Post Job Free
Sign in

Project Manager/ OSHPD IOR

Location:
Alameda, CA, 94501
Salary:
115k-120k
Posted:
June 23, 2009

Contact this candidate

Resume:

MATTHEW LEDFORD

**** ******* ****** ● Alameda, CA 94501 ● 510-***-**** ● ib1w3v@r.postjobfree.com

Project Manager/ OSHPD A Hospital Inspector / Project Superintendent

Innovative and results driven management professional having more than 17 years of experience successfully managing an array of construction categories. Creative and progressive thinker specializing in negotiation and effective direction geared to exceed expectations. Focused self-starter with a history of initiating, leading and motivating high performance working team environments. Strategic problem solver with proven adaptability to maintain positive momentum and mitigate risk. Perceptive administrator with a solutions based approach centered around cultivating valued relationships with clients and team members.

OSHPD A ● Project Management ● Team Building ● Goal Setting ● Schedule Assessment ● Risk Management ● Relationship Development ● Contract Administration ● Business Development ● Documentation Management● Cost Analysis ● Budgeting ● Logistics Control ● Strategic Planning

Professional Experience

Gordon-Prill, Inc. - Mountain View, California 2008-Present

Architects ● Engineers ● General Contractor

Design-Build and Construction Management specializing Satellite, Defense, Solar, Microchip and High Tech industries infrastructure, R/D and manufacturing facilities

Project Management

Direct and manage all aspects of multiple projects simultaneously. Develop and maintain risk management plans to examine possible impacts to client operations and programs. Provide cost estimating and budget analysis. Build master project schedules. Determine scope parameters and create bid packages for distribution. Complete project buyout and contract award. Maintain all project documentation, contract administration, cost projections, change order negotiation, long lead procurement and monthly billing. Regularly interface with client counterpart and program staff. Facilitate the coordination efforts of client vendors. Complete closeout and warranty packages.

● Provided commissioning and acceptance of facility ahead of already aggressive schedule completion for classified defense program.

Blue Ridge Construction Corporation - Alameda, California 2003-2008

General Contractor D/B CM

Owner/President

Completed and delivered various project types. Developed a geographic analysis to determine target market concentrations. Devised and implemented marketing and sales strategies. Provided pre-construction services inclusive of conceptual scope and schedule, as well as, budgeting and cost estimating. Facilitated design and engineering services, as well as, budgeting and cost estimating. Produced, assembled and distributed bid packages. Completed project buyout and awarded contracts. Maintained all project documentation and billing. Coordinated efforts of client vendors. Completed project closeout, warranty and turnover.

● Provided design/build, construction management and general contracting services to custom residential, select commercial and industrial clients.

XL Construction- San Jose, California 2000-2003

General Contractor

Design build and Construction Management specializing in Pharmaceutical, Microchip, High Tech, Satellite, Defense, Healthcare and Environmental industries infrastructure, R/D and manufacturing facilities.

Project Management/ Superintendant

Supervised onsite activities of all subcontractors. Created master schedules. Maintained control of site logistics and coordinated client vendors and equipment installers. Additional duties included project buyout, cost reporting and document management.

● Early completion and operational startup for largest single stream recycling plant in the United States.

● Successful aggressive emergency schedule to provide environmental and climate control to satellite clean room occupied with flight hardware.

Turner Construction Corporation SPD- San Jose/ San Francisco, California 1997-2000

General Contractor

Project Management/ Superintendant

Manage multiple projects simultaneously. Prepared cost estimates and identify potential cost impacts for outcome reports. Assembled and distributed bid packages. Completed project buyout and awarded contracts. Evaluated potential risks to client operations. Facilitated coordination efforts of client vendors. Regularly interfaced with client counterparts. Maintained contract and project documentation and billing. Evaluated and negotiated change order requests. Coordinated all onsite activities of subcontractors. Created project schedules for proposal and actual construction.

● Completion and acceptance of world wide data center hub with seamless expansion ahead of scheduled completion.

Ranack Constructors- Loveland, Colorado 1994-1997

General Contractor

Design build services specializing in multiplex/IMAX theatre construction in the United States and Canada.

Project Superintendent

Performed project buyout and contract administration. Created construction schedules and tracked long lead equipment. Managed the interaction between the design group and municipal utilities, local and state agencies with design group. Facilitate the client vendor operations and installation to synchronize efforts for specific timeframe. Provide complete closeout and turnover.

Ledford Engineering- Asheville, North Carolina 1992-1994

Consulting Engineers

Civil Engineer

Design engineer developed roadway design, earthwork analysis. Performed infrastructure design including force main design, sanitary sewer design, lift station and wastewater treatment facilities. Created 10 and 20 year mine plan. Designed haul roads and benching locations for the most effective harvest of granite.

EDUCATION ● CERTIFICATIONS

Bachelor of Science Civil Engineering and Construction Management

North Carolina State University ● Raleigh, North Carolina

OSHPD Class A Inspector A-20517

Project List

High Tech /Clean Room

• Intel Corporation, Santa Clara, CA: SC11 Data Center Expansion Phase 1 & 2

Worldwide communication hub for all engineering and masking operations.

Design build conversion of approximately 9ksf of existing office space into clean, climate controlled server farm. Design included provision of redundant power and HVAC systems to insure precise control tolerances. Mechanical scope included expansion of entire existing central plant to accommodate additional cooling requirements. Power requirements included installation of 14kv substation, backup generators and UPS DC battery systems. Project completed ahead of very rigid schedule.

• Intel Corporation, Santa Clara, CA: Focused Ion Beam Lab

Convert an existing office space into clean microprocessor testing lab. Project scope included the installation and connection of area owner tools and equipment.

• Intel corporation, Santa Clara, CA: ATO / Mattec Lab Consolidation

Design-build conversion of existing office space to combine two existing clean lab areas for the purpose of viewing and testing microprocessor layers for inconsistencies.

• Intel corporation, Santa Clara, CA: D2/P4 EG/EG3 Reclamation

Design build disposal and piping system installed inside microchip fabrication clean room for purposes of reclaiming possibly contaminated glycol cleaning agent. System routed through sub-fabrication areas to a final point of collection.

• Cable and Wireless USA, San Francisco, CA

Convert existing office space to expand existing operational data and communication center. Upgrade entire operating central plant/ HVAC system to accommodate current and future growth. Provide redundant DC/AC and backup generator power system. Build out of new administration offices.

Industrial / Defense

• Lockheed Martin Missiles & Space LMSS, Sunnyvale, CA: MKV AI & T

Space weaponry vehicle testing facility. Build out required expansion of existing central plant with multiple AH units to accommodate complicated environmental program requirements. Power requirements included the installation of a new 12kv substation, UPS DC backup. Scope included pre-action and FM 200 fire protection systems, LN2/N2 work stations, 50db sound controlled testing and presentation areas, data center and , control room.

• Lockheed Martin Missiles & Space LMSS, Sunnyvale, CA: B156 High Bay Environmental Controls

Design build central plant /HVAC system to provide 70kcfm into operating high bay clean room to accommodate pressure and climate desired by defense program client. Very rigid and aggressive project schedule met with success.

• Lockheed Martin Missiles & Space LMSS, Sunnyvale, CA: B153 Data Center

Design build expansion of operating server area and upgrade HVAC system to accommodate future growth. Install redundant power system including UPS and battery system.

• Lockheed Martin Missiles & Space LMSS, Sunnyvale, CA: B152 Central Plant Replacement

Provide new 30kcfm HVAC system to replace failing existing system in a class 10K low bay satellite assembly area. Aggressive project scheduling required accommodating customer program and protection of stored satellites. Overall project was successful both meeting schedule with operational performance exceeding user requirements.

• Intel corporation, Santa Clara, CA: D2 CHWS/R Emergency Replacement

Scope included the rerouting and replacement of main active underground 24” CHWS/R piping actively serving the entire microchip fabrication clean rooms climate control systems. Very aggressive schedule was met with success and without impact to production.

• California Waste Solutions, San Jose, CA: Design-build recycling plant

Scope included the conversion of 38,000sf existing office/warehouse building into

a new state of the art recycling facility. This plant was first in US to utilize single stream processing technology and equipment. Project scope included the build out of new administration offices, employee locker rooms, break room and dining area.

• West Coast Recycling Plant NORCAL, San Francisco, CA:

Convert an existing Port of San Francisco warehouse building pier 96 into recycling facility. Project scope included administration offices, processing equipment foundation systems and push walls construction, installation of multiple conveyances and sorting systems, baling presses and truck scales.

Base Build / Land Development

• Lockheed Martin Missiles & Space LMSS, Sunnyvale, CA: Design-build Satellite-Testing Facility (STA).

Base-build 120ft high bay facility. Majority of interior space consisted of class 100k clean room. Installation of test stands for purposes of launch simulation stress tests on satellite and missile fuselage and electronics. Technical foundation design installed to accommodate vibratory testing requirements.

• Metro 12 Theatre Complex, San Jacinto, CA: Construct design-build 39ksf completely operational turn-key multiplex movie theatre complex. Provide complete infrastructure and site development of 7 acre parcel for future restaurant, entertainment and retail shops.

• Metro 8 Theatre Complex, Indio, CA: Construct design-build 27ksf completely turn key multiplex movie theatre complex. Provide complete site development and infrastructure installation of 9 acre parcel for future restaurant, entertainment and retail shops.

• United Artist, 10 Theatre Complex, Fresno, CA: Construct 33ksf multiple theatre complex at existing developed site. Owner’s vender equipment installation and startup coordination was included as a part of the overall project scope.

• Cinemark North, Mall 5, Ames, IA: Convert 18ksf retail space in actively operational shopping mall into multiple auditorium theatre.

Education / Medical / Office

• EF International Language Schools, San Francisco, CA

Tenant improvements to convert approximately 13ksf of existing office space into an adult school. Build out included constructing multiple classrooms, administrative offices also including kitchen and bathroom facilities.

• Dr. H.S. Siu Neurological Clinic, Fremont, CA

Design build tenant improvements to provide examination rooms, offices and administrative area.

• Genentech International, Palo Alto CA

Design build tenant improvements to reconfigure multiple office spaces and copy centers.

• Tech Partners, San Francisco, CA

Design build tenant improvements to convert approximately 12ksf of retail space into administrative headquarters for tech and web design personnel placement agency.

• EVE.com, San Francisco, CA

Design build tenant improvements to convert approximately 30ksf multiple floor office space into headquarters for startup Internet Company. Multiple phase build out required to accommodate projected company growth, tenant occupancy requirements and space availability.

• New Tech Law Offices Expansion, San Jose, CA

Design build tenant improvements to provide additional open office and individual office spaces, as well as remodel existing actively functioning office space.



Contact this candidate