Scott Kelsey
San Diego CA *****
Education
MIT Boston MA
Boston State College BSME
Bunker Hill Community College Boston MA Collage
University Of Arizona
Palomar College San Marcos CA Electrical Associates
Mira Costa College Oceanside CA Business Management
Mira Mesa College Mira Mesa CA Business Management
UCSD Extension San Diego CA HVAC Design
UCSD Extension San Diego DDC control
UCSD Extension San Diego Environmental Law
Construction Quality Management NFVAC
OSHA 40 certification
Red Cross certified first responder
HAZWOPER 40
Affiliations
ISPE Board of Directors 1984-2000
IFMA Member 1996
BOMA Member 1987
AALAS Member 1989
Summary
•20 years of Facilities, Engineering / Automation Management, Process Engineering Commissioning, Pharmaceutical, Biotech, Military, Higher Education, Utility upgrade’s Energy Management Utility Monitoring.
Enigmadiagnostics
Facilities & EHS Manager
March 2010 – Present
Set up Facility and Engineering systems for startup Biotech Company.
HVAC set up for class 10,000 clean room. Certify installation of new HEPA filer system used in manufacturing diagnostic test kit. Set up HVAC system for new BSL-3 room. Track all facility utilities for cost saving programs and modifications. Install new CDA / Medical grade N2 air supply for manufacturing.
Kevcon Inc (Service Disabled Veteran Owned Small Business)
Project Superintendent
July 07 – March 2010
Manage construction projects for Multiple V.A hospital sites.
1.1 Million Galvanized Pipe Replacement West LA VA Hospital
2.1 Million HVAC upgrades Cooling Tower
1.3 Fume Hood replacements
2.3 Million HVAC Upgrade 6th floor research
7.2 Million 2nd Floor build out for Medical suites Dental, Eye, and Neurology
Work On MACC IDIQ contracts for Government contracts.
6.5 Million VA utilities monitoring system Vision 22 (West Cost VA) Air Comp. Gas, NG, Chilled water. Domestic / Industrial water.
University California San Diego
Senior Project Manager Biology
Jul 06 – Jan 07
Developing and clarifying design intent during the Design Phase for all mechanical systems for Natural Science Building Biology Lab
Engineer renovations for Morgue expansion, Medical Center Responsibility for planning and overseeing Commissioning BSL-3 Lab, and HVAC system for AAALAC International renewal 80,000sqft
NAVFAC SOUTH WEST ROICC (ITS)
Mechanical Engineer
Apr 06 – Jul 06
Write Mechanical specifications for various military projects, Developing Commissioning requirements for the Construction Documents ROICC move and expansion, HVAC modifications, and facility system upgrades.
Solar Turbines Incorporated (Volt Technical)
Mechanical Engineer
Aug 05 –Apr 06
Verifying installation, functional performance, training and documentation new filtration system, Upgrade high pressure natural gas from 250psi to 600psi. Worked on new gas compressor test facility for all system utilities.
US Filter Corp
Branch Manager,
March 03 - Sep 04
Duties are to oversee all aspects of Southern California Branch including management of building systems, maintain Branch budgeting, personnel functions, regulatory compliance, Process Development, Inventory, GMP, QSR compliance, Sales, and Installation. Recruited to stabilize budget, correct overhead burden, implement GMP service department, track expenses through matrix management, and return US-Filter to the leader in customer service satisfaction in the water industry.
Novartis Pharmaceutical
Facilities Manager,
Sep 99 - March 03
Project Manager for 100 million dollar campus construction. Completed start-up and commissioning of all capital and small equipment on campus Contracted with a combination of outsourced and in-house staff to manage facility. Budgeted and forecasted all facilities service contracts. Set up web based work order system including web based CAD system for master blueprint control. Project Manager for construction of 80,000 sq. ft. drug discovery facility.
Biostruct Inc.
Director of EH&S / Engineering Operations
Feb 96 - Sep 99
Duties were to direct and manage operations of a multi-discipline, high technology company. Consultant to San Diego Biotech industry.
Director of Facilities
Assumed responsibilities for company operations. Automated regeneration system used in ultra pure water system service. Engineered systems with Seven San Diego outsource companies to fill, and finish product. Develop IQ,OQ,PQ, and MQ.
Alliance Pharmaceutical Corp
Facilities EH&S Manager
Aug 90 - Feb1996
Managed construction of 55,000 sq. ft. facilities for Manufacturing, Research and Development GMP pharmaceutical company. Project Manager for construction of 27,000 sq. ft. facility including a 14,000 sq. ft. aseptic, FDA-approved manufacturing facility, WFI system, CIP system, SIP system, clean rooms, vivarium. Implemented Validation master plan, engineering systems to manufacture aseptic large parenterals, automation of process to fit budget. Set up Engineering Change Order process, set up Benchmarking program for all production systems. Provided all support for Factory Acceptance tests and progression checks of all capital equipment at vendor sites. Project manager for utility upgrade with zero down time for existing utility users. Assisted animal resources department in obtaining AAALAC International accreditation.