RESUME ( C.V. )
First Name: Hamid
Last Name : Zadmehr
Marital status: Married
Nationality: Iranian
Objective:
* ******** ********* & Turbo compressor Erection&commissioning&Manintenance.
* ****anical Eng. Supervision.
3 Rotary Equipment, Supervision.
4.Mechanical maintenance supervision
Experience:
Year/Co. nov 2009 till Now – NORTH DRILLING Co. – RIG 111&117.
Position: Mechanical Maintenance Manager for mechanical equipment at Rig 117&111 (maintenance)
Responsibility: chief mechanic in drilling rig for rig up & commissioning & maintenance & rig down and moving works.
My responsibility is repair and PM for Top drive & Draw work & CAT Engine and other rotary
equipments maintenance at drilling rig .
Year/Co. Jan 2009 to nov 2009 – NIC SUN Co. – TEHRAN OIL REFINERY.
Position: Project Manager for Central Work Shop (maintenance)
Responsibility: project manager in central maintenance work shop
Tehran refinery central work shop has 6 part (1 machin shop 2 Exchenger shop 3 welding shop 4 pump shop 5 valveshop 6 gasket shop)
I was responsible Controlling & managing of this project .
Year/Co. Mar. 2008 to Jan2009 – PETRO SANAT Co. – BANDARABBAS OIL REFINERY.
Position: Project Manager for Machinery Maintenance ( at all plant)
Responsibility: project manager for 2000 rotary equipment(all type pump Gas and steam turbinecompressor mixer &etc.)
My responsibility was controlling & managing rotary equipment PM and maintenance in this project.
Year/Co. Sep. 2007 to Mar 2008 – FPC Co. RAZI PETROCHIMICAL CO.
Position: Maintenance Manager (machinery & mechanical& instrument departments)
Responsibility: Maintenance Manager in new ammoniac plant after commissioning.
My responsibility was managing of machinery & basic mechanic & instrument departments.
Year/Co. Feb. 2007 to Sep. 2007 – PETRO TURBINE CO. ARYA SASOL POLAYMER CO.
Position: Project Manager for Critical Machinery Commissioning (at Olefin Plant)
Responsibility: project manager in critical machinery project in commissioning.
Olefin plant had 4 Big steam turbine and 6 center fiugal compressor and 2 reciprocating compressor and 12 small steam turbine and pump and 1 turbo expander.
My responsibility was managing & coordinating for commissioning of Siemense and Mitsubishi vendors.
Year/Co. Jan. 2006 to JAN. 2007 – FPC CO. RAZI PETROCHEMICAL CO.
Position: Critical Machinery Maintenance Manager (at Old Ammoniac Plant)
Responsibility:My responsibility was maintenance managing of critical machinery equipment.
(PM & Repair)The old Ammoniac plant had 3 Siemense Steam turbine and 6 GHH &MAN centerfiugal compressors.
Year/Co. May. 2004 to Jan. 2007 – Fara Saant CO. RAZI PETROCHEMICAL CO
Position:Mechanical & Machinery Maintenance Manager (at Phosphoric Acid & DAP Plant)
Responsibility:My responsibility was Mechanical Maintenance Engineering and managing of
Phosphoric Asid & DAP plant.(PM & Repair)
Year/Co. Aug. 2002 to March. 2004 – Ramp CO. RAZI PETROCHEMICAL CO
Position: Machinery Maintenance Engineer (at Gas Plant)
Responsibility:I was machinery cleark and engineer of maintenance( alignment repair disassembely
and assembely & all machinery works) in gas unit.
Other Activities:
•Critical Machinery Engineer at Arak Petrochemical CO. For Overall
• Critical Machinery Engineer at Ghadir Assaluyeh Petrochemical CO. For commissioning
• Critical Machinery supervisor at Bandar Imam Petrochemical CO. For Revamp.
Education:
•Mechanical Engineer (Khomeini shahr University)
Special Training :
• Alignment
• Steam Turbin Maintenance
• Centrifugal Pump & Compressor Maintenance
•mechanical maintenance