Post Job Free
Sign in

Project Manager Engineer

Location:
Springboro, OH
Salary:
120000
Posted:
March 16, 2012

Contact this candidate

Resume:

Robert Sum, P.E., LEED Green Associate

Highlights Seasoned Project Manager with a commitment to building customer relationships based on quality service, cost-effectiveness and team work.

Education 1984 Syracuse University, B.S., Civil Engineering, L.C. Smith College of Engineering

1983 State University of New York, B.S., Forest Engineering, College of Environmental Science and Forestry

Registered Professional Engineer in New York and Ohio

LEED Green Associate

Experience Kaleida Gates Vascular Institute, Buffalo, New York

This $165 million construction project included 11 floors consisting of structural steel and concrete SOD with sub-basement level; a new Ed and Ambulance entry with 58 patient rooms, 3 trauma rooms and 2 CT scan / radiology rooms; a new 3 story entry foyer, new administration suite; 62 oversized recovery rooms for extended stay non-critical patients, a new Wellness center with a library and video conference room; 7 new operating rooms (4 boom) 3 of which are "hybrid" for radiology and prepped for CT; a prep recovery area with 7 beds; 16 ICU rooms 2 of which are isolation rooms and central clean core with a satellite sterilization area; 16 lab procedure rooms; and a centralized 2 story collaboration space.

Three Rivers Local Schools, Cleves, Ohio

This $64 million project consists of constructing a multi-story 261,000 sq. ft. PK-12 school facility for all 1,900 District students, realigning and reconstructing adjacent public roadways, constructing ancillary athletic facilities, with subsequent demolition of other District educational facilities.

Clinton-Massie Local Schools, Clarksville, Ohio

$33 million building program involving construction of a new 104,000 sq. ft. PK-5 Elementary School, as well as renovations to the existing 75,000 sq. ft. 6-8 Middle School.

Wastewater Treatment Plant, Village of Beaver, Pike County, Ohio

Designed and administered construction of new sewers, submersible pumps stations and 60,000 gallons per day extended aeration wastewater treatment facility. Worked with funding agency to expedite project funding and contract changes.

Eastern Local Schools, Winchester, Ohio

This $48 million project included renovation of the existing 46,000 sq. ft. Russellville PK-5 elementary school, construction of a new 48,000 sq. ft. Sardinia PK-5 elementary school, a new 62,939 sq. ft. 6-8 middle school and a new 90,000 sq. ft. 9-12 high school.

Runway and Connector Taxiway, Penn Yan Airport, Penn Yan, New York

Hydrologic modeling, hydraulic control optimization, design of new drainage and pavement improvements, runway markings, structural analysis, earthwork computations and grading. Also responsible for electrical and lighting improvement design including duct banks, electrical vault building and light layout per applicable FAA codes.

Fayetteville-Perry Local Schools, Fayetteville, Ohio

$21 million renovation of the existing 72,000 sq. ft. PK-5 elementary school (including 11,204 sq. ft. of additions) and construction of a new 103,578 sq. ft. 6-12 middle/ high school.

Princeton City Schools, Cincinnati, Ohio (OSFC)

This $160 million project consisted of construction of seven new elementary schools and the renovation of an eighth elementary school including new buildings at Lincoln Heights, Sharonville, Springdale, Stewart and Woodlawn.

Trotwood-Madison City Schools, Trotwood, Ohio

Led preconstruction, diversity, inclusion, local participation and construction of a new 200,000 sq. ft. 9-12 High School facility. Also, lead point of contact and Project Executive for abatement and demolition of multiple buildings, as well as construction of a new 50,000 sq. ft. PK-1 facility, two new 65,000 sq. ft. (per each) 2-5 Elementary School facilities and a new 60,000 sq. ft. 6-8 Middle School facility.

High Rate Combined Sewer Overflow Treatment Facilities, City of Auburn, New York

Design and construction administration of four high rate CSO facilities each including a swirl concentrator, disinfection tank and control building along with associated site work, site piping, control instrumentation, HVAC electrical and plumbing work.

Georgetown Exempted Village Schools, Georgetown, Ohio

Project Executive for construction of a new 90,000 sq. ft. K-6 Elementary and Middle School facility, as well as renovations and additions to the 7-12 High School facility.

Wastewater Treatment Plant, Village of New Miami, Butler County, Ohio

Designed 0.5 million gallon per day oxidation ditch process unit wastewater treatment plant including screening facilities, grit removal, clarifiers, ultraviolet disinfection, aerobic digesters, sludge dewatering, chemical storage, chemical feed equipment, emergency generator, and instrumentation.

Water Treatment Plant Improvements, Village of Frankfort, Ross County, Ohio

Developed design plans and funding agency applications for improvement of Frankfort’s Water Treatment Plant, including installation of new dual aeration and filtration units, preservation of gaseous chlorine disinfection system, installation of new softeners and high service pumps.

Pennyroyal Road Sewer, City of Springboro, Warren County, Ohio

Prepared design plans and technical specifications to extend sanitary sewer along Pennyroyal Road, underneath U.S. Route 75 up to the new City of Springboro Water Treatment Plant.

Well Pump Design and Permitting, City of Springboro, Warren County, Ohio

Raw water well pump and piping design for new City of Springboro Water Treatment Plant including pump and hydraulic calculations, supervision of technical staff, budget estimating, coordination with City officials, geotechnical consultants and well drillers.

Orrville Road Reconstruction, City of Fairborn, Greene County, Ohio

Prepared design plans for road design, hydraulic sewer and detention basin design, cost estimating, supervision of design team, close coordination with City officials and budget monitoring.

Water and Sewer Department Pump Stations, Miami, Made County, Florida

Design, cost estimating, permitting and construction of 140 submersible and suction lift pump stations ranging in capacity from 50 to 1,500 gallons per minute in accordance with U.S. EPA Consent decree/Settlement Agreement requirements.

Water Treatment Plant Inventory and Evaluation, City of Poughkeepsie, New York

Inventory and evaluate potassium permanganate zebra mussel control, alum coagulant, polymer coagulant, powdered activated lime, fluoride and orthophosphate corrosion control chemical feed systems at the City of Poughkeepsie’s Water Treatment Plant.

U.S. Interstate Route 70, Glenwood Canyon, Glenwood Springs, Colorado

Performed contract administration and field engineering of intricate highway/bridge projects totaling $28 million. Supervised up to ten (10) inspectors of steel-box-girder bridges, cast-in-place, post-tensioned concrete bridges, as well as double-tee and tie back retaining wall systems.

Career Path 2006–2012 Turner Construction Company Cincinnati, OH

Senior Project Manager

Lead up to ten (10) project professionals on multiple K-12 projects totaling over $300 million, from concept through successful completion of construction on time and within budget. Supervise field construction. Organize, plan and schedule to complete work on time, within budget and at the highest quality level. Also, responsible to protect and promote the interest of the project, in all matters, and to take actions, as required, to satisfy responsibilities that include trade contractor coordination, workforce scheduling, field work plans and safety inspections.

2001–2006 Megen Construction Company Cincinnati, OH

Manager of Educational Facilities Division

Grew division to over $160 million from $40 million by nurturing new clients, understanding client needs, wants and desires, and then providing quality service.

1999–2000 URS Corporation Centerville, OH

Senior Manager

Client liaison for municipal wastewater and water collection, conveyance and treatment design and construction projects throughout southwestern Ohio.

1998–1999 Jones Warner Consultants Centerville, OH

Senior Project Manager

Technical leader for municipal wastewater, water and roadway design and construction projects. Also, developed work scope descriptions, project profiles, budget and construction cost estimates.

1995–1997 Blasland, Bouck & Lee, Inc. Syracuse, NY

Senior Project Engineer

Design leader of large, multi-million dollar, complex and intricate municipal and airport design projects.

1988–1995 Project Engineer/Manager Passero Associates, P.C., Rochester, NY

1987–1988 Project Engineer Nelson Kenderian Associates, Ocean, NJ

1985–1987 Assistant Project Engineer Colorado Highway Department, Glenwood Springs, CO

1984–1985 Environmental Engineer U.S. EPA, Boston, MA

1984 Civil Engineer M.L. MacKay and Associates, Williamsville, NY

Personal Married 21 years with a 17 year old daughter. Enjoy golfing, skiing, biking, fishing, hunting, meeting new people, listening to and assisting others, working with a host of people and successfully completing projects.

Contact Information 433 McCray Boulevard, Springboro, Ohio 45066-9101

937-***-****

*************@*****.***



Contact this candidate