MARIO GARZA
**** ***** ***** ▪ Pearland, TX *****
832-***-**** ▪ ***********@*****.***
OBJECTIVE
To secure a Computer Drafting and Design position within a leading and innovative organization that will allow me to utilize my technical knowledge and challenge me to further my skills in this area.
Knowledge & Skill Areas:
❑ AutoCAD 2000-2010
❑ Architectural Desktop
❑ Manual Drafting ❑ AutoDesk Inventor
❑ Adobe Illustrator
❑ Microsoft Office ❑ 3D Studio Max
❑ Adobe Photoshop
❑ Microsoft Windows
Bilingual - English/Spanish TW.I.C Certified Basic plus orientation
EDUCATION
ITT TECHNICAL INSTITUTE, Houston, TX Graduated December, 2007
Associate Degree of Applied Science, Computer Drafting and Design
Coursework includes: Drafting and CAD Methods, Architectural Drafting, Engineering Graphics, Rapid Visualization, Descriptive Geometry, Composition, Design Theory and Methods, Physics, and College Mathematics.
ASSOCIATED GENERAL CONTRACTORS OF AMERICA
Certificate of Completions - Safety Management, Blueprint Reading, and Supervising Skills
WORK EXPERIENCE
WORLEY PARSONS ENGINEERING. Houston, TX 2008-Jan 2010
At Sterling Chemicals Texas City, TX
MECHANICAL/ ELECTRICAL & PIPING DRAFTER
References: Willy Barnett, Ele. Engineer Tel 409-***-**** Chacko George, Pro. Manager Tel 409-***-****
▪ Worked on loops, P&ID, schematic drawings and spec sheets for I/E projects.
▪ Create letter of instructions for field employes to complete projects.
▪ Pipe design elevations, surveying, field work to get accurate dimensions
JACOBS ENGINEERING. Houston, TX March 2007-Sep 2008
At BP Texas City, TX
CAD OPERATER III
▪ Work with walk down crew to mark up drawings.
▪ Corrected mark ups and redlines, lead of the P&ID group
Sketched isometric (electrical, piping and instr.) drawings in field to get drawn in autocad.
Kelly Services. Houston, TX 2006-2007At Sterling Chemicals in Texas City, TX
Draftsman/Design
▪ Isometric sketches for piping walk down work
▪ Work with pipe designers to get correct elevations and dimensions per pipe locations
▪ Correct mark ups and redlines.
H&S Construction, Katy, TX 2003 - 2005
Foreman
▪ Supervise 4-8 direct reports while managing water proofing projects
▪ Organize and lead safety meetings, created accident reports, and maintained MSDS books per company regulations
▪ Management of project timelines and conducted presentations to provide updates to clients
E.E. REED Construction Corporation, Sugarland, TX 1997 - 2003
Field Engineer
▪ Analyze building layouts, parking lot layouts, tilt wall paneling, and blueprints to determine engineering specifications
▪ Ensure that project was completed and met client requirements