Post Job Free
Sign in

Engineer Design

Location:
United States
Posted:
January 30, 2011

Contact this candidate

Resume:

ANGEL JAIRO VIVAS ESTEVES

Date of birth: **-**-**65.

Place of birth: Venezuela

USA Visa B1/B2 expires on 2016.

Home address: Rincon Club de Campo, lote 237, Neuquén city, Argetina.

Email address:**********@*****.***

Home Phone: +54-299-***-****

Cell Phone: +54-929*-***-****

Availability: 30 days after notice

EDUCATION

Jul 1991,Bachelor Degree in Mechanic Engineering, “Universidad Nacional Experimental Politécnica Antonio Jose de Sucre”, Caracas, Venezuela

WORK EXPERIENCE

Feb. 2006 until today - Repsol-YPF, Rincon de los Sauces oil field. Neuquén, Argentina Production Optimization Team leader

Assigned to Chihuido de la Sierra Negra Field, Progressive Cavity Pump, Beam Pump, and Electro-Submersible Pump design, troubleshooting and optimization, nodal analysis, gas wells completion design and production evaluation, water injection wells completion design and injection patter evaluation, CO2 and H2S corrosion evaluation and prevention, down hole completion design and new engineer trainer.

• Saved 1 MU$D on pulling activities, using Root-Cause Analysis on PCP, the results of Root-Cause analysis was a New Rotor-stator fit to Light oil.

• Developed a corrosion prevention down hole pump analysis, and increasing a rod pump run life from 250 to 370 days.

• Developed a inactive gas well analysis and Increased gas production from 3,5 to 10,5 Mcf using nodal analysis.

• Saved 1,9 MU$D on pulling activities, using Root-Cause Analysis on Beam pump.

Feb. 2004 – Feb2006. SMS S.A. Consulting Company, Maturin, Venezuela.

Senior Production Engineer

Assigned to Repsol-YPF in Quiriquire Field, field technical evaluation, field development plan, corrosion evaluation and prevention, sand control design, oil well production optimization, artificial lift equipment failure prevention.

• Participated as a production engineer at the Developed plan for Quiriquire Venezuelan field

• Participated as a production engineer at the study of Quiriquire gas wells corrosion prevention.

Jun. 2003 – Jan. 2004 SMS S.A. Consulting Company, Maturin, Venezuela.

Senior Production Engineer

Assigned to Harvest – Vincler, field technical evaluation and developed plan for Temblador field and field technical evaluation and developed plan for El Salto field.

• Participated as a production engineer at the Developed plan for El Salto and Temblador Venezuelan field.

Jul. 2000 – Dec. 2.003-PDVSA E&P, Easter of Venezuela

Production Optimization Team leader

In charge of 9 production engineer Artificial lift design, troubleshooting and optimization, new artificial lift technology test and budget, nodal analysis, corrosion evaluation and prevention and down hole completion design, field technical evaluation and field developed plan.

• Headed an Integral Methodology of Productivity team work and made a production increasing plan from Morichal 1 reservoir.

• Headed implementation of Integral Methodology of Productivity on Morichal Field.

Dec. 1998 – Jun. 2000-Department of Energy, Casper, WY, USA-Project Engineer

Assigned to Department of Energy, Casper, WY, USA. Work over, artificial lift design, troubleshooting and optimization, new artificial lift technology test, abandoned shallow wells.

• Increase ESP oil production well from tensleep formation using Nodal Analysis.

• Abandoned 40 wells from Shannon formation.

• Field light oil elastomer test on Shannon wells.

Dec. 1995 – Nov. 1998-PDVSA E&P, Easter of Venezuela-Production Engineer

Artificial lift design, troubleshooting and optimization, new artificial lift technology test, nodal analysis, corrosion evaluation and prevention, field technical evaluation and developed plan.

• Reduction of Beam Pump failures in 30% and saved 4 MU$D using Root-Cause analysis.

• Increase 20% (2000 bls/day) oil production from Gas lift well using the Nodal analysis programs (well flow).

• Increase from 200 days to 540 PCP run life using Root – Cause analysis, working with manufacture company improving a production process.

Nov. 1993 – Nov. 1995 – PDVSA E&P, Easter of Venezuela Work over Engineer

Work over design, down hole completion design for Horizontal, vertical and deviated well, sand control.

• Completion design and installation the firth re-liner in Horizontal Wells on Venezuelan Fields.

• Down hole completion design and installed over 50 horizontal reentries and horizontal wells.

• Developed a sand control study for Morichal Venezuelan field and change gravel size for gravel pack work.

Mar. 1991 – Oct. 1993 PDVSA E&P, Easter of Venezuela Production Engineer

Artificial lift design, troubleshooting and optimization, new artificial lift technology test, nodal analysis, corrosion evaluation and prevention.

conference and publications

• Completion design, and beam pump design over 200 new Beam pump wells

• Completion design, installation and over 100 PCP in Orinoco Belt.

• Completion design and installation the new steam injection completion to beam pump.

LANGUAGE SKILLS

Native Language: Spanish

Second Language: English .Speaking, Reading and Writing fluently.

COMPUTER SKILLS

• PIPESIM, WELLFLOW, PROSPER, GAP, OFM (Oil Field Manager), PCPUMPS, RODSTARS, XDIAG, SROD, SUBPUMP and MS Access.

CAREER PROFILE

Production Engineer with 19 years of experience Oil and Gas Production. Experience as technical team leader developed down hole-surface projects, sand control design, down hole completion design, Artificial lift design, analysis and troubleshooting, nodal analysis and onshore oil production operation.

• Highly qualified engineer for field technical evaluation and development plan.

• Well CO2 and H2S corrosion prevention expertise.

• Highly expertise on nodal analysis.

• Highly expertise on Progressive Cavity Pump, Beam Pump and Electro-Submersible Pump.

• Highly expertise on down hole-surface production optimization.

• Highly expertise on down hole completion of oil production, gas production and water injection.

TECHNICAL HIGHLIGHTS AND ACCOMPLISHMENTS

• Integration of productivity solutions for Oil & Gas Business (Well optimization, surface facilities design and pipeline transportation).

• Coordination of upstream operations and optimization of processes focused on maximizing asset production capacity and productivity.

CONFERENCE AND PUBLICATIONS

“Cause – Root Analysis for Beam pump Well in Chihuido Fields”. This paper was prepared for presentation at Centenario Congress, Salta, Argentina year May-2010

“PCP in light Oil”. This paper was prepared for presentation at ATW Artificial Lift, Mendoza, Argentina year 2008.

“Chihuido field gas wells reactivation proposes”, this paper was prepared for Repsol-YPF, year 2007.

“Quiriquire Shallow field, Rod Pump exchange materials specifications proposes” this paper was prepared for Repsol-YPF, year 2006

“Actual situation about Quiriquire Shallow Field sand production” this paper was prepared for Repsol-YPF, year 2005.

“Production engineer report as a part of the Quiriquire Shallow field developed plan”, this paper was prepared for Repsol-YPF, year 2004.

“Production engineer report as a part of the Temblador and the Salto fields developed plan” this paper was prepared for Benton-Vincler year 2003.

“South Monagas fields Production down Analysis”, this paper was prepared for PDVSA year 2000.

“Productivity improve for Morichal 01 reservoir by Productivity Improve Methodology”, this paper was prepared for PDVSA year 2000.

“Venezuela PCP Best practices”, this paper was prepared as a coauthor for PDVSA.

“Steam injection and production combine completion for Beam Pump wells”, this paper was prepared for the X Petroleum Colombian congress year 1997.

“High GOR Heavy oil horizontal wells Productivity Improve”, this paper was prepared for PDVSA year 1996.

“Morichal field PCP evaluation” this paper was prepared for the X Artificial lift PDVSA Congress year 1995

“Morichal field Pulling factor improves”, this paper was prepared for PDVSA year 1995.



Contact this candidate