Benjamin Beasley
PO Box ****
Crosby, Texas 77532
*********@*******.***
OBJECTIVE: Seeking a responsible position where experience, ability and smart work will ensure proper performance of employees, quality products and a safe work environment utilizing effective technical skills.
QUALIFICATIONS
I'm a highly motivated and results-oriented professional with exceptional leadership and communication skills. I'm experienced in working in a multi-skilled, achievement oriented, team based environment utilizing lean manufacturing. I have a solid record of accomplishment of consistently meeting company goals, objectives, missions and values of the organization.
EDUCATION
Bachelor of Science Mechanical Engineering, Prairie View A&M University
Supervision Certification Program, University of Houston
EMPLOYMENT
May 2011-Present Production Supervisor, Lone Star Staffing @ Nelco
Supervise 10 employees in the production of lead for Medical And Industrial X-Ray Protection
June 2010-Aug 2010 Quality Inspector, Certified Staffing @ RTI Fabrication
Inspect titanium, stainless steel, nickel, and other metal alloys using measuring and test equipment such as micrometers, calipers, depth gauges for
use in various commercial aerospace, defense, and industrial applications.
Aug 2008-Present Home Based Business, Self Employed
Home re-constructure/improvement, flooring, insulation, sheetrock dywall, painting
Dec 2006-July 2008 Production Supervision, Quality Tubing
Supervise 19+ employees to ensure production schedule, goals, targets and deadlines are met. Maintain employee time and attendance in Kronos. Conduct departmental production and safety meetings. Held frequent development discussions. Stress team unity contributions.
Apr 2005-Dec 2006 Production Supervisor, Venturi Staffing Partners @ Inventec
Supervise 60+ employees in the manufacturing of servers, computers in a manufacturing/distribution environment. Controlled five manufacturing lines daily where production rates were met or exceed production schedule. Assured all manufacturing assembly procedures and SOP's were adhered to according to ISO standards.
Mar 2004- Apr 2005 Operator, United States Postal Service
Prepare mail, operate ASFM flat mail machine. Operate DPM letter machine
Feb 1995-Jan 2004 Production Supervisor, Alcon Manufacturing
Controlled three manufacturing lines for Pharmaceutical/Medical Device company where daily production rates met or exceeded projected schedules. Assured all manufacturing procedures and SOP's are adhered to according to ISO 9000 standards. Assist in effort to maintain the objective of "zero manufacturing defects" in finished products. I continued to seek to optimize processes to lower cost and/or improve product quality. Ensured product/processes resulted in finished products that met FDA/GMP and exceeded customer expectations.
Quality Engineer, Alcon Manufacturing
Engineer working for Quality Assurance department which governs customer complaints and customer returns. I investigated customer complaints as the issues dealt with material structure or process faults and defects.
Technical Skills and Training
Quality System Compliance Auditing Team member
Quality Management System
ISO Standards
Wrote and reviewed Engineering Change Notice (ECN) to improve production efficiency
Production Room Layout
Emergency Action Plan and Emergency Response Team
Failure Mode and Effects Analysis (FMEA)
Special Equipment - Electrical power outage/Sealing and packaging Equipment
Hazardous Material and Energy Control
MS Office Training - Excel, Powerpoint, Word
AS400
Easy Track
JD Edwards
Kronos