PRADIP DESAI
More than ** years of experience out of which 18 to 19 years in Petrochemicals Industry.
Personal Name: Pradip Thakorbhai Desai
Information DOB: 10th August 1969
Marital status: Married
Address for B-51, Umang Society, Nr Jay Jalaram nagar,
Communication Harinagar-Vasna road,
Vadodara-390 015
Gujarat
Contact Details Mob no- 099***-*****
Resi phone no-026*-*******
Passport No: G 2945544(Valid up to 27-05-17)
E-Mail ID *************@*****.**.**
*************@*****.***
Qualification #MBA (Supply Chain Management)
Years of Passing: 2010
Institute: ISBM
Percentage of Marks: 77.60 %
#BE (Electrical)
Year of Passing: 1999
Institute: M.S.University, Baroda
Percentage of Marks: 56 %
#Diploma Electrical Engineering
Years of Passing: 1988
Institute: M.S.University, Baroda
Percentage of Marks: 68.56 %
#Industrial Purchase & Materials Management.
Years of Passing: 2009
Institute: M.S.University, Baroda
Percentage of Marks: 64.92 %
#Certification in Financial Management from NSE Mumbai
With 68.75 % in 2004.
About present Reliance Industries Limited (Earlier IPCL), Vadodara.
Employments At present working in Power Plant known as Integrated Offsite Plant (IOP) having two STG with 12.5 MW capacities.
Key Skills -Reliability improvement of various electrical equipments like
Motors, Transformers, Breakers, Variable speed drives, PCC,
MCC AND HT Panels with aim of zero down time, keeping
maintenance cost as low as possible and also reducing
engineering Inventories.
- Hands on experience of HT / LT Motors Overhauling and Motor
Testing.
-Knowledge of Electrical equipments, Selection of equipments
with reference to Hazardous Area Classification & Standards for
installation of electrical Equipments
-Familiarization of SAP –PM module.
-Knowledge of PPE used for safety and safety procedure.
-Preparing FIR and FAR for any failure.
Work Troubleshooting, analysis and rectification of Electrical faults
Experience for motor, equipment failure with sound Engineering practices.
Condition based monitoring /Diagnostic, Testing of motor,
Switchgears.Monitoring electrical equipments like Transformers,
Motors, HT /LT panels etc carrying out the jobs safely and
systematically for speedy maintenance with less time
consuming.
Maintenance and trouble shooting of LVD GERMAN Make packing machine with nos. of interlocks.
Maintenance of Fire Alarm System.
Major Activities -Trouble shooting and maintenance.
-Spares and Inventory management.
-Shut-down planning.co-ordination and monitoring.
-Failure and breakdown analysis.
-Vendors/Contractors development.
-Documentation and updation of engineering knowledge.
-Techanical training for developing engg.skills.
-To preview and revise the list of contractors.
Equipments Protection Relays (ABB & GEC make)
Worked on HT Switchgear at 6.6 KV levels (JYOTI make)
LT Switchboard (L & T, Siemens make)
UPS (The Furukawa Battery Co Ltd, JAPAN and Emerson Network Ltd) and Chabhi make.
Power and Distribution Transformers (Voltamp & Bhel make)
HT and LT motors (NGEF, Kirlosker, Siemens, ABB, Baldor electrical, Emerson, CGL, Euro drive, Toshiba etc)
Control techniques make PLC based VF drives.Lumus Cutter
Job Profile About past Employments.
#Star Holdings and Electronics Research’s Pvt. Ltd as JR.Engg from Jan 1989 to March 90, where I was responsible for production planning, testing and after sales service of Testing Instruments Used for Textile Industries.
#Kriton Welders and Engg Company as Production Supervisor from July 1988 to Jan 1989, Where I was looking after manufacturing and servicing of Welding Machines like Spot, Seam, Butt and Arc welding.
Training Training on UPS
Training on Siemens PLC and Variable frequency drives.
Training program on Motor Maintenance.
Training and Visit to NGEF COMPANY, BANGLORE.
Training on Safety and First Aid.
Miscellaneous Working knowledge of MS-WORD, EXCEL, and POWER POINT.
Ability to work in multi-culture team.
Having good communication, interpersonal and problem solving skills.
Ability to cope up with multiple assignments and various
Challenges in the job, ready to accept any challenge.
Achievements Successfully completed commissioning of CO2 Flooding
system for the 12.5 MW Turbine Generators.