Post Job Free
Sign in

Electrical Manufacturing

Location:
United States
Posted:
February 24, 2010

Contact this candidate

Resume:

Vernon Haskell

** ******* ***** ****

Wallingford, CT. 06492

Home Phone: 203-***-****

Cell Phone: 203-***-****

Email: *********@***.***

OBJECTIVE:

To obtain a job in the Electrical Manufacturing Field where I can utilize my building, management and leadership skills to provide the highest quality product possible.

QUALIFICATIONS:

High motivated, detail oriented, self starter with strong organizational skills who is capable of working independently or as part of a team. Able to take action in solving problems while exhibiting good judgment and responsibility with a timely systematic approach to decision making.

EDUCATION:

1975-1979 H.C. Wilcox RVTS, Meriden, CT., Graduated with Electronics Degree.

1979-1980 Waterbury State Technical College, Waterbury, CT., pursuing an Associates of Science Degree in Electrical Engineering.

EMPLOYMENT:

1995- 2009 Manufacturing Manager, Process Solutions Incorporated

- Supervised and managed 4 full time employees in a UL listed panel shop, building PLC based control systems for industrial machinery.

- Trained individuals on proper wiring techniques and schematic reading.

- Worked closely with various departments on a daily basis to plan and schedule all panel manufacturing.

- Maintained inventory of parts and wiring supplies necessary to assemble panels.

- Worked with engineering department on layout and design of panels.

- Able to troubleshoot down to parts level during equipment testing.

- Working knowledge of 480VAC/3phase electric power.

- Working knowledge of 110VAC and 24VDC control power.

- Worked with various types of electronic/electrical test equipment.

- Worked with all hand and power tools required to fabricate control panels.

- Completed daily shipping and receiving tasks using UPS and Federal Express software.

- Handled logistics of shipping jobs to customers’ facilities.

- Traveled to customers’ facility for equipment installation, install Rigid or EMT pipe, ladder tray and sealtites, pull new wire and cables, terminate all wires and cables, set up and troubleshoot newly installed equipment.

- Supervised and managed installation crew at customers’ facility.

1988- 1995 Plant Manager, Hryb Control Systems

- Over saw all aspects of electrical and mechanical manufacturing of equipment

- scheduling of daily tasks for 10 man crew

1987-1988 Control Panel Electrician, Steel Technologies

Built and wired all control panels, operator stations, and control desks for new plant facilities. Traveled to customer site and did installation and startup of new equipment.

1985-1987 Self Employed, Creative Landscaping

- Supervised 2 man operation cutting grass and doing minor landscaping projects.

1979-1985 Intergrated Industrial Systems, Electronic Field Service Technician

Traveled nationally and internationally performing service, installation and startup of high tech electrical equipment for the Metals Industry.



Contact this candidate