Post Job Free
Sign in

Project Design

Location:
DKI Jakarta, Jakarta Capital Region, 12450, Indonesia
Salary:
USD $ 8500
Posted:
March 20, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

Name : Edi Sesvianto

Address :Pesona Cinere Residence, Blok G/5

Jl. Cinere Raya – Limo Maruyung, Depok

Phone :(+47) 40306818 (Norwegian)

Email :***.*********@*****.***

Place/date of birth :Indonesia, Kerinci, September 08, 1980

Passport No. : A 0040412

Country : Indonesia

Position : Senior Civil/Structure Designer

Software : PDMS Modeling and 2D Draft, Micro station V8 and AutoCAD

Education : Diploma, Majoring Civil/Structure from Negeri Padang University

EXPERIENCE SUMMARY

13 (Tretten) years experience in various multi disciplined engineering projects from conceptual up to detail design engineering stage, including development through to completion including design, detail drafting, materials take off and have extensive knowledge in computer application for structural design especially Inter graph PDMS Modeling and 2D Draft, Auto Cad and Micro station and also conversant with Microsoft Office, Excel and general word processing skills.

Dec 2011 to Present: PT. FABRICOM (Norwegian)

Dec 2001 to Present: Stjerne – Topsite Modification on Oseberg Sør Project use PDMS V.12.6

Client : Statoil

Job Assignment : Stavanger (Norway)

Position : Sr. Structure Designer

Assignment Project : Design, Modeling 2D Draft for Equipment Support (Protection Wall, Winch Base Frame, Winch Foundation, Sheave Foundation, Test Beam Foundation, Produced Water Cooler Foundation and HPU foundation and Storage Tank Foundation).

Prepare Design Drawing for:

General Arrangement Plan Drawing, Section and Details Drawing and Material Take Off

Jan’2011-10 Dec 2011: PT. Technip (Malaysia)

Jan’2011-10 Dec2011 : Generic Floating LNG Project use PDMS V.12.6

Client : Shell.

Job Assignment : Kuala Lumpur (Malaysia)

Position : Sr. Structure Designer

Assignment Project : Design, Modeling 2D Draft consists for two Area (Inlet Gas Facilities Fractionation and Inlet Gas facilities Booster Compressor).

and responsible for handling Upper Structure of Main Process Deck, Service Platform, Pipe Rack, Stairway Tower, Handrail, Equipments Support

Prepare Design Drawing for:

Main Deck Primary and Secondary framing Plan

Main Deck Flooring and Handrail layout

Handrail lay out

Joint Detail

Material Take Off

Nop 2009-Dec 2010 : PT. KBR Engineering (Indonesia)

Sep 2009-Dec 2010 : Gorgon Barrow Island LNG Project use PDMS V.11.6

Client : Chevron Australia Pty ltd.

Job Assignment : Jakarta (Indonesia)

Position : Sr. Structure Designer

Assignment Project : Consist 3Train area (Train1, 2, 3) Design, Modeling 2D Draft for Module Structure. Secondary Framing, Access Platform, Stairway Tower, Pipe support, Runway Beam, flooring deck Module.

May 2009-Jun 2009 : Pluto LNG Project use PDMS V.11.6

Job Assignment : Jakarta (Indonesia)

Position : Sr. Structure Designer

Assignment Project : Design, Modeling 2D Draft for Main Deck, Sub Caller Deck, Jacket,Secondary Framing, Access Platform and Pipe support

Dec 2008-April 2009 : At HALFDAN B Phase IV Development - HBD use PDMSV.11.6

Client : Maersk Olie OG GAS AS.

Job Assignment : Jakarta (Indonesia)

Position : Sr. Structure Designer

Assignment Project : HALFDAN B Phase IV Development Project Design, Modeling for Jacket, Boat landing and Deck (Main Deck, Cellar Deck, Sub Cellar Deck and Access Platform

Prepare Design Drawing for:

Main Deck Primary and Secondary framing Plan

Main deck Flooring and handrail layout

Joint Details

Material Take Off

Sept 2006-Dec 2008 : PT. Singgar Mulia Engineering (Indonesia)

Sep 2007-Dec 2008 : South Mahakam Field Development Project East Stupa,Main Stupa, West Stupa Platform use PDMS V.11.6

Client : TOTAL Indonesia

Job Assignment : Jakarta (Indonesia)

Position : Structure Designer

Assignment Project : Design, Modeling For Topside EastStupa, MainStupa, WestStupa Platform for Primary and Secondary Framing, Access Platform, Monorail Equipment Support

Prepare Design Drawing for:

Main and Cellar Deck Primary and Secondary framing Plan

Main and Cellar Deck flooring and handrail layout

Joint Detail

Boat landing Framing and Detail

Material Take Off

Sep 2006-Sep 2007 : Oyong Development Project Phase II Use PDMS V.11.6

Client : Santos

Job Assignment : Jakarta (Indonesia)

Position : Structure Designer

Assignment Project : Design, Modeling For Upper structure of Main Structure Steel

Prepare Design Drawing for:

Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off

Okt, 2004-Aug’2005: PT. REKA PATRIA EKAGUNA (Indonesia)

Aug 2003-Sept 2004 : Ujung pangkah Platform use PDMS V.11.6

Job Assignment : Jakarta (Indonesia)

Position : Structural Designer

Assignment Project : Design, Modeling for Deck (Main Deck, Cellar Deck, Sub Cellar Deck, Boat landing, Access Platform, Pipe support, flooring and Handrail.

Prepare Design Drawing For :

Main Deck framing plan, section and details

Main Deck Flooring and Handrail Layout

Walkway Plan

Material take Off (MTO)

Aug 2001-Sept 2004 : PT. Tripatra Engineering (Indonesia)

Aug 2003-Sept 2004 : Phase B $ SLS D Project use Micro Station

Client : Exxon Mobile Indonesia

Job Assignment : Jakarta (Indonesia)

Position : Civil/Structural Designer

Assignment Project : Prepare design Drawings

Handling Upper structure of Main Pipe rack for Cooler, Pipe support and Other Building for Equipment and Material Take Off

Aug 2001-Sept 2002 : QULF SOUTH Jambi use Micro Station

job Assignment : Jakarta (Indonesia)

Position : Civil/Structural Designer

Assignment Project : Prepare design Drawings

Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off

Aug 2001-Sept 2002 : CALTEX (Area U) use Micro Station

Client : Chevron Indonesia

Job Assignment : Jakarta (Indonesia)

Position : Designer

Assignment Project : Prepare design Drawings

Handling Upper structure of Main Pipe rack for Cooler, Shelter, Pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off

Feb 1999-May 2001 : PT. PERTAFENIKKI ENGINEERING CORP.

Job Assignment : Jakarta (Indonesia)

Position : Civil/Structure Drafter

Assignment Project : Prepare Drawings for

Compressor Shelter, pipe rack, Pipe Bridge, Foundation, Access Platform, Support, Sleeper, Plan & detail and Material Take Off



Contact this candidate