Letcher Pickens III
**** ****** *****, ** ***** Missouri 63146
314-***-****, n0qc2c@r.postjobfree.com
Professional Summary
A detail and results oriented professional with 20 years of troubleshooting, repairing, operating and maintenance of high speed packing equipment, featuring, Fillers, Labelers, Case Packers, Pneumatic and Hydraulic systems. Particular depth in electrical and mechanical skills with extensive knowledge of PLC's and all aspects of instrumentation. An energetic self-motivated individual that works well independently complimented by a high sense of team.
Career Experience
Chrysler Corporation June 1995 - August 2008
Assembler
Repairing, operating and the precise assembly of Dodge trucks
Monitoring inventory control
Operating forklifts, boom lifts and railcar movers
Dispatching orders for material used on specialized applications
Continental Sprayers January 1994 - June 1995
Process Technician
Repairing and calibrating assembly lines
Troubleshooting system using Modicon PLC, and 120 AC/DC control circuits
Repairing and maintaining all pneumatic controlled devices from solenoids to actuators
Implementing rapid changeover methods
Maintaining and set-up of ultrasonic welders (25 - 40 KHZ)
Compiling reliability and production reports
Procter & Gamble November 1987 – May 1993
Intermediate Technician
Repairing, operating and daily maintenance of high speed PLC (Allen Bradley) controlled packing lines
Repairing and operation of carton opening, glue systems, 40- head automatic filler system, case packer and uncaser systems
Maintaining and operating all auto batching controls in the manufacturing of cleaning product lines
Calibrating transducers, pressure switches and other 4 to 20mA instrumentation
Set up and tracked spare parts system
Troubleshooting all high pressure gas furnace controls
Repairing 440, 220, and control circuits using PLC technology and schematic drawings
Assisting in the design, and implementation of new projects presented to the St Louis Plant
City of Houston, Public Works/Waste Water Division September 1981 – November 1987
Industrial Instrumentation Technician
Repairing and calibrating of all pneumatic electro-mechanical and electronic instrumentation
Designing and installing PLC systems
Maintaining, troubleshooting and repairing mini and micro computers using various PLC logic techniques
Supervising five employees with responsibility of planning and disseminating daily work assignments and projects
Field Supervisor for all areas of instrumentation at three major treatment plants with a total of 75 satellite plants, lift stations and pumping stations throughout the city
On-call 24/7 working directly with civil, electrical, and chemical engineers, and plant superintendents
Repairing and rebuilding actuators, positioners, hydraulic and gas valves
Interfaced with vendors to assess needs and negotiate the purchase of equipment (i.e., Honeywell, Foxboro , Bristol, Fisher & Porter, Robertshaw, Gould Modicon)
United States Navy, Honorable Discharge August 1976- September 1980
Electrician/Engineman
Troubleshooting and repairing single phase, three phase AC/DC and variable speed motors
Alignment of motor to pump shaft and repair of reciprocating, centrifugal, duplex and simplex pumps
Maintaining and repairing 440, 220 and 120 electrical circuits
Rewiring and installation of fuse panels, lighting circuits and distribution switchboard panels
Rebuilding and static testing of valves in low and high pressure steam system
Education
Independent Electrical Contractors - St. Louis, Mo
2009 - Present
Electrician
Ranken Technical College - St. Louis, MO
1990 - 1992
Process Control
Houston Community College - Houston, TX 1984 - 1986
Electronic Engineering Coursework
Certifications
OSHA Certified 2010