ESTEBAN A. DELICANO, JR.
Contact no. : (+**) ****0547, (+65) 82624866
Blk. 618 Woodlands Ave. 4, #06-521, Singapore 730618
Email: ************@*****.***.**, **********@*****.***,
EMPLOYMENT RECORD
April 2010 – March 2012 Construction Engineer
KAJIMA CORPORATION
(Incorporated in Japan)
March 2009 – March 2010 Senior Engineer – Civil & Structural
Sembawang Engineering and Construction Pte Ltd
460 Alexandra Road, # 27- 01 PSA Building
Singapore 119963
Nov. 2007 – Feb. 2009 Site Engineer
Shimizu Corporation (Incorporated in Japan)
Overseas Civil Engineering Division
78 Shenton Way #04-03 Singapore 079120
Feb. 2007 – Oct. 2007 Structural Supervisor
Lian Beng Const. (1988) Pte Ltd
25 Playfair Road, Lian Beng Building
Singapore 367990
Sept. 2005 – Jan. 2007 Site Engineer
Guan Ho Const. Co. Pte Ltd
395A Changi Road, Singapore 419843
Aug 2004 – Aug. 2005 Site Engineer
Fongnam Engineering & Const. Pte Ltd
346A Bedok Road Singapore, 469533
April 1999 – Dec. 2003 Project Engineer
Esgin Builders & Const.
Bacolod City, Philippines
Jan. 1997 – May 1998 Field Engineer
Engineering Equipment Incorporation (EEI)
Bacolod City, Philippines
May 1994 – Jan. 1997 Project Engineer
Calben Engineering & Const.
Bacolod City, Philippines
April 1992 – Dec. 1993 Site Supervisor
Tandcor Trading & Const.
Bacolod City, Philippines
March 1990 – Feb. 1992 Site Engineer
Narra Const. & Developer
Bacolod City, Philippines
EDUCATION & PROFESSIONAL DEVELOPMENT
• Negros Institute of Technology, Bacolod City, Philippines
Bachelor of Science in CIVIL ENGINEERING, May 1990
SEMINARS AND TRAININGS
• Training - Troxler Nuclear Density Gauge (CPG Laboratories - Singapore) for Soil Compaction
Test (12th Jul 2005)
• Microsoft Project 2002 Core - Singapore (10th Jan 2007)
• Building Construction Safety Supervisor Course (BCSS) 19th July 2007, SC2- Singapore
• SOC & SIC Course (OIL/PETROCHEMICAL)
• SHES- EXXONMOBIL Training
• Risk Management Course
• Surveying – Vertical Control (Leveling) – IES ACADEMY – 13th Oct 2010
• Construction of Underground & Related Structures (Earth Retaining Structures) – IES ACADEMY 21st Oct 2010.
• Working at Height Training – IES ACADEMY 14th Sep 2011.
“CERTIFIED RTO – IES REGISTERED”
SPECIAL SKILLS
*Construction Management, Project Supervision and Inspection, Engineering estimate and drafting (manual)
COMPUTER SKILLS
Versed in: Microsoft Office Word / Excel, Internet and Email, MS Project (basic)
PERSONAL
Nationality : Filipino
Date of birth : 03-Oct-1966
Age : 46
Civil status : Married (with 2 children)
Height : 176cm
Weight : 72kg
RESUME OF WORKING EXPERIENCE
1. KAJIMA CORPORATION – (April 2010–Mar 2012)
Projects: SENOKO STAGE II CCP RE - POWERING PROJECT (Power Plant)
Position: Construction Engineer
Position Duties:
• Checked & reviewed the Method Statement, Safe Work Procedure & Risk Assessment submitted by the subcontractor before submission to clients for approval as follows;
a. ) Bored Piling Works
b. ) Transformer & Gas Turbine Foundation, Matt Foundation, HRSG, HPIP, Retaining Walls & other equipment foundation For RC Works.
c. ) Jack – In Piling Works
d. ) Excavation Works & Sheet Piling Works
e. ) Erection & Fabrication of Steel Structures Works including Wall Claddings & Roofing.
f. ) Underground Piping, Cable & Pipe Trench, Storm Drainage, IC’s, Manhole, Ditches Concrete Paving & Road Asphalt Laying.
• Liaise with the M&E Coordinator regarding any services on the under slab and embedded items before casting.
• Inspecting materials delivered on site by suppliers, vendors to ensure they meet specified requirements and to arrange for any testing required.
• Ensure that all rebar works has been installed following project plans and specification.
• Ensure that contractors comply with all aspects of the Worksite HSE Plan and policy; site regulations, permit to work and client requirements.
• Knowledge not only at work but also with all safety precautions in all phases of works especially in fabrication and erection.
• Closely supervised to the area assigned for daily activity & ensure the subcontractor shall follow the approved drawings & specifications given by the designer.
• Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and target.
• Checked the working drawings if any discrepancy & raised RFI / RFA to the designer.
• Prepare inspection forms, submit to the consultant & liaise with the RE / RTO’s of any item to be inspected by them on site, especially in rebar/form works before casting.
• Attend daily subcontractor coordination meeting & highlight to the Project Manager any problem arise on site.
• Close Coordination on site to the other parties to avoid clashing activities for preventing delayed.
• Prepare punch list for the defect item and give to the subcontractor for rectification prior to hand over.
• Prepare handing over documents and submit to the clients for final acceptance for the completed items.
2. Sembawang Engineering and Construction Pte. Ltd. (March 2009 – March 2010)
Projects: Marina Bay Sand IR PROJECT
Construction of Theatre and Retail
Construction of Casino
Bottom Up and Top Down Construction With Basement 4
Position: Senior Engineer – Civil & Structural
Position Duties:
• Liaise with the clients, consultants on solving technical issues for the project.
• Direct co-ordination with the Construction Manager regarding site planning and progress of work.
• Attend daily subcontractor coordination meeting and highlight to the Project Manager any problem arise on site.
• Closely monitor the site activities/progress and delegate to the Site Supervisor the activities to the respective subcontractor.
• Prepare and submit inspection form for approval to the activities intended to check by the consultant, especially construction of beams, columns, slabs, pile cap and other related activities that under my area assigned.
• Arrange other trade contractor for planting of rebar and pull out test.
• Coordinate with subcontractors in the area assigned especially in technical issues arise in the project.
• Checked all the drawings on the area assigned and raised RFI if there are unclear details on the plan before issued to the subcontractor.
• Ensure that subcontractors are working in the required work areas, locations and elevations and that work sequence and interfaces with other subcontractors are both coordinate and planned to provide continuous working to meet contracts schedule.
• Ensure by leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions.
• Ensure that contractors comply with all aspects of the Worksite HSE Plan and policy; site regulations, permit to work and client requirements.
• Attends meetings with other members of the Project Team and/or the Client, as required, in order to report on project status, discuss problem arise and contribute towards the solution of such problems.
• Liaise with the M&E Coordinator regarding any services on the under slab and embedded items to concrete before casting.
• Arrange for final inspection of completed works and handing over.
3. Shimizu Corporation (Incorporated in Japan) (Nov. 2007 – Feb. 2009)
Projects: Exxon Mobil Plant (Jurong Island)
SMAG II RC Beam Reinforcement and
Singapore Parallel Trained (SPT) / SME / SPP2 and SPTOF Area
Construction SPT Project
Position: Site Engineer
Position Duties:
• Arrange subcontractor for the installation of steel plate reinforced to RC Beam.
• Supervise fabrication assembly of structural members and other miscellaneous structures.
• Checked and verify the steel structural drawing especially in steel members prior to the erection
of the steel column / I beam and steel platform.
• Supervised in the cutting of steel plates and ensure all the measurement is correct before the installation.
• In charge for the submission of permit to work.
• Ensure and check all the welding points is done properly and arrange for welding test (MPI) prior to epoxy pressure grouting work.
• Ensure the welding and pressure grouting work was followed plans/specification/work method statement and safety rules & regulation.
• Arrange for final inspection of completed works and handing over.
• For Temporary Work – In charge in overall Plumbing work especially in excavation / installation of manholes / IC’S / laying of sanitary pipe, water line and Tie in work to the existing sewer line.
• Coordinate to the Project Planning Engineer of the completed works for final claim.
• Assist to the Planning Manager in preparing the method statement and risk assessment for temporary logistic and temporary facilities for SPT Exxon Mobil Project and also in charge in preparing the work method of statement and risk assessment for permanent work from mobilization of equipment, civil work, earth work, excavation work, Erection of Steel Structure, Concrete Work and other activity involve for the construction of power plant polymer (SPT Project) and submit to Exxon Mobil for Approval.
• Coordinates subcontractors for the construction of temporary facilities.
• Prepare monthly and weekly schedule using Excel.
• Supervision of all structural works / civil works and erection of steel structure for building frame and installation of fabricated steel roof truss, purlins and wall cladding for temporary facilities.
• Prepare daily site report and monitor the progress of work based on master schedule to prevent delay and aware of safety rules and regulation and highlight to the project manager any problem arise when the construction is on going.
• Participate and give talk in the safety tool box meeting every morning before the work started to ensure that the workers will fully understand regarding the hazard in their working environment.
• Prepare weekly and monthly man hour report and submitted to the client.
• Prepare and submit inspection request to the client of any activity subject for inspection.
• Ensure that all construction materials, embedded items, are approved for use and that they are properly stored, protected and available to workface location as required,
• Attend daily subcontractor coordination meeting and weekly coordination meeting to the clients and in charge for taking the minutes of meeting.
• Assist to the QC for the submission of material approval to the clients.
• Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and target.
4. Lian Beng Const. (1988) Pte Ltd (Feb 2007 – Oct. 2007)
Projects: Condominium Housing Development @ 124 & 126 St. Patrick”s Road
Comprising of 5 Blk., 2Blk. of 8th storey & 3Blk. of 5 storey with basement car
park, and swimming pool in the first level.
Position: Structural Supervisor
Position Duties:
• Supervision of all structural works; Sheet piling, I beam strutting & bore piling works, construction of pile caps, ground beams & columns from basement to the upper level of the building.
• Arrange for any welding test work especially MPI or NDT test for Sheet Piling and I beam Strutting works and ensure it is done properly and followed the standard specification.
• Ensure in basement excavation was followed plans, specification and method statement issued by the consultant.
• Co-ordinating & sequencing sub-contractors works according to the master and detailed construction schedules to prevent delays.
• Supervised to the workers/equipments operators in daily site activities.
• Ensure & checked that all rebar works has been installed was following project plans
and specification.
• Inspecting materials delivered on site by suppliers, vendors to ensure they meet specified requirements and to arrange for any testing require.
• Knowledge not only at work but also with all safety precautions in all phases of works regarding fabrication and erection.
• Aware with daily productivity, budget man-hours and schedule/ planed activities to be done.
• Checked and review all structures drawings and highlight to the project manager what ever
technical problem arise and would be settle before construction to prevent delays.
• Ensure and checked all the reduce level and cut off level for the construction of pile cap and
ground beams that was followed structure drawing.
• In charge for the construction of substation & highlight to the M & E Engineer what any
problem arise during construction.
• In charge the submission of Request for Inspection to the authorities concerned in any
activities related to structural works.
5. Guan Ho Const. Co. Pte Ltd (Sept. 2005 – Jan. 2007)
Projects: Alteration & Additional of Existing Bukit Timah Campus ( NUS ),
Under T.Y Lin & Forum Architect.
Position: Site Engineer
Position Duties:
• Checking and Supervision of all Structural works, especially in Steel Fabrication and erection and also in Architectural, M&E works and external works performed by
sub-contractors on site to ensure the quality works was produced.
• Co-ordinating & sequencing sub-contractors works according to the master and
detailed construction schedules to prevent delays.
• Liasing with clients, consultants on checking of works.
• Consulting the Structural Engineer, Architectural/M&E Co-coordinators on any problem related to quality.
• Inspecting materials delivered on site by suppliers, vendors to ensure they meet specified requirements and to arrange for any testing require.
• Assisting in the handing over of the completed works and rectification of any defects by the appropriate sub-contractors.
• Ensure and checked the micro-piling works, cable/tendon stressing and the demolition works is done according to the plan and method statement.
• Direct co-ordination with the Construction Manager regarding site planning and progress of work.
• Assist to Qs for Project tendering e.g. Architectural Finishes & Coordinate to Structure Engineer for tender structure calculation & structure as built calculation for final claims.
6. Fongnam Engineering & Const. Pte Ltd (Aug 2004 – Aug. 2005)
Projects: Proposed Earthworks @ Anchorvale Road/ Anchorvale St. &
Sengkang Eastway under Parsons Brinkerhoff Pte Ltd.
Earthworks @ Tampines Ave. 10 under JTC Corporation.
Position: Site Engineer
Position Duties:
• Co-ordination with sub-contractor related to Instrumentation works.
• Direct co-ordination with the Project Manager regarding site construction activities.
• In charge of the soil leveling during excavation & backfilling using Survey Instrument.
• Prepare daily progress report.
• Supervised to the workers/equipments operators in daily site activities.
• Liaise with the Resident Engineer of the Clients regarding the status of the project.
• Performed Soil Compaction Test using Troxler – Nuclear Density Gauge.
• Highlight to the workers/equipments operators about safety precauttion before working at site.
• Planning & scheduling of all site activities, following the project plans & specification.
7. Esgin Builders & Const. (April 1999 – Dec. 2003)
Projects: Construction of Gaisano City Shopping Mall
Construction of Bacolod City Gymnasium
Position: Project Engineer
Position Duties:
• Co-ordination and control of all sites activities.
• Planning and scheduling of works, supervision activities, material preparation, etc.
• Attend site show round, customer needs and complaints.
• Liaise with other discipline, Architects, Mechanical and Electrical Eng’rs. And
Clients, representative in facilitating field operation.
• Prepare material take-off for tender / bidding purposes.
• Preparation of B / Qs for budget and invoice purposes.
• Ensure that all rebar works has been install following project plans and specification.
8. Engineering Equipment Incorporation (EEI) (Jan. 1997 – May 1998)
Projects: La Tondena Distiller Incorporation, Distellera Plant Bago Expansion Project,
Bacolod City, Philippines
Position: Field Engineer
Position Duties:
• Progress monitoring of all structural and architectural activities.
• Technical knowledge regarding the overall phases of the project and ensure that
approved specifications and procedures are properly implemented.
• Supervise fabrication assembly of structural members and other miscellaneous structures.
• Supervise the installation of fire rated doors, wall cladding and raised floor.
• Attend coordination meeting with the clients and other discipline supervisors regarding
fabrication assembly and erection of structural members.
• Direct coordination with Project Manager regarding major problems / conflicts that arise in
fabrication and erection.
• Aware with daily productivity, budget man-hours and schedule/ planed activities to be done.
• Knowledge not only at work but also with all safety precautions in all phases of works
regarding fabrication and erection.
• Perform all works assigned following project plans, procedures and specifications.
9. Calben Engineering & Const. (May 1994 – Jan. 1997)
Projects: Construction of Robinson Galleria Shopping Mall
Construction of 50 KVA Transmission Line
Construction of Diesel Power Plant
Erection of Smart and Glove Satellite Steel Tower
Bacolod City, Philippines
Position: Project Engineer
Position Duties:
• Coordination with sub – contractors related to architectural works.
• In charge of the internal shop front details.
• In charge of metal works, pelmets, doors, balustrade, spandrel and roller shuttle.
• In charge of the tilling works and marble including granite to all areas of the project.
• Checked and ensure that all structural works was properly done following plans and
specification.
• Checked and verify the steel structural drawing especially in steel members prior to the
erection of the steel tower.
• Ensure that all machine bolt was installed before casting of the steel tower foundation
and cured enough prior to erection.
• Request for joint inspection to the concerned authorities to check the steel members coding
before the erection will start.
• Ensure and checked the proper location of the cable tray before installation.
• Coordinate to the Electrical Engineer regarding the installation of electrical cable for the
transmission line.
• Liaise to the consultant and highlight to them whatever problem arise prior to the construction.
• Prepare daily and weekly progress report.
• Attend weekly site meeting and reporting the status of the project.
• Direct co-ordination with the Construction Manager regarding site planning and progress of work.
• Ensure and highlight to the steel tower erector all safety precaution before the erection will start.
• Prepare monthly progress claim.
10. Tandcor Trading & Const. ( April 1992 – Dec. 1993)
Projects: Construction of Four Storey Bacolod City Convention Buildings
Bacolod City Philippines
Position: Site Supervisor
Position Duties:
• In charge the architectural works of the block both internally and externally.
• Also assist in the structural works.
• Planning the schedule of the works during the fabrication and erection.
• Co-ordination and supervision of workers and sub-contractors to ensure the smooth flow of the project..
• Defects checking and maintenance of the site during handover.
• Checked and ensure that the rebar plan was issued to the sub-contractors before fabrication.
• In charge for the supervision of all construction activities.
• Direct co-ordination with the Project Engineer regarding site planning and progress of work.
• Liasing with clients, consultants on checking of works.
• Planning and scheduling of works, supervision activities, material preparation, etc.
11. Narra Const. & Developer (March 1990 – Feb. 1992)
Projects: Three Storey Academic Building and Library
13 Units Health Plus Buildings
16 Classroom Carino Type DECS Buildings
Construction 0f Various Roads and Bridges
Bacolod City, Philippines
Position: Site Engineer
Position Duties:
• In charge of all aspect of the works from structural to architectural finishes, landscape link
ways and site maintenance.
• In charge of all structural works from file caps, slabs, beams, columns & stiffener columns.
• Check all leveling and soil compaction for roads construction.
• Schedule of all equipments at site.
• Check the daily manpower and monthly payments.
• Prepare weekly progress of work accomplishment.
• Supervise fabrication assembly of structural members and other miscellaneous structures.