Lynnard Lee Armstrong

Civil Superintendent

*** **** ******** kqp8go@r.postjobfree.com 254. 644.8370 (Home)

Groesbeck,Texas 76642 254. 265.1843 (Cell)

Summary

• Planning, scheduling and coordinating construction operations for new and existing projects

• Completing projects safely, within specified time limits and within budget guidelines

• Instilling an “if it cannot be done safely it will not be done” mentality on a jobsite. This has led to over a million hours worked without a recordable. It is this attitude towards safety that is passed from the project management down thru programs and supervisor training that can accomplish a safety first worksite. A job will not be done unless it is done safely.

• Coordinating activities with subcontractors and engineering disciplines while troubleshooting and resolving technical discrepancies

• Assuring compliance with regulations, construction codes, and specifications thru proper quality controls that prepare and submit reports on a timely basis

• Setting up document control to capture revisions and change orders along with their impact

• Preparing cost estimates including time, labor, supplies, equipment and material

• Implementing cost effective acquisition of necessary tools, materials and equipment

Employment History

CAJUN CONSTRUCTORS CIVIL SUPERINTENDENT Nov.08 to Dec.09

Projects Chevron CCR Project, continuous catalyst regeneration (Pascagoula, MS) Chevron PBOP, Pascagoula Base Oil Project (Pascagoula, MS)

 Directed all phases of construction (quality control, survey, concrete placement, excavation, dewatering, formwork, rebar, embeds, under-ground piping, backfill, paving).

 Responsible for OSHA SAFETY requirements and supervision of over 200 employees

 Implemented 100% “no surprise” excavation program in an existing 50 year old refinery.

 Employees working under my supervision worked over a year with no loss time or recordable incidents, (saving Cajun millions this past year in self insured reimbursements) while completing all contractual responsibilities in allotted time frame.

 Promoted “incident and injury free” work site benefiting employees, contractor (Cajun), general contractor (Bechtel) , and owner (Chevron).

FLUOR CARPENTER FOREMAN Dec.07 to Jun.08

Projects Oak Groves Plants 1 & 2 800MW units (Franklin, TX)

▪ Responsible for supervision and management of a carpentry crew. Construction of a coal burning power plant construction project while complying with both company and OSHA safety requirements

▪ Conducting daily and weekly safety meetings. Reading blueprints and doing take offs for concrete placement.

▪ Development and training of employees

MORRIS SHEA BRIDGE CO CIVIL SUPERINTENDENT Oct.06 to Dec.07

Projects Resorts (San Juan Puerto Rico)

 Directed all phases of construction, daily logs, implementation of safety programs, contract compliance with owner, human resource documentation, personnel management, direct daily supervision resulting in production levels meeting scheduled goals.

 Coordinated the installation of DeWaal, driven, and auger cast piles. Oversaw the installation of secant walls and sheet piling. Supervised the excavation, formwork, embeds, rebar and concrete placement for foundations and area paving.

GREEN PASTURES LAWN CARE OWNER / OPERATOR Mar.05 to Oct.06

 Operated family business due to parent’s temporary illness.

MORRIS SHEA BRIDGE CIVIL SUPERINTENDENT Sept.03 to Jan.05

Projects Resorts (San Juan Puerto Rico) (Jamaica) (St. Croix)

▪ Directed for all phases of construction, daily logs, implementation of safety programs, contract compliance with owner, human resource documentation, personnel management, direct daily supervision resulting in production levels meeting scheduled goals.

 Coordinated the installation of DeWaal, driven, and auger cast piles. Oversaw the installation of secant walls and sheet piling. Supervised the excavation, formwork, embeds, rebar and concrete placement for foundations and area paving.

H. B. ZACHRY CO. PROJECT MANAGER Jun.99 to Aug03

 In charge of all phases of project from safety, documentation, scheduling, estimating, and personnel.

Projects Limestone Generating Plant Rotary car dumper (Jewett, TX)

 Supervised shoring, excavation, formwork, embeds, rebar, and concrete placement. At that time it was the largest & deepest opened shored excavation in the US.

Calpine Freestone Energy Center - 4 on 2 natural gas-fired facility (Fairfield, TX)

 Conducted massive “hog out” of entire site and coordinated subcontractor drilling of support piles. Supervised the formwork, embeds, rebar, and concrete placement of all foundations and duct banks. Controlled material placement and preparation for area paving. Finished all above ground pedestals (turbines, fans, pumps, etc).

LIMESTONE MEDICAL HOSPITAL - DIRECTOR OF MAINT. 1997 To 1999

GROESBECK ISD - CARPENTER MAINT. SUPERVISOR 1995 To 1997

ARMSTRONG BUILDERS - RESIDENTIAL BUILDER 1992 To 1995

H. B. ZACHRY - GENERAL FOREMAN 1988 To 1992

CAHABA CONSTRUCTION CO. - CARPENTER FOREMAN 1987 To 1988

KEN BAKER BUILDERS - CARPENTER FOREMAN 1985 To 1987

H.B. ZACHRY CO. - CARPENTER 1984 To 1985

BECON CONSTRUCTION - ENGINEERING AIDE 1982 To 1984

BELCO CONSTRUCTION - CARPENTER FOREMAN 1978 To 1982

Education

Texas A&M University, Commerce, Texas GPA:3.45

Bachelor of Science - Construction Management Minor: Business