JOEL ESTRAVILA BICALAN
POSITION DESIRED : INSTRUMENT COMMISSIONING TECHNICIAN
E-MAIL ADDRESS : **********@*****.***
TEL: NO. : +639********* / +639*********
DATE OF BIRTH : JANUARY 20 1964
SEX : MALE
CITIZENSHIP : FILIPINO
HEIGHT : 165 cm
WEIGHT : 67 kgs
EDUCATIONAL ATTAINMENT
PRIMARY : DONA AURORA ELEM. SCHOOL (1971- 1977)
SECONDARY : BAGUIO PATRIOTIC HIGH SCHOOL (1978-1983)
COLLEGE : BAGUIO ELECTRONIC AND TECHNICAL
INSTITUTE (1985 – 1988)
COURSE : ELECTRICAL TECHNICIAN
TRAININGS AND SEMINARS
1. BASIC ‘PLC’ PROGRAMMABLE LOGIC CONTROLLER. Actual simulation of logic system with device and console at MERALCO FOUNDATION INCORPORATION ORTIGAS AVENUE PASIG CITY PHILIPPINES. Dated January to February 2005
2. CALIBRATION OF PROCESS INSTRUMENTATION. Actual calibration of all process instrumentation at MERALCO FOUNDATION INCORPORATION ORTIGAS AVENUE PASIG CITY PHILIPPINES. dated January to February 2005
3. INSTRUMENT TECHNICIAN ‘CLASS B+’ TRADE TEST. time limit examination tools/equipment knowledge’s actual testing of being instrument technician at EXECUTIVE TECHNICAL CONSULTANTS STA.ANA MANILA PHILIPPINES dated 13th of July 2005
Candidate Over-All Profile:
Entire experience involves in oil and gas, petrochemical plant, gas to liquid refinery, (LNG) liquefied natural gas plant, underground storage plant, power plant heavy industrial facilities. Giant yard for assembling and fabrication of platform, mining plant facilities
As an instrument technician my duties is to perform line checking of power and control cables, calibration trimming of all field instrument, checking signal from control control room through the field, loop checking used communicator and direct inject pressure through instrument device for final testing, simulation of all the field instrument from DCS. Stroking of valves such as control valve, motorized valve Close/open valve and manual valve
In such as additional jobs, trouble shooting, repairing of instrument device are the jobs involve in scope of work. Modification of control system and re-wiring in marshalling cabinet through control system also modify the existing equipment as good as new one.
Throughout my duties I was assigned in commissioning department which I contribute my knowledge’s in instrumentation and perform testing, test pack, pre-com, commissioning, final acceptance and warranty of electrical and instrumentation jobs
Note that my entire contracts done in my companies are Finish project/ end of contract. And I dedicated my time as a good employee
Controller and test equipments
* 375 /475 FIELDBUS FOUNDATION HART PROTOCOL SMART COMMUNICATOR
* 275 HART PROTOCOL SMART COMMUNICATOR (ROSEMOUNT)
* BRAIN TERMINAL 200 (BT 200), YOKOGAWA
* DPI 603 DRUCK CALIBRATOR
* RESISTANCE BOX Model #8000
* FLUKE 741B PROCESS CALIBRATOR (RTD)
* TK3-2E VIBRATION CALIBRATOR, Model # 14700-001, BENTLY NEVADA
* ALTEK 434 SIMULATOR (4~20 mA)
* DEADWEIGHT TESTER (Used for mechanical PI)
Duties and responsibilities
Pre-commissioning and commissioning
• To execute testing of all field instrument that are involve in the package during commissioning period
• Rectify all the problem of instrument to establish start up
• Line checking of control cables
• Pre-check and testing signal (digital output/digital input, analog output/analog input) from console through field
• Bench / Field calibration of all process instrument devices
• Perform loop test .checking data output. and simulation of all instrument from the field to DCS using different kinds of test equipment such as communicator
• Inject direct low/high pressure to instrument ( level ,flow ,pressure transmitter ) for functional testing
• Trouble shooting and repair instrument device for such any reason/problem
• Final testing, stroking of all valves to check the correct percentage on each output
• Cause and effect, sequence and interlock test
• Pre- commissioning and commissioning
• Final acceptance
• Warranty and preventive maintenance
Installation and construction
• Prepare of all necessary equipment to install
• Installation of cable tray, cable ladder and conduit
• Installation of newly device. Electrical and instrument equipment
• Mounting and installation of different kinds of safety device, security system and telecommunication system
• Cable pulling. Wiring of various electrical equipment including electronic device
• Termination of control and power cables
• Replace the old and existing pneumatic instrument/equipment to new electronic transmitter to upgrade the system
Work experience (recent to previous)
Date: August, 2011 to February 2012 Name of Company: Kentz Engineering & Constructor
Location: Ambatovy project, toamasina Madagascar
Position: instrument commissioning technician
Project involve: AMBATOVY project. Nickel and cobalt mining
Company profile: KENTZ engineering a main constructor in all industry such as oil & gas
Petrochemical, desalination facilities, heavy industry and mining plant facilities
Responsible on: perform pre-com, start up, commissioning and final acceptance
Knowledgeable on:
*experience to perform final inspection / RFI represent as a QA/QC inspector
*Having good knowledge of plant safety rules and regulation *Good knowledge about permit work system
*Capacity to do jobs alone by following safety rules and Regulation
* Literate in computer operation and able to operate console/ opening database
Date: April, 2010 to January 2011 Name of Company: Orion Project services Pte Ltd.
Location: 360 Orchard road int’l bldg SINGAPORE
Position: instrument commissioning technician
Project involve: CHEVRON Platong Gas ll McDermott project Batam Indonesia
Company profile: Mc Dermott A main contractor expertise in all type of
Platform from construction installation start up and commissioning
Responsible on: to insure the loop of each instrument are in proper signal
Knowledgeable on:
*Having good knowledge of plant safety rules and regulation *Good knowledge about permit work system
*Capacity to do jobs alone by following safety rules and Regulation
*Good experience and familiar in plant jobs
* Literate in computer operation and able to operate console/ opening database
Date: October, 2009 to March, 2010 Name of Company: SPIE oil & gas services
Location: Fujairah Qidffa. UAE
Position: instrument & control commissioning technician
Project involve: F2 Fujairah project. Multi effect desalination plant
With 12 units evaporator/ 8.5 million gallons per day output
Company profile: SIDEM Company. A main contractor expertise in all type of
Desalination plant from construction start up and commissioning
Responsible on: entire process instrument. Valves .control system and all devices that are involve in system
Knowledgeable on:
* Having good knowledge of plant safety rules
* Knowledge about permit receiver
* Experience and familiar in plant works in safety way
* Literate in computer operation and able to operate console/ opening database
Date: May, 2008 to December, 2008 Name of Company: kentz engineering & constructor
Location: Sakhalin Russia
Position: instrument commissioning technician
Project involve: Sakhalin energy phase 2 development project, lunskoe OPF Sakhalin
Island of Russia
Company profile: international constructors and engineering expertise in testing start up
Commissioning
Responsible on: entire process instrument. Valves .control system and all devices that are involve in system
Knowledgeable on:
*Good knowledge about permit work system
*skilled in PLC, DSC, ESD in plant
*Capacity to do jobs alone by following safety rules and Regulation
*Good experience and familiar in plant jobs
* Able to do jobs independently
Date: June 2007 to January 2008
Name of Company: Tozzi Qatar W.L.L
Location: Ras laffan state of Qatar
Position: instrument commissioning technician
Project involve: Rasgas, RL (3) common off plot project (oil and gas refinery)
Company profile: international constructor’s company expertise in switch board, console
System, air handling unit to local / main control building and sub-station
Responsible on: work as a part of a team responsible in installation, construction, repairing of all instrument devices testing and commissioning of new equipment and modify the existing device and equipment
Knowledgeable on:
*standard procedure in installation of equipment and instrument device as per
Hook up
*understand the proper procedure to install instrument devices in safe way and
Accessible to the Maintenance
*knowledge to test all the device in safety way
*literate to operate console as a part of commissioning group
Date: May 2006 to December 2006 Name of Company: Bechtel international Inc.
Location: republic of Kazakhstan
Position: instrument commissioning technician
Project involve: Tengiz oil field second generation project (SGP) republic of Kazakhstan
Company profile: multinational company expertise in construction of refinery, industrial
Plant and facilities .testing start up and commissioning
Responsible on: final inspection of the entire field instrument to precede the testing and commissioning
Knowledgeable on:
* Inspection of the entire instrument device to meet the exact requirement in
Installation
* As build drawing in exact installation
* Preparation of drawing to start commissioning
* testing and start up the control system
Date: February 2005 to April 2006 Name of Company: Bechtel international Inc.
Location: Equatorial Guinea, West Africa
Position: instrument technician
Project involve: Equatorial Guinea LNG train 1 project (liquefied natural gas refinery)
Company profile: multinational company expertise in construction of refinery, industrial
Plant and facilities .testing start up and commissioning
Responsible on: installation of all field instruments in the proper aspect. And calibrate the entire field instrument as per data sheet (range & configuration)
Knowledgeable on:
*using high pressure hand pump with a max. Range of 500 to 700 bars (pressure
Portable calibrator) in a safety way
*understand in using of calibrator such as electronic calibrator, pneumatic
Calibrator, crystal calibrator
*familiar to communicator like HART 275, TRX, druck pressure calibrator
*testing and commissioning
Date: June 2004 to September 2004 Name of Company: Hyundai engineering & construction LTD
Location: Assaluyeh Islamic republic of Iran
Position: instrument technician
Project involve: phase 4&5 onshore & offshore. Oil and gas, gas to liquid refinery south
Pars field development project of Iran
Company profile: engineering & Construction Company, more on sub-contractor onshore
And offshore refinery construction
Responsible on: establish the entire instrument device and control system for start up and commissioning
Knowledgeable on:
*procedures and preparation of testing and commissioning
*proper procedure of using test equipment specially high pressure hand pump
*handling different kinds of communicator and calibrator
*procedure as a permit receiver
Date: February 2001 to February 2004 Name of Company: ABV rock group K.B
Location: Medina kingdom of Saudi Arabia
Position: instrument technician
Project involve: underground oil & gas storage plant facilities, Saudi ARAMCO
Government project
Company profile: main contractor in Saudi aramco project expertise in underground
Facilities, building and oil & gas storage plant
Responsible on: installation. Testing and commissioning
Knowledgeable on:
*secure the permit to work
*prepare the entire document and drawing during commissioning period such as
Termination schedule, loop drawing, P&ID, location drawing, hook up drawing,
Cause and effect and protocol
*quick response to rectify the trouble during testing and commissioning
*jobs involves cleaning and servicing of field instrument in safety way
Date: May 1999 to July 2000 Name of Company: McConnell Dowell Saudi Arabia LTD
Location: Riyadh kingdom of Saudi Arabia
Position: Electrical & instrument technician
Project involve: project mainly upgrading of the refinery control system to new
YOKOGAWA distributed control system DSC
Company profile: one of main contractor in Saudi aramco project most projects are
Vertical & horizontal upgrading of the system all are refinery
Pre-com and commissioning
Responsible on: replace all old pneumatic instrument into new electronic transmitter to upgrade the system DCS (distributed control system)
Knowledgeable on:
*work permit system as a permit receiver in the group
*handling hot cut over jobs in the safety procedure
*online system and to asst. maintenance group
*operate YOKOGAWA touch screen console
Date: December 1995 to December 1998 Name of Company: ABV rock group K.B
Location: Riyadh kingdom of Saudi Arabia
Position: Electrical & Electronic technician
Project involve: underground oil & gas storage plant facilities, Saudi ARAMCO
Government project
Company profile: main contractor in Saudi aramco project expertise in underground
Facilities, building and oil & gas storage plant
Responsible on: mounting and installation of the entire equipment electrical or electronic device. And energize and commission to turn over the project
Knowledgeable on:
*understand and interpret plan scaling and detail drawing during
Installation
*used power tools, hand tools, test equipment and authorize to drive light
Equipment to carry out installation
*trouble shooting and rectify the problem quickly by technical skills
*execute testing and commissioning as per procedure
*maintain all electrical and electronic equipment in good condition
Date: August 1992 to November 1993 Name of Company: ABV rock group K.B
Location: Medina kingdom of Saudi Arabia
Position: Electrical technician
Project involve: underground oil & gas storage plant facilities, Saudi ARAMCO
Government project
Company profile: main contractor in Saudi aramco project expertise in underground
Facilities, building and oil & gas storage plant
Responsible on: the entire equipment electrical or electronic device to be installed. Maintain the good running condition of the equipment
Knowledgeable on:
*install electrical equipment such switch gear, compact transformer, distribution
Board, grounding rod, house wiring, connection of service main
*defects diagnosis and rectification on low and medium voltages in placing cable
Faults
*handling electrical test equipment (current injector, megger, multimeter, phase
Sequence, ammeter)
*operate of low and medium voltage switch gear
* preparing shutdown and handling all event them that are related in load transfer
Date: April 1983 to January 1990 Name of Company: Brent school international
Location: Philippines
Position: Electrical technician
Project involve: international school with a dormitory inside the camp to accommodate student their own facilities
Company profile: international school associated of school colleges and university
Responsible on: all electrical equipment to maintain good condition at all time
Knowledgeable on:
*handling in maintaining all the various electrical equipment
*using various test equipment for quick response in any trouble in the equipment
*handling installation in new construction of various electrical equipment and
Device in safety way
SSS No : 01-0663324-5 TIN No : 156-158-192
PASSPORT No : XX3309613 NBI No : B59JOLANEL0000
DATE ISSUED : MARCH 23. 2009 VALIED : MARCH 22.2014
PLACE ISSUED : MANILA PHILS.