Post Job Free

Resume

Sign in

Elevator Technician

Location:
United States
Posted:
June 25, 2011

Contact this candidate

Resume:

BEN A. MEJOS Email address :odi49z@r.postjobfree.com

**** **** ***********, ********* *****,

Batangas City, Mobile no :+967*********

Philippines 4200 Phil. Tel. no. :+634********

________________________________________

OBJECTIVE:

Seeking a position leading to a more successful career in Lift and Escalator technology.

________________________________________

EXPERIENCES:

December 2010 - Present Al-Sadi Trading Group

Mitsubishi Elevators ( MELSA)

Sana’a, Yemen

TECHNICAL MANAGER

• Responsible on all projects both installation and maintenance as well as marketing technical support.

• Study of every proposals technical specifications and approval of the same before submission to client and placing order to the principal.

• Responsible in maintenance schedules and technical related works.

• Supervise installers accordingly including implementation of quality and safety.

• Supervise and check every work done until testing and commissioning.

• Preparing all reports and documents for turnover.

• Responsible in developing technicians efficiency for proper maintenance as well as troubleshooting.

• Perform troubleshooting if necessary as well as testing and commissioning at any time needed.

• Attend meetings and prepares technical bids.

• Responsible in coordination of technical matters to the principal

________________________________________

September 2006 – Nov. 2010 Frabel Eng’g. Machinery & Equipment Inc.

( Edunburdgh Elevator & Escalator)

Philippines

FIELD OPERATION MANAGER

• Responsible on all projects both installation and maintenance as well as marketing.

• Supervise installers accordingly following budgetary chart of completion.

• Supervise and check every work done until testing and commissioning, assist foreign technician if needed defends on the urgency of the project.

• Preparing all reports and documents for turnover.

• Responsible in developing technicians efficiency for proper maintenance as well as schedules.

• Perform troubleshooting if necessary as well as testing and commissioning at any time needed.

• Attend and preparing bids on all projects required both pricing and technical bids.

________________________________________

November 2001 – January 2006 Al Makhalid Cont. Establishment

Riyadh, K.S.A.

LIFT TECHNICIAN/ SUPERVISOR

• Maintains Otis, Schindler, Thyssen, Haushann, Lift Commercial and Mitsubishi on various projects around the kingdom.

• Responsible in troubleshooting and analyzing of minor and major problems of elevators with or without drawing and do repair or parts replacement whenever necessary.

• Appointed Technical Supervisor for elevators in the service eng’g. Department.

• Preparing reports from evaluation and status of every units in sites.

• Preparing work orders of every technician for preventive maintenance, and schedule. As well as routinely visual checkups of every units and other corresponding components for any abnormal operation and condition.

• Perform other duties that may be assigned from time to time.

• Installs and fabricates first helipad elevator in Saudi Arabia thru Otis Riyadh.

________________________________________

October 1998 – October 2001 Santa Cruz Metal Crafts

Philippines

FABRICATOR

• Fabricates bushing, sleeves, paste plates and other spare parts that can be done thru fabrication that may assigned.

• Fabricate or assembling grills, gates and other metal works in related to welding thru arc machines and gas.

• Operates lathe machine, shaper, drill machine and hydraulic press if appointed to do so.

• Fabricate equipments and assemble from costumers design.

• Attending bench works when ever available.

________________________________________

September 1995 – September 1998 Kong Siah Engineering

PTE Ltd. ( Singapore)

INSTALLATION FOREMAN

/ INSTALLER

• Preparing jobsites for the installation.

• Preparing scaffold and templates as well as elevator shaft balancing.

• Preparing the scope of works for the starting of the installation in accordance of the budgetary bar chart.

• Lead manpower in the installation of Elevators and Escalators installation assigned in responsibility.

• Preparing productivity report and work accomplishment (i.e., Elevator and Escalators)

________________________________________

May 1993 – September 1995 Hyundai Elevator and Escalator

Services

Philippines

ELEVATOR TECH. /INSTALLER

• Assigned as standby technician on various projects.

• Assigned troubleshooter at any project at any time needed.

• Perform both electrical and mechanical installation to any project assigned.

• Performing testing and commissioning as well as adjustments on finished projects.

• Performing other duties assigned from time to time.

April 1992 – May 1993 Microlift Engineering

Philippines

ELEVATOR TECH. HANDY MAN

• Assist Elevator technician on troubleshooting, repair, and maintenance of various projects.

• Conduct Preventive Maintenance on both elevators and escalators of various brands.

• Support manpower for Installation of both elevators and escalators.

________________________________________

EDUCATION

1987 – 1991 Santa Cruz Academy

High School

1981 – 1987 Lipay South Central Elem. School

Elementary

________________________________________

TRAINING/ SEMINARS ATTENDED

Classified B+ in skills test

(Century Technology Services Inc. Manila Philippines

February 01, 2001

Fire and safety/ Loss Control Training

(Security Forces Hospital Program)

Riyadh KSA

April 24, 2005

________________________________________

BACKROUND SUMMARY

Born on the 19th of January 1975, Filipino, Single. A Thorough professional with a mature outlook and a balanced approach towards life. Has strong personality, efficient, diligent and trustworthy, has an outstanding communication skill both oral and written English in dealing with fellow associates.

________________________________________

CHARACTER REFERENCE

Eng’r. Ali Al Masoud

Electromechanical engineer

Security Forces Hospital Program

Riyadh KSA

Mr. L. G. Fernandez

Field Operation Manager

OTIS Riyadh KSA

Mr. Raja F. Rehman

Service Engineer

Al Makhalid Cont. Est.

Riyadh KSA

Mr. Gary Tan S. P.

Director

Kong Siah Engineering PTE Ltd.

Singapore

Mr. Mario Cariaso

Operation Manager

Hyundai Elevators Services

Philippines

Engr. Ayman Al Hamza

Sales Manager

Al-Sadi Trading Group (Mitsubishi Elevators)

Yemen



Contact this candidate