Sergio Leyva
Phone: 323-***-****
*************@*****.***
SUMMARY OF QUALIFICATIONS
An experienced non-licensed engineer with more than ten years of experience performing preventive maintenance at various facilities. Strengths include working with little or no supervision, developing good working relationships with all relevant people. Committed to carrying out work duties safely and correctly relying on own initiative. Possess the ability to work off hours or shifts that include holidays, nights or weekends.
WORK HISTORY
Kindred Healthcare
11/2008 to 12/2011
Non-Licensed Engineer
• Was responsible for servicing and general maintenance of the hospitals daily operations
• Operated and maintained physical plant and equipment such as boilers, pumps, air conditioning equipment, electrical and plumbing
• Duties also included carpentry repairs to walls and ceilings
• Supported maintenance and repair of production equipment, fixtures and tooling
• Repaired or replaced defective equipment parts, using hand and power tools and reassembled equipment
• Documented work performed
• Worked with other staff on projects assigned
• Performed various, miscellaneous standard duties as required
Freelance Work
01/2006 to 10/2008
Handyman
• Work included performing residential remodeling of homes
• Demolition and framing of walls
• Installation of new plumbing including sinks, faucets, garbage disposals, toilets, bathtubs and whirlpools
• Drywall, mudding, wall texturing, skip coating and skip trowel
• Painting and wallpapering
• Installing cabinets and Formica
• Flooring included hardwood floors, travertine, ceramic tile and linoleum
• Applied plaster and stucco to exterior walls
High Park Investment Groups
02/2003 to 12/2005
Craftsman
• Work included performing residential remodeling of homes
• Demolition and framing of walls
• Installation of new plumbing including sinks, faucets, garbage disposals, toilets, bathtubs and whirlpools
• Drywall, mudding, wall texturing, skip coating and skip trowel
• Painting and wallpapering
• Installing cabinets and Formica
• Flooring included hardwood floors, travertine, ceramic tile and linoleum
• Applied plaster and stucco to exterior walls
South Bay Vista Hospital (Community Hospital of Gardena)
01/1999 to 02/2003
Maintenance Engineer
• Remodeled patient rooms
• Constructed bathrooms including handicap facilities
• Installation of framing and drywall
• Plumbing repairs included installation of sinks, toilets, urinals, unclogging drains and repairing leaks
• Prepared walls for wallpapering and painting
• Installed light fixtures
• Installed doors, countertops, baseboards and flooring
• Assembled office furniture