Address * ********, ***** ****** ****** Number: 966*********
Address * *-***,******#**,North,Karachi,
Pakistan. E-mail Address:***.*******@*****.***
Ziauddin Muhammad
Objective: Strong determination to work as Resident Engineer, Project Manager, Bridge Manager etc.
Key skills: -Supervision of infrastructures (Highway & bridges, Power station, sewage treatment plant, pumping station, Industrial and multistoried buildings projects).
-Piling and Pre-stressing.
-Excellent communication and writing skill for all site/office related matters.
-Effective managing, planning, scheduling and updates.
-Quality Assurance/ Quality control/Field Engineering.
-Dealing with junior staff, contractor’s Engineers and sub-contractors.
-Estimating & costing/IPC verification.
-Surveying skill.
-Complete familiarity with construction materials and its quality tests.
Core education Bachelor of Engineering in Civil discipline with first class from NED - University of Engineering and Technology, Karachi, Pakistan in 1981.
Computer skill: Proficient in MS Office (Words & Excel), Auto-cad, MS Project.
Professional
Affiliation: -Professional Life Membership of Pakistan Engineering Council
-Member of Saudi Council of Engineers.
Professional 28 years.
Experience:
Experience Job function classification
Classification: Consultants 18 years
Contractor 10 years
Specialty: Acquired a sound knowledge and experience for supervising deep foundations (Pile foundations).The various methods experienced for bored cast-in-situ piles are Percussion method with chisel or bailer as per strata involved, straight rotary, reverse rotary etc. Bits of diamond also used for hard rock drilling. I have been involved in the supervision of confirmatory borings for soil investigation in lieu to confirm length of the piles. Disturbed, undisturbed samples-
Cont’d p/2
(2)
collected and SPT carried out to conduct tests on soil samples eg Sieve analysis, Atterberg limits, Direct shear, Tri-axial shear and Unconfined compression tests to determine important parameters of soil such as cohesion & angle of internal friction for calculation of soil bearing capacity. Reviewed the soil reports to correctly implement the results to the soil foundations for its strata confirmation while execution.
Extensive experience achieved for supervision of Post -Tensioned girders. The various systems experienced are Freyssinet, Strong Hold and Dywidag System International (DSI).Got complete familiarity for all calculation for Cable elongation and for Losses occur in cable stressing. Reviewed- the system and approval procedure completed for the system proposed by the contractor. All necessary supervision done during cable tensioning of girders and decisions taken for the acceptance of the results at the spot and if necessary de-stressing & re-stressing done or reviewed for a solution of disputed results if there is.
Present status:
Presently involved in construction supervision of a Six-lane carriage way(3-lane on either side) from Al-Haw tat to Hair (Riyadh having a total length of 106 Km as a Bridge Engineer since June 2006. The project comprises of seven bridges having six to thirty spans (span lengths 7, 20, 25&35LM).All the bridges have pile foundations and Pre-cast Post-tensioned girders. So far three bridges have been completed. A total of 750 girders have been cast, stressed, grouted and launched. Quality works have been achieved for all the executed works. Duties performed are:
-Study the proposed site and verify finer details before execution.
-Monitoring contractor’s operation, construction planning and scheduling.
-Inspection & checking as per request submitted by contractor.
-Confirmation that the materials used are as per standard set in the contract
And their storage/stacking are as per specification.
-Review contractor’s submittals (eg, works method statements, proposed plan).Make comments on it and necessary recommendations for final approval.
-Checking and corrections for steel bar-bending schedules and shop drawings as submitted by the contractor.
-Necessary correspondence and site notes on the site works in progress to the contractor through Resident Engineer.
Cont’d p/3
(3)
-Perform quantity calculation for various phases of construction for progress pay estimates and keep important records.
-Assure quality and progress.
-Maintained concrete pre-pour c heck list, post pour report and prepare safety reports for work in progress.
-Weekly and monthly reports for works completed/in progress.
-Review concrete mix design for necessary correction.
Past Experience:
April 2005 to May
2006 Worked with M/s Engineering Consultant International (Pvt.) as Assistant Resident Engineer(ARE) Structures at its Project of Development of M.A Jinnah Road(From Jinnah Bridge to Kemari-intersection.) which comprises of 3.0 Km dual carriageway(Four lane each side),construction of an Overpass bridge (15-spans),Storm Water-Drains, New Jersey Median Barriers and other allied works. The duties involved were same as stated above.
August 2004 to
March 2005 Worked with M/s ECIL as Structural Engineer(supervision)at its project of Islamabad- Peshawar Motorway (M-1) having a length of 54 Km. The Mega Project was a 6-lane Dual carriageway having six Bridges, Two Flyovers,230 box Culverts, Drainage Erosion and Ancillary works etc. The duties performed were same as stated for present status.
April 2002 to June Worked with M/s ECIL as ARE (structures) at its project
2004 of Makran Coastal Highway Gawader- Pasni section having a length of 88
from its beginning till completion of the Project .The project was consisted of 09 No Bridges, 334 No Box - culverts, protection, ancillary Works etc.The duties involved were same as stated for present status.
August 2000 to
February 2002:
Worked with M/s Abdul Sattar &Co. on its following projects as Project -Engineer:
-Housing Complex for Pak-Arab Refinery at Muzaffargarh.
-Earth work at Port Qasim Karachi.
-Earth work and Maintenance Workshop at Shikarpur PS-3. DUTIES/RESPONSIBILITIES:
-Managing, Planning, Supervision and quality control of the
project.
-Preparation of construction, manpower and materials- schedules
and its updating as per requirement of the project.
-All matter related to budgeting and costing of the project.
-Necessary correspondence with clients and consultants.
-Monthly progress Reports.
-Reconciliation of the project.
Cont’d. p/4
(4)
July1999 to April 2000
Worked with M/s Engineering consultant International (Pvt.) Ltd. as Structural Engineer(Supervision) at its project of “ Additional Carriage Carriageway from Ubauro to Rahimyar - Khan” having a length of 82Km.The works were consisted of all structural Works - eg, Bridges, Box & Pipe culverts, erosion and drainage etc. Duties carried out were the same as stated in the present status.
October 1996 to April
1998
Worked with Loya Associates (Pvt) Ltd as Structural - Engineer at its project of University Road Overhead Bridge having 30 spans- and a total length of 827 meters. Duties/Responsibilities performed were same as stated for present status.
July1993 to October
1996
With Engineering Consultants Pvt Ltd as structural Engineer on Its project of Indus Highway Contract-6.All bridges (6No) were consisted of Pile foundations and Pre-Cast post tensioned girders. The duties performed were the same as stated in the present status. In addition to this about 100 Box and Pipe culverts were supervised
July 1991 to March
1993 With Engineering Consulting House Riyadh (Saudia) at its
Project of Sewage treatment works Tabuk as Civil Engineer.
August 1990 to June
1991 With M/s Nawab Brothers (Pvt) Ltd as Project Engineer at
Its Project of State Bank office Building Complex and auditorium
Multan which was a ground plus eight storied building .
June 1989 to March
1990 With M/s Polad Construction Company (Pvt) Ltd at its project
Mama Parsi School extension at M.A. Jinnah Road,Karachi.
The duties involved were Planning, supervision and
Quality-control.
January1987 to April
1989 Worked with M/s Sardar Ashraf Baluch (Pvt) Ltd. on its project
Of Roads & bridges located at Korangi. The duties were the
same as stated for present status.
Cont’d p/5
(5)
December 1981
to October
1986 With M/s Macdonald Layton & Co.(Pvt) Ltd. Karachi as
Assistant Engineer for five years (last position held-
Was senior Assistant Engineer) and have got experience on
It’s following industrial pro
-Grid station KDA scheme No.33.
-Pipri Thermal Power project unit 1&2.
-Rahim Buksh Textile Mills at D.G Khan.
-Pangrio Sugar Mills.
Following duties were performed:
-Planning &supervision of execution
-Preparation of steel bar-bending schedules.
-Preparation of Material requirement chart
- Preparation of weekly & monthly progress reports.
Affiliation with contract deptt.
-All matters related to contract department.
Address 1 Alkharaj, Saudi Arabia Mobile Number: 966*********
Address 2 R-645,sector#10,North,Karachi,
Pakistan. E-mail Address:***.*******@*****.***
Ziauddin Muhammad
Objective: Strong determination to work as Resident Engineer, Project Manager, Bridge Manager etc.
Key skills: -Supervision of infrastructures (Highway & bridges, Power station, sewage treatment plant, pumping station, Industrial and multistoried buildings projects).
-Piling and Pre-stressing.
-Excellent communication and writing skill for all site/office related matters.
-Effective managing, planning, scheduling and updates.
-Quality Assurance/ Quality control/Field Engineering.
-Dealing with junior staff, contractor’s Engineers and sub-contractors.
-Estimating & costing/IPC verification.
-Surveying skill.
-Complete familiarity with construction materials and its quality tests.
Core education Bachelor of Engineering in Civil discipline with first class from NED - University of Engineering and Technology, Karachi, Pakistan in 1981.
Computer skill: Proficient in MS Office (Words & Excel), Auto-cad, MS Project.
Professional
Affiliation: -Professional Life Membership of Pakistan Engineering Council
-Member of Saudi Council of Engineers.
Professional 28 years.
Experience:
Experience Job function classification
Classification: Consultants 18 years
Contractor 10 years
Specialty: Acquired a sound knowledge and experience for supervising deep foundations (Pile foundations).The various methods experienced for bored cast-in-situ piles are Percussion method with chisel or bailer as per strata involved, straight rotary, reverse rotary etc. Bits of diamond also used for hard rock drilling. I have been involved in the supervision of confirmatory borings for soil investigation in lieu to confirm length of the piles. Disturbed, undisturbed samples-
Cont’d p/2
(2)
collected and SPT carried out to conduct tests on soil samples eg Sieve analysis, Atterberg limits, Direct shear, Tri-axial shear and Unconfined compression tests to determine important parameters of soil such as cohesion & angle of internal friction for calculation of soil bearing capacity. Reviewed the soil reports to correctly implement the results to the soil foundations for its strata confirmation while execution.
Extensive experience achieved for supervision of Post -Tensioned girders. The various systems experienced are Freyssinet, Strong Hold and Dywidag System International (DSI).Got complete familiarity for all calculation for Cable elongation and for Losses occur in cable stressing. Reviewed- the system and approval procedure completed for the system proposed by the contractor. All necessary supervision done during cable tensioning of girders and decisions taken for the acceptance of the results at the spot and if necessary de-stressing & re-stressing done or reviewed for a solution of disputed results if there is.
Present status:
Presently involved in construction supervision of a Six-lane carriage way(3-lane on either side) from Al-Haw tat to Hair (Riyadh having a total length of 106 Km as a Bridge Engineer since June 2006. The project comprises of seven bridges having six to thirty spans (span lengths 7, 20, 25&35LM).All the bridges have pile foundations and Pre-cast Post-tensioned girders. So far three bridges have been completed. A total of 750 girders have been cast, stressed, grouted and launched. Quality works have been achieved for all the executed works. Duties performed are:
-Study the proposed site and verify finer details before execution.
-Monitoring contractor’s operation, construction planning and scheduling.
-Inspection & checking as per request submitted by contractor.
-Confirmation that the materials used are as per standard set in the contract
And their storage/stacking are as per specification.
-Review contractor’s submittals (eg, works method statements, proposed plan).Make comments on it and necessary recommendations for final approval.
-Checking and corrections for steel bar-bending schedules and shop drawings as submitted by the contractor.
-Necessary correspondence and site notes on the site works in progress to the contractor through Resident Engineer.
Cont’d p/3
(3)
-Perform quantity calculation for various phases of construction for progress pay estimates and keep important records.
-Assure quality and progress.
-Maintained concrete pre-pour c heck list, post pour report and prepare safety reports for work in progress.
-Weekly and monthly reports for works completed/in progress.
-Review concrete mix design for necessary correction.
Past Experience:
April 2005 to May
2006 Worked with M/s Engineering Consultant International (Pvt.) as Assistant Resident Engineer(ARE) Structures at its Project of Development of M.A Jinnah Road(From Jinnah Bridge to Kemari-intersection.) which comprises of 3.0 Km dual carriageway(Four lane each side),construction of an Overpass bridge (15-spans),Storm Water-Drains, New Jersey Median Barriers and other allied works. The duties involved were same as stated above.
August 2004 to
March 2005 Worked with M/s ECIL as Structural Engineer(supervision)at its project of Islamabad- Peshawar Motorway (M-1) having a length of 54 Km. The Mega Project was a 6-lane Dual carriageway having six Bridges, Two Flyovers,230 box Culverts, Drainage Erosion and Ancillary works etc. The duties performed were same as stated for present status.
April 2002 to June Worked with M/s ECIL as ARE (structures) at its project
2004 of Makran Coastal Highway Gawader- Pasni section having a length of 88
from its beginning till completion of the Project .The project was consisted of 09 No Bridges, 334 No Box - culverts, protection, ancillary Works etc.The duties involved were same as stated for present status.
August 2000 to
February 2002:
Worked with M/s Abdul Sattar &Co. on its following projects as Project -Engineer:
-Housing Complex for Pak-Arab Refinery at Muzaffargarh.
-Earth work at Port Qasim Karachi.
-Earth work and Maintenance Workshop at Shikarpur PS-3. DUTIES/RESPONSIBILITIES:
-Managing, Planning, Supervision and quality control of the
project.
-Preparation of construction, manpower and materials- schedules
and its updating as per requirement of the project.
-All matter related to budgeting and costing of the project.
-Necessary correspondence with clients and consultants.
-Monthly progress Reports.
-Reconciliation of the project.
Cont’d. p/4
(4)
July1999 to April 2000
Worked with M/s Engineering consultant International (Pvt.) Ltd. as Structural Engineer(Supervision) at its project of “ Additional Carriage Carriageway from Ubauro to Rahimyar - Khan” having a length of 82Km.The works were consisted of all structural Works - eg, Bridges, Box & Pipe culverts, erosion and drainage etc. Duties carried out were the same as stated in the present status.
October 1996 to April
1998
Worked with Loya Associates (Pvt) Ltd as Structural - Engineer at its project of University Road Overhead Bridge having 30 spans- and a total length of 827 meters. Duties/Responsibilities performed were same as stated for present status.
July1993 to October
1996
With Engineering Consultants Pvt Ltd as structural Engineer on Its project of Indus Highway Contract-6.All bridges (6No) were consisted of Pile foundations and Pre-Cast post tensioned girders. The duties performed were the same as stated in the present status. In addition to this about 100 Box and Pipe culverts were supervised
July 1991 to March
1993 With Engineering Consulting House Riyadh (Saudia) at its
Project of Sewage treatment works Tabuk as Civil Engineer.
August 1990 to June
1991 With M/s Nawab Brothers (Pvt) Ltd as Project Engineer at
Its Project of State Bank office Building Complex and auditorium
Multan which was a ground plus eight storied building .
June 1989 to March
1990 With M/s Polad Construction Company (Pvt) Ltd at its project
Mama Parsi School extension at M.A. Jinnah Road,Karachi.
The duties involved were Planning, supervision and
Quality-control.
January1987 to April
1989 Worked with M/s Sardar Ashraf Baluch (Pvt) Ltd. on its project
Of Roads & bridges located at Korangi. The duties were the
same as stated for present status.
Cont’d p/5
(5)
December 1981
to October
1986 With M/s Macdonald Layton & Co.(Pvt) Ltd. Karachi as
Assistant Engineer for five years (last position held-
Was senior Assistant Engineer) and have got experience on
It’s following industrial pro
-Grid station KDA scheme No.33.
-Pipri Thermal Power project unit 1&2.
-Rahim Buksh Textile Mills at D.G Khan.
-Pangrio Sugar Mills.
Following duties were performed:
-Planning &supervision of execution
-Preparation of steel bar-bending schedules.
-Preparation of Material requirement chart
- Preparation of weekly & monthly progress reports.
Affiliation with contract deptt.
-All matters related to contract department.