Post Job Free
Sign in

Senior Cost Engineer / Estimator

Location:
United States
Posted:
May 15, 2011

Contact this candidate

Resume:

CURRICULUM VITAE

OLIVER CLEGHORN ICIOB MCInstCES

SENIOR COST ENGINEER / ESTIMATOR

CB6 2JW

Cambridge

UK

Tel/ Cell : +44 (0-789*-***-*** (UK)

+974-****-**** (Qatar)

Email: *********@*******.***

Contents :

Personal Profile page 1

Project /Contract detail experience 1

List of previous employers 4

Key Skills 5

Other general skills 6

Pre-professional experience 6

Education 6

Personal Details 7

PERSONAL PROFILE

I have demonstrated an experienced commercial & operations management function with solid foundation in traditional quantity surveying and cost controls through a variety of procurement routes including traditional and design/build. I can offer a wide variety of contract and project management experience, including contract administration, a high level of commercial awareness, discretion, including operational change management controls as part of a mega-build project structure, or as a stand-alone system on more conventional projects. I believe building the right team is tantamount to successful project execution, and I expect the highest order of resource from those around me. I have a background in business unit management and strategic implementation of commercial and procurement procedures, including bid finalization and tender qualifications. Awareness of current UK health and safety legislation whilst pursuing a viable financial outcome to the project is a paramount driver, based on robust cost control and strict contract administration whilst allowing flexibility when common sense dictates. I particularly enjoy commercial & project management and contract administration, take off work, final cost forecasting and value management, procurement which I apply with a hands on and results driven attitude. I have also experience management of staff including construction side and commercial disciplines. Construction economics is of great interest to me and I enjoy applying this to the construction industry, to gain value from the degree I completed in Economics in 1999, which was then followed by QS degree. A full list of specific and general skills and experiences are shown below.

I aim to add significant value to my assignments and create an accountable and robust structure to the projects I manage, focusing on the traditionally important aspects of design integrity, program and budget.

Note : Also set up to work freelance (Ltd Company, VAT registered, Established 4 years) or Perm.

PROFESSIONAL MEMBERSHIPS

CHARTERED INSTITUTE OF CIVIL ENGINEERING SURVEYORS

CHARTERED INSTITUTE OF BUILDING

PROJECT / CONTRACT DETAIL EXPERIENCE

Nov 2010 to present

Rider Levett Bucknall, Senior QS and Senior Cost Engineer / Manager

Working with Turner International on the Heart of Doha, Qatar which is a US$ 6 Billion urban regeneration in the centre of the historic area. Monitoring & administering consultant packages in excess of USD 30 million, assessing claims and overseeing consultant contract development and execution (FIDIC White Book ). Performing a contract manager role on developing contracts, bid conditions and administration of the contract, and assessing claims thereto. The scheme, being mixed use, consists of retail, residential, commercial, hotel cultural and community construction projects, covering an area of 35 Hectares. RLB have been appointed master cost planner for the main project and construction supervisor for the phase 1 construction works which include infrastructure carried out under the FIDIC contract form. Duties on this project include the processing of change orders, assessment of compensation events and contract administration covering main contractors and subcontractors. Site based Qatar, office based in London

MASDAR city (UAE) infrastructure cost planning and procurement for this $4 billion eco-city plan. Development of the phased master cost plan and detailed cost plan for phase 1a for Foster and Partners architects in conjunction with Mott MacDonald engineers. Office based in Dubai, Abu Dhabi and London. Work packages involved HV, MV, LV networks, Distribution Management Systems, Photovoltaic Electric and other renewable energy sources including Geothermal. District Cooling, Treated Waste, Telecommunications Networks, Vacuum Waste Systems and Sewerage and Wastewater Engineering, Rail, Metro and Rapid Transport Infrastructure and Utilities costing, design evaluation and cost feasibility studies.

Buccement Bay, St Vincent Grenadines (Caribbean) - Senior QS and cost manager for the global private practice, based in St Vincent & London. Projects involved have been carrying out a due dilligence study on behalf of the bank for a prestigious $100 million resort development in St Vincent including master plan budgeting, cost and cash forecasts, and project deliverables checklists, analysis of contract and program and client recommendation on staffing and resource.

Aug 2010 - Nov 2010

Freelance assignment for Speymill Contracts Ltd, carrying out estimating, tendering and budget preparation for various projects in the retail and leisure industry, clients Whitbread, LIDL, Travelodge and Premier Inn. Values up to £6 million including tender submission and design appointment review.

July 2010 to August

Paternity Leave

April 2010 to July 2010

Corbyn Construction Ltd. Contract management , valuations and cost control for concrete frame subcontractor based in East London. Measurement of frames, groundwork, pricing and submission of variations and liaison with main contractors or clients as required. Reporting to Director .

Feb 2009 to April 2010

Senior Cost Engineer for SKANSKA Civil Engineering, £60 million civil engineering structures on Olympic Park

Skanska had a contract to build structures, bridges and highways including deep drainage and marine civils. Contract is NEC Option C. Duties involve estimating, loss and expense claim preparation for compensation events, procurement, analysis of tenders, budgeting and cost forecasting & quote preparation for Skanksa, liasing with and design coordination of consultants, Contract administration of variation control procedures. Client facing skills particularly with the involvement of the Olympic Delivery Authority, who are involved at all levels. Particular projects have included £750,000 target cost of concrete underpass, £1+ million new bridge widening over A12 highway, including take off and unit rate pricing, detailed measurement and submittal of target costs for £3,500,000 site wide deep drainage scheme. Works have also involved design and cost feasibility studies and re-pricing on +£5 million underpass utilizing jacked box installation procedure including contractor design. Identification and production of compensation event notices, early warnings, submittal of target costs in close liaison with Project and Commercial Manager & Client.

Sept 2007 – Nov 2008

Work on new build 19 apart-hotel in Cambridge, value circa £4,500,000 for private client. Concrete frame structure on CFA piles, Metsec cladding with zinc architectural façade and glazed penthouses. Works were of a very high standard with a high level of IT, mechanical / electrical and multimedia installations all fully integrated into the buildings. JCT DB200. Tendering and award of subcontracts, measurement & valuation, cost reporting and final account negotiation, estimating and cash flow forecasting, procurement scheduling and execution. Regular client facing skills required – they were private property developers who understood the construction process and liked to get involved. This project achieved zero dayworks through strict subcontract management techniques and a strong team. Certain amount of project / site management also undertaken due to staff shortages.

May 2007 – August 2007

Site based freelance QS (via Hill McGlynn), client Geoffrey Osborne Ltd contracted by London Borough of Redbridge. Target cost (Option E) NEC external works package, estimating, preparation of tender documents and bid analysis, subcontract orders, final account negotiation. Works include 3000m2 tarmac areas with all associated groundworks, drainage, paving, tarmac, fencing etc. External works value £750,000. Delivery of time critical project due to impending start of school year. Project returned over 15% gross margin on external works.

(Johnston International Limited, Belize, Central America)

August 2005 – April 2007

Las Terrazas, Belize – New Build 39 Condominium & hotel resort facilities on an island which posed significant logistical challenges, complete with driven piling, precast flooring system and brickwork frame, M&E, extensive internal joinery, external and infrastructure works involving public utilities. Duties covered liason with client and their reps, and design team appointment. Contract value 12 million US Dollars, form of contract AIA (American Institute of Architects). This type of contract is similar to a JCT Private Without Quantities. Variation to the standard QS function included value engineering & estimating phase II of the works and budgeting for client property sales, alongside buying materials and preparing tender documents through to award of subcontracts. This project started off with a tight tender, but returned a 6% margin due to effective change management. Management of a junior QS was also undertaken as a training role for him to progress elsewhere in the company.

Also worked as project QS on a US 3.5 million dollar Callender Hamilton cantilever steel bridge including piled abutments, steel frame construction, earthworks and roadways including deep drainage. Detailed measurement and cost forecasting undertaken here.

May 2004 – May 2006

Project QS for a variety of Government funded projects including land reclamation and bridge construction

TVET Stann Creek, educational training facility, value USD 3 million, final bid submission through site establishment to handover. Main works included site reduced levels, strip and pad foundations with ground beams and concrete frame buildings, with blockwork, plastering, M&E, steel or concrete roofs. 2nr steel frame buildings. Infrastructure works and access roads, car parks incl deep drainage. Total building size approx 30,000 sq ft .Some variants to the standard QS role were the preparation of project finance plans for the Government of Belize and the formulation and implementation of specifically designed contract forms.

TVET Cayo, edu. Training facility, value USD 2 million, works similar to above.

Marine Parade Boulevard, value USD 12 million. Works included filling of 350,000 cubic yard burm with dredged material, forming in-situ sea defence around site and construction of loop road around area for future development. Works included demolition of hospital and new deep drainage.

Various other tenders, estimates and smaller works also completed during 3 yrs.

Tracto Belize Ltd. Dredging company owned by Johnston which turned over around USD 1.5 million p.a. and had 2nr cutter suction dredges, 2nr tug boats / tender boats, CAT 320B c/w spud barge, various other floating plant. Company specialized in the formation of offshore islands, coastal hurricane repair and sand mining subject to license. Company also did bulk earthmoving in marshland areas if required. Commercial tasks involved monitoring of estimating, budgeting, management of other quantity surveyors, cash flow, payroll hours, plant returns, diesel & cost of sales monitoring, development of contractual forms to suit each project, and project management at an operational level when required to do so. Dredging projects typically led to +40% gross margin.

(Sindall Construction, ( East Anglia division Morgan Sindall, changed to Bluestone PLC or Morgan Ashurst as now known) , (Cambridge, UK)

May 2003 – May 2004

Project Surveyor for a 650K pounds new build gymnasium / boat house for Cambridge University. This project made a 4% gross margin, as expected by the company.

January 2003

Worked on design and financial “repair” of the 10 million pounds St.Edmundsbury Cathedral project, accounting to Commercial Manager / Project Surveyor. Work involved extensive ecclesiastical stone works and scaffolding to the tower (specialist subcontractors). Change management was the key to recovering value to this project.

June 2002 – July 2003

Responsibility as project surveyor for 750K pounds refurbishment / new build of grade one listed building, under JCT form of contract (without quantities). Variations involved the re-valuation of groundwork and external work packages to the value of 110K pounds. Client was a London property developer with a high level of understanding of building works, and an incredible eye for detail. Nonetheless the project returned a margin and this can be attributed to effective change management as the clients design was not complete, thus opening the door cost recovery through variations.

May 2002 – August 2003

Worked as project surveyor reporting to commercial manager on 5 million pound new build private house, design and build with extensive external works involving road & bridge construction. QS duties here were mainly procurement based, including preparation of tender documents, drawing analysis and take off, measurement and valuation for sub and main contract and the close out of subcontract accounts. The contract was let on the basis of a two stage tendering process.

March / April 2002

Prepared detailed take-off and estimate for small development (250K), involving some design of premises to suit client requirements (this was necessary due to the nature of the architect involved).

February 2002

Worked with senior surveyor on new build, design and build contract. 2,400 sq.mtr office block with façade retention required to the listed buildings involved. M&E package was a specific responsibility of mine here, together with procurement of structural frame subcontractor and demolition contractor. Office handover completed virtually snag free to a very high standard

February 2001 – June 2002

Warren Hill House, Newmarket – 6.2 million pounds new build residential property in traditional style complete with passenger lift, 25 metre swimming pool, 1.2 million pound joinery package and hi-technology intruder protection systems. £800,000 york stone paving externally with 1 km of tarmac roadway banded with cobbles. The contract faced situations such as the Architect being fired mid-term and replaced by the interior designer (Colefax & Fowler, London). 65nr subcontractors involved including nominated. Unusually for a project of this size, the IFC form of contract was used, client request.

(First Employer - Dean & Bowes, Huntingdon)

January 2000 to January 2001

Commercial and administrative backup to Northern England and Northern Ireland divisional quantity surveyor. Sites in operation were JDW Elgin (1.2 million pounds new build public house, groundworks, substructures, blockwork frame, steel roof), and JDW Dumfries. Duties covered a wide range of tasks as mentioned above often in the absence of direct in-office guidance.

July 2000

Refurbishment and fit our of former supermarket premises in Beckenham, Kent to form public house for Bass Leisure Retail PLC. Works included confined space groundworks, utility connections, blockwork internals and façade, plastering and all finishes including joinery and granite. Much time spent on ensuring early procurement of subcontractors on a labour, plant and material basis.

October 1999

Refurbishment of London Underground buildings at Baker Street station to create a new JD Weatherspoon public house. Works included demolition & major structural alterations in close proximity to an active underground train line in close liaison with LUL management and the design team. The form of contract here was JCT’98 with quantities. QS duties involved procurement of subcontractors and materials, and the measurement and take off of extensive ornate plaster castings and decoration due to the intricate nature of the building at Baker Street station.

June 2000

Construction of new build JDW public house in Sydenham, London on a brownfield site, works involved extensive steelwork, piling and party wall support – Contract value circa 800,000 pounds. This project involved a notably high level of co-operation with the local council because of tenants who opposed the development including adoption of careful contracting principles. QS duties include the ascertainment of loss and expense due to client led changes, and the finalization of subcontract accounts.

July 1999

New build, design & build twenty-one bedroom hotel extension, conference rooms and cocktail bar complex for Regal Hotels PLC. Works involved concrete pre-cast flooring in brickwork frame and extensive internal joinery with a high level of interior décor.

LIST OF PREVIOUS EMPLOYERS BY COMPANY (see above for individual project details)

Rider Levett Bucknall

Mark Williamson, Managing Director & Partner

020*-***-****

Speymill

John Chambers MRICS, MD

014**-***-***

Feb 09

SKANSKA Civil Engineering (Hill McGlynn)

ODA / Olympic Park Ryan Koopman (Commercial Manager) tel 020*-****-***

Sept 2007 – Nov 2008

Freelance QS, Bell Projects Limited (Main Contractor, part of Doyle PLC)

Ref : Paul Chaplin MRICS (Commercial Manager, John Doyle Group)

( Adrian Tomlinson MCIOB, MAPM , Senior Project Manager 078**-***-*** )

May 2007 – August 2007

Geoffrey Osborne Limited

New Primary School

Winston Way

Ilford IG1 2RA Reference : Barry Ford, Managing QS

Neil Woodhouse (PM) 079**-***-*** (currently with Westfield UK)

May 2003 – March 2007

JOHNSTON INTERNATIONAL LIMITED

Leeward Marina

Turks and Caicos Islands

BWI Contact : Mr Peter Collier MRICS MCIARB (Commercial Director)

Shaun Breeze ACCA (Financial Director)

Tel +1-649-***-****

February 2001 to May 2003

Bluestone Plc

Babraham Road

Sawston

CB2 4LJ

July 1999 to January 2001

Dean & Bowes (Contracts) Limited

Hemingford House

Glebe Road

Huntingdon

PE29 7DN

KEY SKILLS / EXPERIENCE POINTERS

First principles estimating and pricing capability, with / without subcontract tenders

Earned Value Analysis and S Curve preparation

Formwork & concrete structures take off & procurement a speciality

Proficient in high quality finished work, experience gained in high specification residential developments involving architects and highly regarded interior designers such as Colefax & Fowler, London

Contract management and Business Unit Operational Experience

Single and Two-Stage tendering experience

Setting up of contract administration systems

Setting up and monitoring of contract / project files in ISO approved format

Drafting / checking of contract documents prior to execution

Coordinating the execution of contractual agreements at subcontract and main contract level

Measurement and valuations of building works incl civils

Programming of works incl use of Power Project in association with the Site Manger

Budgeting / BQ splitting / subcontract allowance apportioning

Earned Value Analysis and cost program tracking

Analysis of cost / value and identification of opportunity / risk areas

Experience of project financing arrangements with Government including interest and payment deferment plans

Working understanding of Insurance issues and Surety, Bank Guarantee, collateral warranties, terms and conditions, contract law and claim procedures

Understanding of contract law including JCT / IFC / NEC3 / FIDIC (white / red) and AIA (USA)

Primavera Contract Manager (internet based NEC management system)

Constructware mega-project document control system

Preparation of tender documentation at subcontract and main contract level

Analysis of quotations / prices received, place orders, prepare for submission to PQS / Client representative

Experience of office build and refurbishment through to civils and interface of these works

Setting up of procurement & contract “duty” schedules, and contract administration requirements

Project management experience

Preparation & execution of subcontract and material orders

Processing payment applications for the main contract and subcontractors in accordance with the Housing, Grants, Construction Act (UK) and AIA (USA)

Valuation and agreement of subcontractors’ & Main contractors final account

Preparation of quotations & terms / prices for variation / change order works

Change control / commercial procedure initiation / compensation event sign off procedures

Preparation and agreement of final accounts for subcontractors’ and the main contractor

Civils experience on roads / bridges and landfill earthmoving

Complete management of variation instructions at a commercial level

Preparation of internal and external contract / project reports

Experience of international shipping & customs / import procedures / international construction logistical constraints and mitigation strategies

Design consultant appointment, terms, conditions and contract price (fee) validation

Preparation of cash-flow / cost flow / finance cost forecast for estimation purposes

Defect identification & works closeout procedures prior to practical completion

Value Engineering

Certification and closure of subcontract accounts in accordance with company procedure

Dredging experience, including drafting contracts, estimating based on contract work schedules, cost input monitoring and valuation, budgeting, pricing and cash flow controls, project and commercial management of the fleet activities at an operational level

OTHER SKILLS – General

Economics with Management Studies (BSc) graduate (1999)

Quantity Surveying graduate (BSc), including engineering and law modules (2004)

Full time work experience since 1999

Computer literate with Microsoft Excel, Word, Outlook, Kestral & Buildax, Primavera(Valuation, Estimating / Cost programs/ Management )

Good level of commercial awareness and risk identification

Experience of Building and Civil Engineering contracts, UK and internationally

Material buying experience including procurement strategy and scheduling

Ability to manage subcontracts, take full commercial responsibility for contracts

Negotiating & Partnership experience

Good working understanding of Management Accounts

Ability and desire to learn and progress, and will encourage others to do the same

Keen and pro-active attitude to change

Performance evaluation & identifying commercial hazards a speciality

Working understanding of the French Language

Value / Cost engineering experience

Mediation & dispute resolution experience

Programming / Gant Chart formulation

Common sense and awareness of H&S procedures, CSCS certified, SMSTS qualified

Pre- Professional Experience

Prior to embarking on QS career path in 1999 I had various holiday / vacation jobs including a formwork carpenter internship and property development on a practical level - total duration around 6 months spread over several years before and during college. This mainly occurred due to the lack of clerical jobs available in the Cambridge area at that time and I also found myself drawn to the building industry from general interest. This has culminated in an increased understanding of the construction process at a practical level.

EDUCATION

1999 – 2003 Anglia Polytechnic, BSc Quantity Surveying (day release)

1996 – 1999 University of London, BSc Economics with Management Studies

1994 – 1996 Royal Agricultural College & Royal Holloway Geology Dept.

1989 – 1994 The Leys School, Cambridge

A Levels – Geography, Economics, French, Art

GCSE – Geography, English, Maths, Physics, Chemistry, History, Art, Divinity, French

**Earlier school information available upon request

PERSONAL DETAILS

DOB : 1976 Marital Status : Married ( 1 baby )

Health : Good Drivers Licence : Full UK



Contact this candidate