RESUME
of
Gilbert C. Reyes
*** *.****** ****** ******, Bauan, Batangas
Email Add: *******@*****.***
Mobile #: 091********
POSITION: E & I Pre-Com/Inspector AGE: 32
EDUCATION:
SCHOOL YEAR COURSE
ELEMENTARY: Bauan West Central School 1993 Primary
HIGH SCHOOL: Bauan High School 1997 Secondary
COLLEGE: University of Batangas 2002 BS in Electrical Engineering
Registered Electrical Engineer 2003(reg. no. 31881)
TRAINING and SEMINARS ATTENDED:
• Meralco Foundation Institute
Meralco Center, Ortigas Avenue,
City of Pasig, Philippines.
July 8, 2005
• The International Development
and Environmental Shipping School
Subic Bay Freefort Zone, Philippines
June 20-24, 2005
• First Aid Training and Basic Life Support
PNR Batangas Chapter
June 20-24, 2005
• Coal Fired Thermal Power Plant
Coal Fired Thermal Power Plant Operation
September 13, 2003
• Combined Cycle Power Plant and its Operation
University of Batangas
October 9, 2003
POSITION : E & I Pre Commissioning/Commissioning
COMPANY : SPIE OIL GAS SERVICE
PROJECT : FED Metering/Infill’s Drilling / Block 3
OFFSHORE SONANGOL Client
Luanda, Angola(S.A.)
YEAR EMPLOYED : March 1, 2010 – June 15,2011
JOB DESCRIPTION:
• Experience in on hook-up operation such as instillation, erection, pre commissioning, start-up and maintenance of offshore gas processing plant.
• Perform calibration for all instrument transmitter prior for commissioning.
• Take all electrical drawings to familiarize the system works.
• Inspection of quality of all equipment in good quality also experience termination of cable in a panel board and installation of fire alarm and lighting fixture.
• Coordinates with electrical engineer prior for inspection.
• Responsible and monitor all the instrument equipment and be sure if it is valid and calibrated.
• Checks electrical routine layout and associated detailed.
• Coordinates with the consumer, consultant and other relevant parties for site witness inspections.
• Performs and conducts site surveys and reference for preparation of electrical and instrumental works
• Prepares daily/ weekly accomplishment report during surveilance
• Ensures work completed to conformity with prevailing standards and specifications.
• Familiarizes with the P & ID and electrical isometric drawing specifications for the phase of works.
• Ensures all documents, tools consumables and equipment is available to perform the scope of work.
• Establishes positive thinking relationship with the mediate supervision with personnel from other department.
WORK EXPERIENCE
POSITION : E & I Engineer/ Inspector / QC
COMPANY : CHEVRON INTERNATIONAL EXPLORATION
PRODUCTION
PROJECT : FRADE PROJECT-BRAZIL UPSTREAM
FPSO(Floating,Production,Storage and Offloading)
Conversion VLCC Tankers(1.5million barrel)
YEAR EMPLOYED : December 03, 2007 – February 28,2009
JOB DESCRIPTION:
Responsible of all inspection for Floating Production Storage and Offloading-FPSO and Conversion of VLCC Tankers with nominal storage capacity of 1.5 million barrel.Installation and fabrication of internal turret design with 33 risers.The topside facilities will comprise of an processing system sized for 100,000 bopd, a gas compression and treatment plant,sized for 106 MMscftd and a water injection plant sized for 150,000 bwpd with equivalent 16 Modules.
• Review E&I quality control documentation for completeness
• Approval the final dossier as requirement
• Witness OTP(Operational Test Procedure) for all equipment with different sub-system
• Witness E&I scope in mechanical completion and consolidate punchlist as per client standard specification
• Verify tray fittings are installed per installation details
• Check the installation of cable racks and trays as per standard specification
• Check cables are stacked/grouped in accordance with E&I installation specs
• Verify that cable/wire size,type and numbering is correct
• Verify the spacing of cable cleatsand straps complies with project specification
• Identifying cable racks and confirm selection of correct material type
• Verify the correct tag number,range,ect. According to datasheet
• Verify the devices/instrument in the proper place
• Ensure proper earthing where necessary
• Verify the instrument that is suitable protected against adverse environmental conditions
• Check the equiptment and instrument was to be installed in proper place
• Ensure the instrument correctly and rigidly installed according to Hook-Up dwg.
• Verify the EEx type of equipment, fittings and other details for electrical installation
• Verify data and nameplate details against data sheet and project specification and drawings for compliance
• Verity that the IP rating and enclosure integrity is maintained and gaskets and seals are undamaged
• Verify grounding is complete and installed per project specifications and drawings
• Verify the enclosure has been labeled with correct nametag
• Verify enclosure has proper access and working space per project specification
• Electrical inspection for Switchgear & MCC’s including circuit breaker and contractor setting & trip check
• Verify the Danger/Warning signs are installed as required
• Installation and testing of Batteries & Chargers including confirm rating,cable connections,confirm charge and electrolyte level
• Check the proper installation of Lighting Fixture such as confirm the area classification(hazardous or non-hazardous area)
• Verifying the Grounding System for connections and continuity testing,also cable type and size
• Checking the motor nameplate data,storage preservation,bearing,oil levels,wiring and terminal connection,insulation test,grounding,witness uncoupled run-in and confirm amperage load and temperature,and also installation of switches,startup and operational testing including coupled run-in
• Check the Control Center including storage and receive equipment,installation of panel board,console,rack and control center wiring must be test the continuity and insulation resistance
• Verifying the tag numbers ,dip high and low pressure,slope,support,materials & rating,pressure and leak testing
• Check loop test including input/output signal loops
• Verify the calibration of instrument including all digital and analog instrument,control valves either pre-installed / instruments installed at site
• Verification of correct instrument to be installed as per P& ID
• Verifyng the cable terminated at EEx d enclosures,armour clamping type EEx d cable glands shall be used
WORK EXPERIENCE
POSITION : E & I Pre Commissioning /Commissioning
COMPANY : SPIE OIL GAS SERVICE
PROJECT : ROSA PROJECT, FPSO/ Girassol Block 17
Luanda, Angola(S.A.)
YEAR EMPLOYED : June 26, 2006 – Nov. 2007
JOB DESCRIPTION:
• Experience in on hook-up operation such as instillation, erection, pre commissioning, start-up and maintenance of offshore gas processing plant.
• Perform pre commissioning and commissioning in the power source, all camps electrical loads, lighting, motors, transformers, UPS, fire and gas system, Earthing system and control system.
• Take all electrical drawings to familiarize the system works.
• Inspection of quality of all equipment in good quality also experience termination of cable in a panel board and installation of fire alarm and lighting fixture.
• Coordinates with electrical engineer prior for inspection.
• Responsible and monitor all the instrument equipment and be sure if it is valid and calibrated.
• Checks electrical routine layout and associated detailed.
• Coordinates with the consumer, consultant and other relevant parties for site witness inspections.
• Performs and conducts site surveys and reference for preparation of electrical and instrumental works
• Prepares daily/ weekly accomplishment report during surveilance
• Ensures work completed to conformity with prevailing standards and specifications.
• Familiarizes with the P & ID and electrical isometric drawing specifications for the phase of works.
• Ensures all documents, tools consumables and equipment is available to perform the scope of work.
• Establishes positive thinking relationship with the mediate supervision with personnel from other department.
POSITION : E & I Q.C. Inspector
COMPANY : SAUDI TECHINT LTD.
PROJECT : Harald Al-Crude Increment III Facilities
Dharan
YEAR EMPLOYED : August 2005- April 2006
JOB DESCRIPTION :
• Experience in on hook-up operation such as instillation, erection, pre commissioning, start-up and maintenance of onshore gas processing plant.
• Perform pre commissioning and commissioning in the power source, all camps electrical loads, street lighting, motors, transformers, UPS, fire and gas system, Earthing system and control system.
• Take all electrical drawings to familiarize the system works.
• Inspection of quality of all equipment in good quality also experience termination of cable in a panel board and installation of fire alarm and lighting fixture.
• Coordinates with electrical engineer prior for inspection.
• Responsible and monitor all the instrument equipment and be sure if it is valid and calibrated.
• Checks electrical routine layout and associated detailed.
• Coordinates with the consumer, consultant and other relevant parties for site witness inspections.
• Performs and conducts site surveys and reference for preparation of electrical and instrumental works.
• Prepares daily/ weekly accomplishment report and work schedule inspection
• Ensures work completed to conformity with prevailing standards and specifications.
• Familiarizes with the P & ID and electrical isometric drawing specifications for the phase of works.
• Ensures all documents, tools consumables and equipment is available to perform the scope of work.
• Establishes positive thinking relationship with the mediate supervision with personnel from other department
POSITION : Operator Technician
COMPANY : MINOLA REFINING CORPORATION
Batangas, Philippines
YEAR EMPLOYED : June 2004-July 2005
JOB DESCRIPTION :
• Monitors operational parameters and oil sampling products for good qualities.
• Maintains the equipment’s used.
• Performs and conducts site surveys and reference for preparation of electrical and instrumental works
• Checks electrical routine layout and associated details.
POSITION : In-line Electricians
COMPANY : MEGAPACK PAPER MILLS DIVISION
Batangas, Philippines
YEAR EMPLOYED : January 2004-May 2004
JOB DESCRIPTION :
• Responsible for the maintenance in electrical and mechanical works.
• Ensures work completed to conformity with equipment and be sure if it is valid and calibrated
• Checks electrical routine layout and associated details.