Post Job Free
Sign in

Project Management

Location:
Cerritos, CA, 90703
Salary:
$45 p/hour
Posted:
December 05, 2011

Contact this candidate

Resume:

DON TURPIN

***** **. ******** ***** ********, CA 90703 310-***-**** **********@*****.***

PROJECT CONTROLS & SCHEDULING MANAGEMENT PROFILE

Twenty -five years experience in work force productivity and work quality by eliminating in Advance potential delays and obstacles through proper planning and coordination of labor, parts and materials, using scheduling, and risk analysis. Cleared for secret programs and experienced in developing projects in Aerospace, power industries and IT Industry. Expertise in implementing Integrated Master Plans & Integrated Master Schedules.

TRAINED AND QUALIFIED IN THE FOLLOWING AREAS:

Critical Path Analysis, scheduling logic, and PERT Networks.

Fast Track 9.0Process.

DCMA 14 point metrics using Schedule Detective Risk Management.

ECAPs (electronic cost account plans).

Experienced implementing Schedule Margin in Program plans.

Computerized scheduling software systems, including, Microsoft Office 2007, Windows XP and Risk Plus not latest version. Earned Value Management System, including work / planning packages, and cost account planning.

PROFESSIONAL PROFILE

NORTHROP GRUMMAN SPACE TECHNOLOGY Redondo Beach, CA

Principle Program Scheduler, 06/04 to Present

My primary role was to manage schedules to ensure work force meeting schedule milestone and delivery dates for various types of engineering effort on secret programs and non secret programs. Analyze schedules to identify in-advance potential delays and obstacles for Program Management Office to be proactive and preventive. Experienced at loading ECAP schedules, Development of Top level Fast Track schedules on developmental hardware product. Developed and maintained monthly and weekly schedule analysis reports.

RAYTHEON ELECTRONIC SYSTEMS El Segundo, CA

Principle Program Scheduler , 07/00 to 06/04

Developed baseline and resource loaded schedules for Battlefield Radar technology projects. Integrating interdependent project activities, determining task interdependencies, provide risk analysis, track issues and action items.

COMPUTER SCIENCES CORPORATION El Segundo, CA

Project Scheduler, 02/00 to 05/00

Developed baseline and resource loaded schedules for an information technology project. Integrating interdependent project activities, determining task interdependencies, provide risk analysis, track issues and action items.

BOEING REUSABLE SPACE SYSTEMS DIVISION Seal Beach, CA

Senior Schedule Analyst, 04/98 to 02/00

Schedule Integration and Critical Path development for an advanced technological Space programs. Identified and monitored schedule deviations and assisted in developing alternatives for corrective action. Evaluated Enterprise wide critical projects with a focus on Process improvements in the areas such as Earn Value System Management and Organizational Development.

EDISON INTERNATIONAL - Rosemead, CA

Project Control Analyst, 11/97 to 03/98

Provided Project scheduling and planning support to company-wide mission critical initiative implementation at Edison International. Develop integrated schedules and plans to detail initiative activities, interface with organization managers to support executive visibility requirements. Using Microsoft Project and Primavera P3.

Boeing - Redmond, WA

Project Planner, 04/97 to 08/97

Provided project-planning support to company-wide mission critical initiative implementation at Boeing Information & Support Services. Develop integrated schedules to detail initiative activities, interface with organization managers to support executive visibility requirements. Using Primavera Project Planner (P3), Microsoft Project, and Microsoft Office.

ROCKETDYNE - Reseda, CA

Project Scheduler, 10/96 to 03/97

Develop Engineering and Manufacturing schedules for electrical hardware install on the space station Freedom for Rocketdyne. Duties included tracking of parts, on the space station Freedom for Rocketdyne. Duties included tracking of parts, subassemblies and circuit boards from source through fabrication to final box assembly. Microsoft Project Maintain schedules, report progress and present impact analysis, using.

MCDONNELL DOUGLAS – Long Beach, CA

Project Scheduler, 01/96 to 09/96

Develop Engineering and Manufacturing schedules for electrical hardware installed on the space station Freedom for McDonnell Douglas. Duties included tracking of parts, sub-assemblies and circuit boards from source through fabrication to final box assembly. Maintain schedules, report progress and present impact analysis, using Microsoft Project.

NORTHROP AIRCRAFT – El Segundo, CA

Engineering Planner, 1991-1995

Analyzed work flow procedures and record systems. Provided recommendations for work flow problems. Tracked data regarding engineering drawings and released drawings utilizing Artemis.

MCDONNELL DOUGLAS CORPORATION – Long Beach, CA

Senior Project Analyst, 06/86 to 06/91

Analyzed current work flow procedures and record systems. Recommended and implemented alternatives, work procedures and reports, and monitored costs. In addition represented all of Douglas Aircraft fabrication facilities across the country for the MD80 aircraft. Managing all customer requests for modifications to those aircraft.

NORTHROP ELECTRONICS DIVISION - Hawthorne, CA

Project Scheduler, 1984 to 05/86

Prepared and maintained master schedules for Vice Presidential approval. Also monitored program progress and recommended corrective action where needed.

ROCKELL INTERNATIONAL – Seal Beach, CA

Project Scheduler, 09/81 to 01/84

Developed, implemented and tracked engineering cost data. Evaluated program changes and their effect on schedules and budgets. Performed schedule tracking, progress reporting and impact analysis.

EDUCATION AND PROFICIENCIES

SOUTHERN ILLINOS UNIVERSITY Southern, IL at Carbondale

Bachelor Science in Management

COMPUTER PROFICIENY:

Computerized scheduling software such as Microsoft Project.

Microsoft Office, Excel, Power Point, Windows, XP & PERT Chart Expert.

CUSTOMERS

Edison International Boeing

Rockedyne McDonnell Douglas

Northrop Aircraft & Space Technology Computer Sciences Corporation

Raytheon Electronics

below is my Cover Letter:

DON TURPIN

Project Controls Analyst

Biographical Brief

Mr. Turpin has accumulated over twentyfive year’s experience in program planning and controls in the aircraft, aviation, space, and electric power industries. Applications have included start-up of new projects, implementation of advanced systems and procedures for project control, and schedule integration for multiple projects.

My primary role is to manage developmental hardware and software schedules involving engineering effort and manufacturing hardware deliverables. To ensure the work force was meeting schedule milestones and delivery dates. As well as analyze the health of the schedules (i.e. incorporate proper WBSs for the correct tasks, incorporate proper earned value techniques identified as well) in advance of potential delays to the project at Northrop Grumman Space Technology and Aircraft Systems Divisions.

My assignment for Raytheon was resource loading schedules, schedule development, troubleshooting, Integration and critical path analysis for advanced technology radar programs at Raytheon Electronic Systems.

Prior to joining Raytheon, Mr. Turpin provided project planning, scheduling, and controls services to MDTS, Log/An Inc., Edison International, Boeing Information and Support Services, and Rocketdyne. The Rocketdyne engagement involved engineering and manufacturing schedule coordination and tracking for Space Station Freedom. Previously, he provided similar services to McDonnell Douglas on the same program.

Earlier, Mr. Turpin was employed at Northrop Aircraft’s in workflow analysis and at Northrop Electronics as a Master Scheduler. For Douglas Aircraft, his assignments encompassed work flow and procedures analysis, as well as coordination of information flow between MD-80 aircraft customers and Douglas’ fabrication facilities nationwide. At Rockwell International he performed schedule and cost analysis services.

Southern Illinois University, Carbondale, awarded Mr. Turpin a B.S. degree in Management.



Contact this candidate