Seth Scott Hall

**** ** ******** **.

Albany,Or 97322

541-***-****

***********@*****.***

Objective:Obtain a position in the industrial construction/services industries as a millwright/mechanic or related fields.

Skills:

*A good working knowledge of industrial machinery such as rotating equipment,conveying systems,material handling,hydraulic and pneumatic systems,etc.

*Able to interpret blue prints,drawings,technical manuals and procedures.

*Safe worker with a positive attitude to behavioral based safety.

*Good communication and interpersonal skills.

*Able to maintain required records,logs and files.

*Able to use precision,power and hand tools.

*welding/fabrication, carpentry knowledge and troubleshooting skills, and basic computer skills.

Experience: I am currently working in my seventh year as a millwright/mechanic

I began my career as a helper out of high school and have progressed to a journeyman level and have been the lead millwright on occasion in the past couple of years.

01-2010/Present. White Mountain Industrial Services Inc.-Springerville,Az.-

Assisted in the overhaul of a Voith Turbo hydraulic coupling. Also rebuild of three Flowserve Boiler feed pumps and booster pump including mechanical seals for a 400MW coal power plant in Springerville,Az.

07-2009/01-2010. Casey Industrial-Raleigh,Nc.-Worked as a millwright at a continuous particle board press supplied by Dieffenbacher. Assisted with the installation,erection and start-up.

06-2008/07-2009 TIC-Springerville,Az-Worked as a millwright at a 400MW coal power plant. Duties include the erection and installation of the turbine surface condenser,coal handling conveyors,structural erection,equipment setting and alignment. Worked with the start-up group commissioning the cooling towers and coal handling conveyors.

12-2007/06-2008 Oregon Industrial-Oremet,Or-Installed four new titanium sponge plant furnaces and associated piping. Also performed outage and maintenance activities.

06-2007/10-2007 Brahma Group-Evanston,Wy-Performed outage maintenance on Vesta windmill farm. Work scope included change out of gear boxes,hydraulics,motor units and associated equipment.

06-2006/06-2007 Teton Industrial-Linden,Ut-Worked as a millwright and pipe in the installation of a Siemens K&N model 300MW steam turbine. Assisted in start-up and turnover to the client.

10-2005/06-2006 Casey Industrial-Burlington,Wa.-Worked as a millwright at a continuous laminate board press. Worked on this project from layout to completion. Installed press,gang saws and stacker equipment.

02-2005/05-2005 Country Coach-Eugene,Or-Worked as a welder in the fabrication of motorhome frames and suspension components.

08-2004/01-2005 Casey Industrial-Reno,Nv-Worked as a millwright at a James Hardie Cement board plant. Duties were the installation of the slurry tanks,pumps and piping. Also erected and assisted in the start-up of the finishing line conveyor system.

07-2004/08-2004 Casey Industrial-Durant,Ok-Performed millwright /mechanic duties in the start-up at a plate glass plant. Installed safety guards and performed operational check out of equipment prior to acceptance by client Cardinal Glass.

06-2004/07-2004 Casey Industrial-Overton,Nv-Worked on the refurbishment of a silica sand plant for Simplot.

Demolished existing plant equipment and installed a new kiln and emissions wet scrubber.

01-2004/05-2004 Casey Industrial-Newberry,Sc-worked as a millwright helper in the installation of new tech scanner saw mill .Set conveyors,saws, scanners,trim saw and bin sorter.

06-2003/01-2004 Casey Industrial-Moreland,Ok-First job as a millwright helper at a gypsum processing plant installing conveyors,vessels,blowers,airlocks and associated duct and structures.

References:

Bruce G Poole

928-***-****

White Mountain Industrial Services Inc.,President

Lloyd Blair

805-***-****

Millwright Supervisor

Fletcher Chandler

601-***-****

Casey Industrial,Millwright Superintendent

Steve Donahue

303-***-****

Casey Industrial, Project Manager