Post Job Free
Sign in

Project Manager Management

Location:
Lewes, DE
Posted:
October 12, 2010

Contact this candidate

Resume:

Robert G Rahsman, PG

***** West Chesapeake Street Lewes, DE ▪ 19958  302-***-****  ***********@*******.***

PROFESSIONAL GEOLOGIST

Licensed Professional Geologist in Delaware, Pennsylvania and North Carolina

Experienced and highly skilled geological science professional with expertise in hydrogeologic and geotechnical analyses, modeling and construction management.

SUMMARY OF QUALIFICATIONS

• Over 30 years of experience in hydrogeologic investigations, site characterization and remediation using monitoring well and modeling techniques.

• Extensively managed projects including activities in commercial, municipal, environmental, mining, oil and gas, and water projects.

• Oil and gas experience includes assistant management of Starlight Field (Youngstown Sheet and Tube), design and installation of first successful coal mine methane degasification system (Emerald Mine, Waynesburg, PA) and leasing, design, permitting and installation of oil and gas wells in Ohio, Pennsylvania and West Virginia.

• Expert hydrogeologist with the experience to take a water supply project from conceptual design to final delivery.

SKILLS AND ACCOMPLISHMENTS

Ground Water Design and Development

• Designed and assisted in the installation of high capacity municipal wells at Bridgeville, Delmar, Dover, Georgetown, Milford, Rehoboth Beach, Selbyville, Somerset County, and Snow Hill.

• Prepared groundwater sections of spray irrigation design development reports for Bridgeville, Georgetown and Harrington.

• Designed and permitted pumping test of existing water well for eventual application to Susquehanna River Basin Commission (SRBC) and Department of Environmental Protection (DEP) for appropriation permit.

• Designed and installed shallow groundwater pumping system for foundation dewatering including placement of pumping wells, acquisition and installation of pumping system and system start-up and operation.

Project Management

• Assisted the Corps of Engineers at Nashville District in completing a $309 - million plan to improve the long term reliability of the Wolf Creek Dam (Seepage Rehabilitation Project, Jamestown, KY).

• Developed Operations and Maintenance Manual for the wastewater treatment plant 12-inch injection disposal wells which included testing and analysis of injection system performance, and development of daily operational and maintenance procedures.

• Investigated new groundwater development locations to supplement the current water supply (well and springs), resulting in property right-of-way option and installation of test wells.

• Responsible for the location and installation of raw and potable water wells to supplement the Borough’s present surface water supply including completion of wells, testing and permitting.

• Determined capital and the operating cost to process shot rock for a manufacturing process.

Continued…

ROBERT G. RAHSMAN , P.G. PAGE 2

• Managed the completion of a new surface mine permit which included compilation of geologic and groundwater data and development of mining, erosion, sedimentation control and mining reclamation plans.

• Installation of addition to water treatment system including all piping and tanks, nitrate removal system, new chlorine injection and contact tank, new salt storage vessel and building additions to existing treatment plant and new pump house.

• Managed an accelerated remedial investigation and feasibility study (RI/FS), Phase II, which included detailed environmental site assessments of the potential sources of the volatile organic compound (VOC) contamination, including monitoring well siting, sampling and analysis of resulting data to determine potential migration pathways and possible environmental impacts at Naval Air Station, Keflavik, Iceland.

• Obtained a construction air quality permit for a 600 ton per hour lime handling and load out facility, which included a flow diagram presented in CAD format.

• Performed logging core, scheduling drilling rigs and providing access and reclamation of drill sites in West Virginia.

• Oversight activities for U.S. Army Corps of Engineers (Baltimore Division) at the Kane and Lombard Superfund site which was being investigated by Harding Lawson Associates.

• Field supervision of hazardous waste investigation including installation of monitoring wells under Level C conditions at Heleva Landfill.

• Supervision of replacement well installation, including water line installation and underground boring wastewater construction supervision which was a result of groundwater contamination.

• Worked in mining geology and coal exploration and oil and gas well completions at Bethlehem Steel, Pennsylvania Mines Corp., Bellaire Corp., Sohio Coal.

Project Analysis

• Composed numerous preliminary groundwater impact assessments for large on-site wastewater treatment and disposal systems.

• Prepared comprehensive reports for development and analysis of wastewater flow models, slug and pumping test data, and seasonal depth to groundwater using Delaware Geologic Survey area digital interpretations and statistical analysis.

• Performed statistical analysis of DGS continuous local well records and interpretation of hydrostratigraphy from borings and well logs.

• Investigated and recovered subsurface chemical spill in karstic setting.

• Characterized basin groundwater potential, well location and installation, and conducted pumping test analysis (72 hour test with 44 monitoring points), well permitting (DEP and SRBC) and public presentation of impact use on area private water wells.

• Performed a hydrogeologic investigation concerning the mechanism causing formation of iron bearing seeps following abandonment of an underground coal mine which included placement and monitoring of piezometer wells, geochemical analysis, geophysical logging and detailed analysis and mapping of stratigraphic sequences.

• Conducted an RCRA Facility Investigation (RFI) under an EPA consent order to characterize the extent and impact of volatile organic chemicals (VOCs) originating from previous manufacturing operations at East Petersburg.

• Determined the possible impact of VOC contamination on the IBM corporate headquarters water supply at Armonk, NY.

• Determined the groundwater budget for the State of North Carolina.

WORK HISTORY

Lewes, DE 2009 - present

Self-employed Geologist/Hydrogeologist

ROBERT G. RAHSMAN, P.G. PAGE 3

Davis, Bowen & Friedel, Inc., Salisbury, MD 2007 – 2009

Professional Geologist/Hydrogeologist

Skelly and Loy, Inc., Harrisburg, PA 2007

Contract Hydrogeology Consultant

Hershey, PA and Lewes, DE 2003 – 2006

Self-employed Geology Consultant

Dewberry – Goodkind, Inc., Carlisle, PA 1999 – 2003

Fulltime Professional Geologist/Project Manager

Self-employed Geologist 1997 – 1999

R. E. Wright Associates, Inc., Middletown, PA 1987 – 1997

Fulltime Professional Geologist/Project Manager

Self-employed Geologist 1977 – 1987

Lykes Resources, Inc., McMurry, PA 1975 - 1977

Mine Geologist

Moody and Associates, Inc., Harrisburg, PA 1973 -1975

Staff Geologist/Project Manager

EDUCATION

Master’s Degree in Geology

Southern Illinois University

Bachelor’s Degree in Geological Science

Pennsylvania State University

CERTIFICATION AND TRAINING

Includes only 2009 & 2010 training. Prior training available upon request.

Vadose-zone Monitoring as a key to Groundwater Protection and Optimization

Of Remediation Strategies 2010

Evaluating LNAPL Remedial Technologies for Achieving Project Goals 2010

Chesapeake Bay TMDL Webinar 2010

Performance –based Environmental Management 2010

LNAPL Characterization and Recoverability –Improved Analysis 2009

An Improved Understanding of LNAPL Behavior in the Subsurface-State of

Science vs. State of Practice 2009

Introduction to CERCLA 103, EPCRA, and CAA 112 ® 2009

Membrane Systems for Water Reuse: Challenges, Rewards and Lessons Learned 2009

Computational Toxicology: ToxCast and the Comparative Toxicogenomics

Database (CTD) 2009

Key Elements to a Successful Membrane Plant Implementation 2009

OPP Approach to Cumulative Risk Assessment 2009

Estimating Risks from Petroleum Hydrocarbons using Spreadsheets 2009

Exposure-based Community Assessment Tools 2009

ROBERT G. RAHSMAN, P.G PAGE 4

Phytotechnologies 2009

Risk Assessment Forum: Concept and Framework, Case Studies, and

Research Needs 2009

Implementation of the Inland Bay Pollution Control Strategy Regulations-

New Sediment and Storm Water Requirements 2009

Workshop on On-Site Wastewater Treatment and Disposal Systems Regulations 2009

Green remediation Voluntary Standards Initiative 2009

TECHNICAL SKILLS

WhAEM Modeling, AutoCAD/AutoCADMAP, Microsoft Office suite, Techbase mine evaluation software, MODFLOW



Contact this candidate