Post Job Free
Sign in

Senior Preconstruction Estimator

Location:
United States
Posted:
September 12, 2012

Contact this candidate

Resume:

Bryan K. Baswell

**** ***** **. *********, ** ***20

305-***-**** / Email: *********@*****.***

PERSONAL ASSESSMENT

I am a results driven self starter who works with little to no supervision. I possess the knowledge and experience to not only estimate to confirm sub pricing, but to self perform in all areas of civil construction.

SUMMARY OF QUALIFICATIONS

• Twenty years experience estimating construction in all sixteen divisions specializing in division two.

• Advanced abilities estimating from conceptual drawings with few or no specifications.

• High proficiency in writing scopes of work to solidify sub-contracts.

• Experienced in writing and negotiating sub-contracts to maximize job profit.

• Competent to write complete specifications for design build projects where no specifications exist.

• Exceptional oral and written communication skills.

• L.E.E.D. Accredited Professional.

• Instrumental in implementing and training on estimating software for my previous employers

COMPUTER SKILLS

Microsoft Word, Excel and PowerPoint; Timberline Estimating; MC2 Estimating; OST (On Screen Take-Off); InSite Sitework; and HCSS Heavy Bid software.

WORK HISTORY

Aug/2010- Present Conalvias USA, LLC (Ft. Lauderdale)

Director of Preconstruction

• Responsible for building relationships with clients and subcontractors, monitoring the estimating process, verifying the estimate for completeness and accuracy, generating general conditions figures and assembling final bid submission.

June/2008- June/2010 Facchina Construction, LLC (Ft. Lauderdale)

Senior/Lead Estimator

• Led a team of 5 estimators in estimating projects ranging from five to one hundred million dollars in contract value. Led plan review meetings, wrote master scope sheets, reviewed individual estimator scope sheets, and assisted the director in assembling the bid.

Jan/2007 – June/2008 Skanska USA Building, Inc. (Dania Beach, FL)

Senior Estimator

• Assessed project plans, wrote scope sheets, solicited bids from sub contractors, assessed sub bids, estimated assigned work divisions for sub quote comparison and wrote scopes of work for subcontracts.

2005 – 2007 First Response Roofing Inc. (Hallandale, FL)

Hired to help Roofing Company open a General Contracting Division

• Responsible for Estimating, IT and Insurance

2002 – 2005 Potter Construction Company (Charlotte, NC)

Chief Estimator – Commercial Projects

• Responsible for all estimating functions as well as some project management when needed.

2000 – 2002 S. C. Hondros & Associates (Charlotte, NC)

Staff Estimator – Design Build Projects

1992 – 1999 MCT General Contractors (Monroe, NC)

Office Manager / Estimating Assistant

• Assisted Estimators in take offs and bid analysis

EDUCATION

Central Piedmont College (Charlotte, NC)

AA: Marketing – 1985

Partial Project List

FDOT

T1402 (SR 35/700 in Polk Co. FL) $4,700,000.00

Project consists of one mile of road widening, lane additions, striping, signalization, drainage improvement, utilities and earthwork.

T1454 (SR 93 in Collier Co. FL) $5,500,000.00

Project consists of constructing a public recreational access facility that includes a boat ramp, parking lot with fencing and lighting, widening one mile of I75, resurfacing, drainage improvements, signing, signalization, storm drainage and five acres of heavy embankment.

T7292 (SR 688 in Pinellas Co. FL) $21,000,000

Project consists of reconstruction of a two lane state highway, adding lanes, Intelligent Traffic Systems, earthwork, drainage, lake construction, striping signage and lighting.

Miami-Dade Co. Public Schools

Miami Central Senior High School

Project consists of 214,000sf of new classroom/administrative construction. Site work included new electrical, sanitary, water and chilled water infrastructure to support new classroom/administrative space and new chiller.

City of Miami Beach (Miami, FL)

New World Symphony Concert Hall

Project consisted of $100 million, 75,000 SF concert hall designed by Frank Ghery.

Site work involved demolition of 58000 SF of existing prestressed concrete structure, new FPL duct bank, new force main piping and lift station, storm and foundation drainage.

EDI Development Corp. (Ft. Lauderdale)

Eclipse Apartments/Condominiums

Project consisted of 695,872sf of new condominium construction.

Site work included vibro-floatation foundations, deep injection wells, force main sanitary sewer, potable water and fire mains.

Florida International University (Miami, FL)

College of Nursing and Health Sciences

Project consisted of the construction of a 101,000sf multi-story educational facility to accommodate the College of Nursing and Health Science programs.

Site improvements included auger cast pile foundation, FPL duct bank and vault, phased utilities to integrate with existing systems without interruption of service.

Additional Completed Projects Supplied On Request.



Contact this candidate