Post Job Free
Sign in

Project manager

Location:
United States
Posted:
January 30, 2012

Contact this candidate

Resume:

Professional Experience:

Company: RAK Pharmaceuticals Ltd.

Faridpur, Sreenagar, Gazipur, Bangladesh

Manufacturier Pharmaceuticals Products

Period of Employment: From August 2010 to Now

Position: Manager- Engineering

Major Responsibility:

• To ensure smooth running of all production and utility machinery.

• To supervise maintenance, calibration and machine qualification programs.

Company: Libra Infusions Ltd.

I/7 Mirpur Industrial Estate ( Rupnagar) Section 2, Dhaka 1216, Bangladesh

The first and largest Manufacturer of IV Fluid (Saline) in Bangladesh

Period of Employment: From February 2010 to July 2010

Position: Manager- Engineering

Major Responsibility:

• To supervise project for new SVP, LVP, solid dose manufacturing facilities.

• To ensure smooth operation of Extruder unit ( manufacturing of saline bag & its accessories and pet bottle)

• To ensure smooth running of all production and utility machinery.

• Organize and supervise continuous supply of utilities electrically, HVAC, Purified water, compressed air, steam.

Project: Project for new SVP & LVP, solid dose manufacturing facility:

Company: Radiant Pharmaceuticals Ltd.

Plot # B 46, BSCIC Tongi , Gazipur 1710, Bangladesh

A Pharmaceutical company manufacturing F. Hoffmann-La Roche Ltd. and its own products

Period of Employment: From September 2008 to December 2009

Position: Plant Engineer

Major Responsibility:

• To ensure smooth running of all production and utility machinery.

• To supervise, qualification and maintenance work.

• Organize and supervise continuous supply of utilities electrically, HVAC, Purified water, compressed air, steam.

• To ensure engineering service as per cGMP standard.

Project: Project for solid dose manufacturing facility : construction works, HVAC system, purified and portable water system, compressed air system, boiler & steam, production machinery like Rapid Mixer, Fluid Bed Dryer, Coating, Blender, Compression machine, Dryer, blister packing & dispensing booth installation & commissioning and qualification

Audit: Faced internal quality & Roche quality audit.

Company: Novartis Bangladesh Ltd.

Cherag Ali Market, Tongi I/A , Gazipur 1711, Bangladesh

A Mutlinational export oriented Pharmaceutical company, marketing Pharma product from its own EU certified production Plant at Tongi.

Period of Employment: From May 2005 to August 2008

Position: Manager Plant Maintenance

Major Responsibility:

• To ensure smooth running of all production and utility machinery.

• Organize and supervise continuous supply of utilities with a cost effective manner.

• Implement and supervise preventative maintenance scheme with updated records

• Supervise calibration & equipment qualification program

• Supervise and train the personnel of Technical Service Department

• Ensure GMP standards and implement audit recommendation

• Coordinate the purchase of any local and imported items with help from Supply Chain and Finance Department as per company policy

• Budgetary function with strategic planning

• Take part and work out technical documents for project

• Vendor enlistment according to company policy

Project: Lighting Protection System, Smoke Detection System, Blister packing machine & Fluid Bed Dryer transfer.

Audit: Faced EU GMP, MCC & ANVESA Audit in 2007 as well as internal audit.

Company: GlaxoSmithkline Bd. Ltd.

Fouzderhat I/A, Chittagong, Bangladesh

Multinational Pharmaceutical company manufacturing wide range pharma products.

Period of Employment: From April 1997 to May 2005

Position: Maintenance Manager

From April 2003 to May 2005

Major Responsibility:

• To ensure smooth running of all production and utility machinery.

• Organize and supervise continuous supply of utilities with a cost effective manner.

• Implement and supervise preventative maintenance scheme with updated records

• Supervise and train the personnel of Engineering Department

• Coordinate the purchase of any local and imported items with help from Procurement and Finance Department as per company policy

• Implement engineering projects

• Coordinate Health Safe Environment matters

Position: Senior Maintenance Engineer – Electrical

From January 1999 to April 2003

Major Responsibility:

• To ensure smooth running of all production and utility machinery.

• Organize and supervise continuous supply of electricity with a cost effective manner.

• Implement and supervise preventative maintenance program

• Implement new project

• Supervise procurement of spare parts and

Position: Maintenance Engineer – Electrical

From April 1997 to December 1998

Major Responsibility:

• Supervise and take part maintenance program

• Troubleshooting of machine

• Prepare purchase requisition for plant machinery

• Take part project works

• Look after factory PABX

Project: : Installation & Commission of Production Machine: Pure Steam Generator, Multi Column Distillation Plant, Blister Packing Machine, Tablet Compression Machine, Powder Filling Machine, DM Water Plant & its circulation Loop, 7000 Liter Liquid Preparation Vessel, Roll fill Labeling Machine, Steam Heated Sterilizer, Auto collating Machine, Ointment / Cream filling Machine , Auto cartooning Machine, Coating Machine & Closed Loop manufacturing system for ointment / cream.

Electrical Installation: HT (11kV) & LT (400V) Cable laying, 1000KVA, 150kVA, 50KVA, 40KVA generator installation, Auto & Manual change Over, DB box etc, Addressable Smoke Detector System & Fire Hydrant System

Audit: Faced internal quality & HSE audit.

Academic Qualification:

Executive MBA Finance

Institute: International Islamic University Chittagong, Chittagong, Bangladesh.

Result: CGPA 3.125 on scale of 4

Passing Year: 2005

B. Sc. Electrical & Electronic Engineering

Institute: Bangladesh University of Engineering & Technology, Dhaka, Bangladesh

Result: 1st Class

Passing Year 1996

Higher Secondary Certificate ( HSC)

Institute: Rajshahi College, Rajshahi, Bangladesh

Result: 1st Division

Passing Year: 1989

Secondary School Certificate ( SSC)

Institute: Rajshahi Collegiate School, Rajshahi, Bangladesh

Result: 1st Division

Passing Year: 1987

Professional Training:

December 17-23, 1996 Dhaka University

Sub.: Neural Network and introduction to DSP chips

April 18-23,1998 Training Institute for Chemical Industries, Ghorasal

Sub.: Electrical Equipment Installation, Operation and Maintenance.

June 7-8, 1998 Institute of Engineers, Bangladesh Dhaka

Sub.: Managing People

July 31 – August 3, 2000, Glaxo Wellcome Bd. Ltd., Chittagong Site

Sub.: Lean Sigma Advocate Training

August 17 - 18 , 2002, Metropolitan Chamber if Commerce and Industry, Dhaka

Sub.: How to Economize Energy Cost

January 13 – 14, 2004, Chittagong Stock Exchange, Chittagong

Sub: Problem Solving Procedure in TQM for Manufacturing & Service Industries

February 16- March 6, 2004, Godrej & Boyce Mfg. Co. Ltd., Mumbai, India

Sub: Electronics & Electrical Repairs

December 19- 23, 2005, Ministry of Manpower & Employment

Sub: Working environment , Health & Safety Development in Factory

November 21-23,2006, Novartis Bangladesh Limited, Dhaka

Sub: Situational Leadership

March 17-22, 2007, Novartis Bangladesh Limited , Dhaka

Sub: COMPASS, Management Development Program

February 11-12, 2009, TRACK Training International, Dhaka

Sub: New Manager

March 01-02, 2009 TRACK Training International, Dhaka

Sub: Team Building Workshop

Professional Membership:

Member, The Institution of Engineers, Bangladesh, Membership # M 15856

Computer Skill:

Operating System: Windows xp , NT, 9x

Application: MS Word, Excel, power point, outlook, Lotus Note, MS Project etc

Personal:

Father’s Name : Late Md. Zillur Rahman

Mother’s Name : Fazilatun Nessa

Place of Birth : Rajshahi

Marital Status: Married

Permanent address: Holding # 66, Seriol Motpukur ( Santibag) , Rajshahi - 6100, Bangladesh



Contact this candidate