Post Job Free
Sign in

Manager Quality Control

Location:
Jacksonville, FL, 32256
Salary:
120,000.00
Posted:
September 15, 2010

Contact this candidate

Resume:

Page * of * James William Davis

**** ****** ***** ******

Jacksonville, Florida 32256

904-***-**** & 904-***-**** (Cell)

E-mail address: ******@*******.***

Education: High School:

Hopkinsville High School

College:

Murray State College

Florida Community College Jacksonville

North Florida University

Experience:

May 2009 to July 2010

Country Contracts O & M Lead Manager

Fluor Government Group (Afghanistan)

In charge of all in Country O & M Contracts in Northern and Southern Afghanistan,

overseeing the administration of all O & M contract documentation from RCA’s to

the issuing and implementation of the Contract and Contract Modifications.

May 2008 to Present

Senior Contracts Manager

Fluor Constructors International, Inc.

Chevron Renewal Project, Richmond Refinery, Richmond, Ca.

Senior Contracts Manager , writing scopes of work (RFP’s) and administration of

contracts, and modifications to existing contracts. Interfacing with the Client,

Contractors, Fluor Area Managers and Engineers.

June 2006 to January 31, 2007

Chief Contracts Administration Manager

Halcrow/HPA (Jacksonville Port Authority)

Chief Contracts Administration Manager, for Halcrow/HPA, on a $300 Million

Shipping Container Terminal for the Jacksonville Port Authority. The project

included new docking, facilities, new dikes, (6) new cranes, new infrastructure,

new buildings and new underground / aboveground utilities. I prepared contract

documents and assisted in the preparing of the schedule, budget, writing

specifications, scopes of work and review of drawings.

September 2005 to June, 2006

Contracts / HR / Administration Manager, (FEMA Hurricane Katrina Project)

Fluor, Corp., Greenville, S.C.

HR/Administration Manager of FEMA work, for District #1 (St. Tammany), in Louisiana which included, St. Tammany, Tangipahoa and Washington Parrish’s. This work, included property assessment, scheduling, permitting, working with local, state and federal FEMA officials, setting up, Quality Assurance procedures, Instructing and assuring that the occupants understand how to operate all functions of the approximate 25,000 units of Travel Trailers and Mobile Homes.

December 2002 to June 2005,

MEP Contracts Manager (New Jacksonville Library and Library Parking Garage).

The Auchter Company, Jacksonville, Florida

MEP Contracts Manager, in charge, of all Mechanical, Plumbing, Electrical and Fire Protection Contracts for the New $130 Million, Jacksonville Library and $8 Million Library Parking Garage.

July 2001 to October 30,, 2002

Contracts Manager

Duke/Fluor Daniel, Greenville, S.C. Office

Contracts Manager for LG&E, SCR Projects, at (5) Power Plant Sites in Kentucky and South Carolina.

August 1998 to July 2001

Project/Contracts and Procurement Manager, Jacksonville, FL Fluor Daniel, (Jacksonville Electric Authority Alliance)

Project Manager on projects at Southside Generating Station and Mandarin Waste Water Treatment Plant. and Contracts / Procurement Manager at Northside Generating Station, for the Material Handling System.

January 1998 –August 1998

Manager of Systems Turnover and Coordination, Saudi Arabia

Fluor Daniel, Joint Venture, (Mobil Oil Co. & Saudi Yanbu Petrochemical Co.) Responsible for coordinating systems turnover of a multi-billion dollar expansion project at Yanbu, Saudi Arabia.

March 1996 – January 1998

Manager of Engineering and Quality Control, Rochester, NY

Fluor Daniel, Inc., Eastman Kodak

In charge of all on-site engineering and quality control for the $250 Million 307 Machine Project.

November 1995 – March 1996

Contacts / Procurement Manager, Norco, LA

Fluor Daniel, Inc., Transamerica Oil Corporation

Writing, Issuing and managing of the Contracts / Procurement, Conducting all pre-bid, pre-construction, and weekly contractors meetings.

November 1994 – November 1995

Construction Manager, Brunswick, GA

SCM Glidco (Fluor Daniel, Inc.).

In charge of $50 Million expansion to the existing chemical plant at Brunswick, Georgia.

June 1993 – October 1994

Manager of Engineering and Quality Control, Tabangao, Batangas City, Philippines

Fluor Daniel Pacific, Inc., Shell Oil Company

In charge of all on-site design, engineering, Q.C. inspection, surveying, documentation, reviews, liaison between construction and engineering, and start-up. This was an expansion project for Pilipinas Shell Refinery, to increase their production from 65,000 BPD to 110, 000 BPD. $850 Million Project.

August 1992 – May 1993

Manager of Engineering and Quality Control, Memphis, TN Fluor Constructors, Int'l, Inc., TVA, Allen Fossil Power Plant

In charge of all on-site engineering, quality control inspection, surveying, documentation, drawings and specifications, administering sub-contract coordination for the outage work.

August 1990 – July 1992

Manager of Engineering and Quality Control, Irian Jaya, Indonesia Fluor Daniel Int'l. Inc., Redwood City, Ca.

In charge of all on-site design, engineering, quality control inspection, surveying, documentation, reviews, liaison between construction and engineering, and start-up. This was a $1.2 Billion expansion project, for Freeport Indonesia to increase production to process 57,000 DMTPD of copper ore from 32,000 DMTPD, and

construction of a 200MW Power Plant. Additionally there was the construction of a 150 Bed, $200 Million Hospital, complete with (2) Operating Rooms, Emergency Room and Delivery Room.

August 1987 — July 1990

Construction Manager/Consultant, Georgia, Cuba, Florida

SCM Glidco (CM, Fluor Daniel, Inc.).

Expansion to existing chemical plant at Brunswick, Georgia. Aptco (Consultant)

Various projects at Guantanamo Naval Base, Guantanamo Bay, Cuba. Cuba Seminole Kraft Corporation (Consultant)

MEP Upgrading and modifications to existing paper mill.

June 1985 – July 1987

Senior Project Engineer, Jacksonville, FL

Jacksonville Electric Authority, St. Johns River Power Park

Construction of two-600MW, coal fired generating units and associated facilities (1.6 Billion project). Construction Management, including Monitoring of Contractor Administration Management of A/E Contract, Construction Claims Negotiator, Monitor Construction Progress/Start-up, of MEP Subcontractors, Developed a Training Program.

January 1983 – May 1985

Chief Field/Project Engineer and Subcontractor Field Coordinator, Salem, MA.

Fluor Engineers and Constructors Transferred to New England Power Project Oil to Coal Conversion. In charge of all Project Field Operations in the construction of the oil to coal conversion project, which included all on site design, engineering, quality control inspection, surveying, documentation, reviews, liaison between construction and engineering and sub-contractor activities.

April 1980 – December 1982

Chief Field/Project Engineer and Subcontractor Field Coordinator, Martinez, CA

Fluor Engineers and Contractors, Inc., Shell Oil Company

Chief Field/Project Engineer, for Area 14 Flexicoker Structure and Unit, (Associated Vessels), in charge of Field Engineering/Construction related to the Flexicoker Unit, Field Coordination of all Subcontractors and Field Engineers in relation to the Project, including Civil, Structural, MEP's , Instrumentation and Quality Control Inspection.



Contact this candidate