERTEK
Jakarta – Indonesia
July 2004 to December, 2004
POSITION : QC Inspector
PROJECT ASSIGNMENT
- as client inspector representative Rekayasa Persada Joint venture Rekayasa Industri – IKPT for Kujang Plant 1B Ammonia – Urea Bridges Strengthening Structural Project, Sekayu Bina Drilling for drilling rigs hoisting and equipment certification including air compressors and pressure.
PT. MODY INTER INDONESIA (Moody International)
Jakarta – Indonesia
January 2003 to June 2004
POSITION : QA/QC Inspector for several oil & Gas project
PROJECT ASSIGNMENT
- As client inspector representative/seconded for Shell Eastern Petroleum Pte. Ltd Singapore for Air Cooled Heat Exchanger HDS4 REVAMP PROJECT, J Ray Mc. Dermott for Total Peciko project BDF Platform, Chicago Bridge and Iron (CBI) Dubai – UAE for Nigeria LNG plus pipeline, Technip Coplexip c/o Technip Indonesia for Conoco Phillips BBSD Project, Spie Capag Lucas JV, Adelaide – Australia for Pressure vessels Horizontal gas filter Sea Gas Pipeline lorna Minerva – Adelaide Australia project, Kellogg Joint Venture, UK England for pipeline pipe support, PTFE slide plate and acoustic plate of Nigeria LNG plus, Egypt-Damietta segas project, Technip Coplexip Paris – France c/o Technip Indonesia for Conoco Phillips BBSD material receiving verification, PT. Mc Dermott Indonesia for various project at Jakarta Area Valve Inspection & Chatodic Protection Inspection.
PT. RIZKY ALDITA NURAGA
Bogor – Indonesia
March 1997 to 2002
POSITION ; QC Inspector / NDE Coordinator
PT. BUDIKARYA NASTITI
Jakarta – Indonesia
January 1996 to Dec. 1996
POSITION : NDT Level II Multidiscipline Inspector
PT. BIXINDO UTAMA
Surveyor and Inspection Services
October. 1992 to Dec. 1995
POSITION : NDT Level II Multi discipline Inspector
Personal contact references:
- Mr. Sundeep Chawla (Project Manager for Umuroa Upgrade Prosafe Production services)
Email: *******.******@*****************.*** Phone: +658*******
- Mr. Donald Maciver & Mr. William Thomson (HU Manager Prosafe Production Services) Email: ***************@**********.*** / ******.*******@*****************.*** Direct call: + 65 6302 0662
- Mr. Winston Reantaso (Exxon Mobil) Email : *******.*.********@**********.***. Phone: +658*******
- Mr. J. Pierre Gothier Maurin / Mr. Rifkiandi Darajatun (TOTAL EP) Email: **-**-***.****-**-**-**-****@*****.***. / *********.*********@*****.***.
- Mr. Sigit Guntarto (Bureau Veritas Indonesia) Email: *****.********@**.*************.***
- Mr. Didie Tedjosumirat (Indonesia Deputy Minister of trade and industry, Head of Indonesia inspection – certification association chamber) Email: *******@*********.***
- Mr. Norman Broadhurst (British Petroleum), Email : ******@***.**.***
- Mr. Igor Napitupulu (Santos Energy Pty) Email; ****.**********@******.***
+62-811*-****** / +62-818-********
- Mr. Irfan Irianto (CEO PT. Gerbang Krenindo Sakti) Email; *****@**-*****.***