E.SCOTT JORDAN
Phone: 678-***-**** • Email: ************@*****.***
SKILLS
• Common Sense Manufacturing, 5S, Kaizen, and Lean Manufacturing Training
• Product Launch Experience
• Practical Problem Solving (Design of Experiments, Statistical Analysis, 8D, 5 Why)
• APQP, PPAP, MSA, and SPC Training
• QS9000, ISO 9001, TS 16949, and ISO 14001 Trained
• Siemens, Omron, and Allen-Bradley PLC Programming
• Pro-Engineer and AutoCAD
• Office Software: Microsoft Office Suite, Project, Visio, Lotus Notes
PROJECT ACHIEVEMENTS
• Productivity increase of 30% on Ford Variable Cam Timing Unit Assembly Line through downtime reduction by modifying existing assembly line tooling.
• Quality Project Manager – Developed documentation and quality processes for launch preparation of Chrysler Pentastar Cam Timing Spools.
• Engineering Project Manager – Nissan MY2010 Maxima (Steering Gear): Budgeted $2.8 Million, saving 43%, completing with $1.6 Million; Project successfully launched as scheduled.
• Engineering Project Manager – Mitsubishi MY2010 Endeavor (Steering Gear): Budgeted $125k, saving 40%, completing with $75k; Project successfully launched as scheduled.
• Assistant Project Manager – GM MY2010 Camaro (Steering Gear): Budgeted $4 Million, saving 19%, completing with 3.25 Million; Project successfully launched as scheduled.
• Scrap reduction for Steering Gear Assembly – 20% scrap reduction with the development of rework tooling; saved $60k annually.
• Rework reduction for Steering Gear Assembly – 25% rework reduction with new assembly line tooling; reducing rework by 1500+ units annually.
• Productivity increase of 10% on Nissan Titan Steering Gear Assembly Line through the use of line balancing; increase of 1000+ units annually.
CERTIFICATIONS
• Member of Project Management Institute (PMI)
• RABQSA – Certified ISO 9001:2000 Internal Quality Auditor with ISO/TS 16949 Automotive Emphasis
EMPLOYMENT
February 2011 - Present Hitachi Automotive Systems Monroe, Georgia
Process Engineer
• Responsible for assigned projects to include but not limited to planning, designing, and purchasing new equipment, improving and troubleshooting existing equipment and process planning for new products.
• Responsible for process improvements through the use of Kaizen activities and statistical analysis.
• Programmed, repaired, and maintained automated manufacturing equipment.
November 2010 – January 2011 Model Screw Products Clearwater, Florida
Quality Project Manager
• Responsible for the implementation of the Quality System for new product launch including PPAP submission, capability studies, and SPC collection and analysis.
• Manage manufacturing support staff of four quality technicians.
July 2010 – November 2010 Unisia Of Georgia Corporation Monroe, Georgia
Process Engineer
• Responsible for assembly line preparation for new product launch.
• Responsible for process improvements through the use of Kaizen activities and statistical analysis.
• Programmed, repaired, and maintained automated manufacturing equipment.
March 2003 – July 2010 IPC International / AlliedBarton Buford, Georgia
*AlliedBarton Services replaced IPC International as third-party contractor in October 2009
Assistant Account Manager (Assistant Security Director)
• Provide continual direction to a staff of approximately thirty officers.
• Promote a professional working environment.
• Coordinate responses by Police, Fire and EMS when necessary.
• Communicate effectively in diverse environments and make difficult decisions in stressful situations.
• Complete administrative duties such as incident reporting, weekly payroll, personnel actions, continuing education training, statistical data collection and client specific duties.
• Administer and document personnel related duties including hiring, scheduling, performance appraisals and staff development.
October 2001 – July 2009 Unisia Steering Systems, Inc. Oakwood, Georgia
Manufacturing Engineer
• Responsible for assigned projects to include but not limited to planning, designing, and purchasing new equipment, improving and troubleshooting existing equipment and process planning for new products.
• Conducted necessary training regarding machine operation, tool fixture changes and procedures.
• Performed testing, analyzing, and monitoring of machine capability.
• Project Management: assigned to manage, budget, schedule, train, maintain, and start new assembly lines.
• Conducted PPAP reports for new product and assembly line launches.
• Participated in multi-disciplinary teams including 5S, Quality Improvement, Productivity Improvement and Scrap Reduction.
• Programmed, repaired, and maintained automated manufacturing equipment.
• Conducted internal QS-9000, ISO 9000, TS 16949 and ISO 14000 audits.
• Established and maintained ERP routings for existing and new products.
October 1990 – August 2001 Oki Telecom, Inc. Suwanee, Georgia
Industrial Engineer
• Responsible for assigned projects to include but not limited to improving and troubleshooting existing equipment and process planning for new products.
• Conducted necessary training regarding machine operation, tool fixture changes and procedures.
• Programmed, repaired, and maintained automated manufacturing equipment.
• Conducted internal ISO audits and quality control inspections.
• Developed process documentation to meet both internal and external customer needs.
• Established and maintained ERP routings for existing and new products.
• Participated in multi-disciplinary teams including scrap reduction, resulting in eighty percent reduction.