CURRICULUM VITAE
Name : Edi Sesvianto
Address :Pesona Cinere Residence, Blok G/5
Jl. Cinere Raya – Limo Maruyung, Depok
Phone :(+47) 40306818 (Norwegian)
Email :***.*********@*****.***
Place/date of birth :Indonesia, Kerinci, September 08, 1980
Passport No. : A 0040412
Country : Indonesia
Position : Senior Civil/Structure Designer
Software : PDMS Modeling and 2D Draft, Micro station V8 and AutoCAD
Education : Diploma, Majoring Civil/Structure from Negeri Padang University
EXPERIENCE SUMMARY
13 (Tretten) years experience in various multi disciplined engineering projects from conceptual up to detail design engineering stage, including development through to completion including design, detail drafting, materials take off and have extensive knowledge in computer application for structural design especially Inter graph PDMS Modeling and 2D Draft, Auto Cad and Micro station and also conversant with Microsoft Office, Excel and general word processing skills.
Dec 2011 to Present: PT. FABRICOM (Norwegian)
Dec 2001 to Present: Stjerne – Topsite Modification on Oseberg Sør Project use PDMS V.12.6
Client : Statoil
Job Assignment : Stavanger (Norway)
Position : Sr. Structure Designer
Assignment Project : Design, Modeling 2D Draft for Equipment Support (Protection Wall, Winch Base Frame, Winch Foundation, Sheave Foundation, Test Beam Foundation, Produced Water Cooler Foundation and HPU foundation and Storage Tank Foundation).
Prepare Design Drawing for:
General Arrangement Plan Drawing, Section and Details Drawing and Material Take Off
Jan’2011-10 Dec 2011: PT. Technip (Malaysia)
Jan’2011-10 Dec2011 : Generic Floating LNG Project use PDMS V.12.6
Client : Shell.
Job Assignment : Kuala Lumpur (Malaysia)
Position : Sr. Structure Designer
Assignment Project : Design, Modeling 2D Draft consists for two Area (Inlet Gas Facilities Fractionation and Inlet Gas facilities Booster Compressor).
and responsible for handling Upper Structure of Main Process Deck, Service Platform, Pipe Rack, Stairway Tower, Handrail, Equipments Support
Prepare Design Drawing for:
Main Deck Primary and Secondary framing Plan
Main Deck Flooring and Handrail layout
Handrail lay out
Joint Detail
Material Take Off
Nop 2009-Dec 2010 : PT. KBR Engineering (Indonesia)
Sep 2009-Dec 2010 : Gorgon Barrow Island LNG Project use PDMS V.11.6
Client : Chevron Australia Pty ltd.
Job Assignment : Jakarta (Indonesia)
Position : Sr. Structure Designer
Assignment Project : Consist 3Train area (Train1, 2, 3) Design, Modeling 2D Draft for Module Structure. Secondary Framing, Access Platform, Stairway Tower, Pipe support, Runway Beam, flooring deck Module.
May 2009-Jun 2009 : Pluto LNG Project use PDMS V.11.6
Job Assignment : Jakarta (Indonesia)
Position : Sr. Structure Designer
Assignment Project : Design, Modeling 2D Draft for Main Deck, Sub Caller Deck, Jacket,Secondary Framing, Access Platform and Pipe support
Dec 2008-April 2009 : At HALFDAN B Phase IV Development - HBD use PDMSV.11.6
Client : Maersk Olie OG GAS AS.
Job Assignment : Jakarta (Indonesia)
Position : Sr. Structure Designer
Assignment Project : HALFDAN B Phase IV Development Project Design, Modeling for Jacket, Boat landing and Deck (Main Deck, Cellar Deck, Sub Cellar Deck and Access Platform
Prepare Design Drawing for:
Main Deck Primary and Secondary framing Plan
Main deck Flooring and handrail layout
Joint Details
Material Take Off
Sept 2006-Dec 2008 : PT. Singgar Mulia Engineering (Indonesia)
Sep 2007-Dec 2008 : South Mahakam Field Development Project East Stupa,Main Stupa, West Stupa Platform use PDMS V.11.6
Client : TOTAL Indonesia
Job Assignment : Jakarta (Indonesia)
Position : Structure Designer
Assignment Project : Design, Modeling For Topside EastStupa, MainStupa, WestStupa Platform for Primary and Secondary Framing, Access Platform, Monorail Equipment Support
Prepare Design Drawing for:
Main and Cellar Deck Primary and Secondary framing Plan
Main and Cellar Deck flooring and handrail layout
Joint Detail
Boat landing Framing and Detail
Material Take Off
Sep 2006-Sep 2007 : Oyong Development Project Phase II Use PDMS V.11.6
Client : Santos
Job Assignment : Jakarta (Indonesia)
Position : Structure Designer
Assignment Project : Design, Modeling For Upper structure of Main Structure Steel
Prepare Design Drawing for:
Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off
Okt, 2004-Aug’2005: PT. REKA PATRIA EKAGUNA (Indonesia)
Aug 2003-Sept 2004 : Ujung pangkah Platform use PDMS V.11.6
Job Assignment : Jakarta (Indonesia)
Position : Structural Designer
Assignment Project : Design, Modeling for Deck (Main Deck, Cellar Deck, Sub Cellar Deck, Boat landing, Access Platform, Pipe support, flooring and Handrail.
Prepare Design Drawing For :
Main Deck framing plan, section and details
Main Deck Flooring and Handrail Layout
Walkway Plan
Material take Off (MTO)
Aug 2001-Sept 2004 : PT. Tripatra Engineering (Indonesia)
Aug 2003-Sept 2004 : Phase B $ SLS D Project use Micro Station
Client : Exxon Mobile Indonesia
Job Assignment : Jakarta (Indonesia)
Position : Civil/Structural Designer
Assignment Project : Prepare design Drawings
Handling Upper structure of Main Pipe rack for Cooler, Pipe support and Other Building for Equipment and Material Take Off
Aug 2001-Sept 2002 : QULF SOUTH Jambi use Micro Station
job Assignment : Jakarta (Indonesia)
Position : Civil/Structural Designer
Assignment Project : Prepare design Drawings
Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off
Aug 2001-Sept 2002 : CALTEX (Area U) use Micro Station
Client : Chevron Indonesia
Job Assignment : Jakarta (Indonesia)
Position : Designer
Assignment Project : Prepare design Drawings
Handling Upper structure of Main Pipe rack for Cooler, Shelter, Pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off
Feb 1999-May 2001 : PT. PERTAFENIKKI ENGINEERING CORP.
Job Assignment : Jakarta (Indonesia)
Position : Civil/Structure Drafter
Assignment Project : Prepare Drawings for
Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off