DAVID KORTY-CPIM **** Quail Ridge North Drive, Plainfield, Indiana 46168
•317-***-**** Cell •***********@*****.***. http://www.linkedin.com/in/davidkorty
MASTER SCHEDULER
QUALIFICATIONS_______________________________________________________
• SAP-MRP system with Eli Lilly & Co., and Roche Diagnostics, specifically with Purchasing and Materials Planning and Control.
• Proficiency spanning Materials Control, Inventory Analysis, Scheduling, and Purchasing.
• Demonstrated abilities to conduct analyses, and develop strategic plans, with problem solving, to ensure the achievement of organizational objectives, using a strong work ethic.
• APICS (American Production and Inventory Control Society) Certified- CPIM.
• Operations Management, Total Quality Management, Forecasting, MRP Implementation, and Training/Development.
SELECTED ACHIEVEMENTS_____________________________________________
• In six months, the inventories of plastics decreased from $1.6 million to $1.1, and labels inventory from $1.9 million to $.9 million. This made a total inventory reduction of $1.5 million---Nicepak Products.
• Hired by Eli Lilly to assist with the installation of SAP into the Delivery Device Assembly Operations facility, in Indianapolis, IN---Eli Lilly & Co.
• Cut raw materials inventory from $2,200,000 to less than $1,000,000 in one year – Altec Ind.
• Initiated and managed a perpetual cycle counting program that established an inventory accuracy level of 95%---Commercial Filters.
• Installed Just-In-Time (JIT) with high-dollar and bulk items, achieving JIT turns of 37.6 and overall inventory turns of 18 Toro Wheel Horse.
• Implemented a computerized production schedule to bring a two-month backlog of past-due shipments down to two days LaBour Pump.
• Reduced inventory of respiratory equipment by decreasing time-to-delivery and alleviating excess inventory Universal Hospital Services.
• Created an accurate record of all excess aircraft parts and coordinated the sale of these parts at over $480,000 American Trans Air.
PROFESSIONAL PROFILE_______________________________________________
Senior Materials Planner: April, 2007- Sept. 2011
NICEPAK PRODUCTS, INC.
• Purchase, release, expedite, and control the inventory levels of over 173 plastic tubs and lids, over 1,495 labels, over 128 bags, and 316 flow wraps, for all eleven production lines. This accounts for over 70% of all raw materials, for the Indiana facility.
• Work extensively with an MRP system- BPCS, and Red Prairie warehouse management system.
• Monthly inventory analysis of excessive, and obsolete inventory, to trim overall inventory dollars, and increase inventory turns.
Planner/Buyer: March, 2005-Dec. 2006
ELI LILLY & COMPANY- Delivery Devises Div. (Contract with Theoris)
• Successfully launched SAP release 12, in April, 2006, and release 13 in August, 2006.
• Responsible for scheduling the production on an assembly line of insulin delivery devise pens. Duties include releasing Process Orders, and monitoring daily days of stock, of seven finished good items, distributed throughout the US.
Planner/Buyer: June, 2003-March, 2005
ROCHE DIAGNOSTICS–Applied Sciences Div.–(Contract with Adecco)
• Planner and controller of the inventory and production of the powder filled products (170 items), and the Purchase and Kitting of the Lightcycler and MagNA Pure Instruments for the purification and detection of nucleic acids, and Polymerase Chain Reaction (PCR). The value of the inventory that I control averages $3 million in standard cost.
• Extensive use of SAP software, for purchasing and shop floor control, including work orders, bills of material, and routings. Also, using E-Doc, Outlook, Excel, and Access.
Distribution Service Representative: (temporary position) 2002-2003
UNIVERSAL HOSPITAL SERVICES
• Tested, cleaned, and delivered respiratory equipment to hospitals, clinics, and nursing homes across Indiana.
Inventory Coordinator/Buyer: 1999-2002
ALTEC INDUSTRIES
• Controlled and procured inventory of all components and support materials, including emergency purchases, for constructing utility trucks for power companies.
• Implemented Min-Max and Material Requirements Planning (MRP) systems for inventory control.
Production Control Manager: 1997-1999
CROWN EQUIPMENT – MANAGER OF FIVE PEOPLE IN PLANNING AND WAREHOUSE
• Maintained responsibility for shop floor control and shop work orders, MRP, and expediting the production and assembly of material-handling equipment.
• Introduced and implemented a new material-moving product, called the WAVE-(Work Assist Vehicle) as part of a team made up of Design and Mechanical Engineers and Quality staff.
EDUCATION
Master of Business Administration: UNIVERSITY OF INDIANAPOLIS
Bachelor of Science, Industrial Management; Minor, Quality Control: PURDUE UNIVERSITY
David Korty 317-***-**** cell ***********@*****.***