To Whom it may concern ,

I am submitting the enclosed resume for consideration of a Superintendent/Foreman. My background has given me the hands on experience in all facets of infrastructure (heavy marine ,dock , and bridges).Specializing in pile driving , form,& deck (D.O.T) building bridge/marine ports that would I believe contribute greatly to your company’s goals and objectives.

You will see after reviewing the enclosed resume, I have made numerous contributions to my present, and past employer/s that has benefited the bottom line .These accomplishments are derived from my strong interpersonal and communication skills, attention to detail, and unparalleled work ethic .A key talent that I can bring your company includes a practical approach to construction with a constant eye for controlling costs and finishing the project/s

under budget, without compromising safety, or diminishing quality .My reputation precedes me for listening and analyzing employee’s ideas and thoughts on creating a safe and productive work environment.

I am enthusiastic about exploring opportunities with your company and look forward to meeting/speaking with you .I will contact you in the next few days to answer any questions and schedule an interview at your convenience.

Thank you for your consideration.

Sincerely, Joshua Relihan

OBJECTIVE:

It is my professional commitment to diligently apply my previous work experience and education to meet the challenges of my everyday working environment. In addition, it is my personal ambition to continually expand and enhance my professional skills.

SUMMATION OF SKILLS:

Over 15 years Construction experience

Mobilizing in, and out

Equipment procurement, and set up

Pile Driving Experience

Concrete

Drill Shafts

Auger Cast

Pipe

H-Beam

Sheets (All types, and sizes including Flat)

Timber

Composite

Have experience in all facets of pile driving. From super heavy Bridge Foundation Pile, Coffer cells, Drill Shafts, to light Residential, foundation pile, and docks.

Structural, Decks, Diaphrams, overhangs, set up & operate Bidwell

Welding

Substructure

Columns

Caps

Bulkheads

Crane Rail Caps

Form Systems

EFCO

Simmons

Hunnebeck Italia

Gang, Wood, Jahn and Gates

Decks (Conventional, P.T)

Tensioning Rod and Cable

EXPERIENCE:

Skanska – Tidewater 10/2008 – 10/09

Pile Superintendent

Project: Bridge Of Lions Replacement / Rehab, St. Augustine, Florida (76.8M)

• Supervision of installation and removal of sheet pile for Coffer dams

• Oversees 2 crews, day and night shift

• Removal of all old drill shaft

• Responsible for setting all girders

• Concrete pours

• Paperwork; timesheets, daily reports

• Submittals, delay submittals

• Schedule projections

• All wet work (off barges)

Archer Western Contractors 02/2008 – 10/2008

Consultant(Set-up and Train key Personel)

Project: I-10 and I-195 Interchange, Jacksonville, Florida (157M)

• Supervision of installation and removal of sheet pile for Coffer dams

• Oversaw 2 crews, day and night shift

• Responsible for setting all girders

• Concrete pours

• Paperwork; timesheets, daily reports

• Submittals, delay submittals

• Schedule projections

• Fabrication of Templates for Test and Production Pile, no pre-drilling

• Cantilever Templates and Conventional Templates; 2 and 3 stage

• Planning and Coordination with Night Crew

• Retaining and Replacement of Personnel

• Supervision of installation of all test pile (PSC 24” x 110’, 120’)

• Supervision of installation of all production pile.

• All work in the dry.

American Bridge Company 01/2007 – 02/2008

Pile Foreman

Project: Dames Point Container Terminal, Jacksonville, Florida (12M)

• Supervision of installation and removal of sheet pile for Coffer dams, and bulkhead (3,000 Linear Feet)

• Oversaw 4 – 16 crew members at a time, depending on phase of project

• Concrete pours

• Paperwork; timesheets, daily reports

• Submittals, delay submittals

• Schedule projections

• Fabrication of Templates for Test and Production Pile, no pre-drilling

• Cantilever Templates and Conventional Templates

• Planning and Coordination with Engineer

• Retaining and Replacement of Personnel

• Supervision of installation of all test pile (Pipe 30” x 81’)

• Supervision of instillation of all production pile (#430, 30” x 81’)

Misener Marine Company 08/2005 – 01/2007

Pile Foreman

Project: Moran Towing Pier, Jacksonville, Florida (400K)

• Oversaw 4 – 14 crew members at a time, depending on phase of project

• Concrete pours

• Paperwork; timesheets, daily reports

• Submittals, delay submittals

• Schedule projections

• Fabrication of Templates for Test and Production Pile, no pre-drilling

• Cantilever Templates and Conventional Templates

• Planning and Coordination with Construction Manager

• Retaining and Replacement of Personnel

• Worked primarily on barges

Balfour Beatty 06/2001 – 08/2003

Foreman

Project: Broad River Bridge, Beaufort, South Carolina (105M)

• Supervision and installation of trestle

• Oversaw Drill Shaft crew, installing cans

• Setting girders

• Deck formation, Set up,and run Bidwell, overseeing crew

• Planning and Coordination

• Schedule projections

• Paperwork; timesheets, daily reports

• Retaining and Replacement of Personnel

• Worked on barges and landside

Recchi / GLF

Foreman

Project: Sidney Lanier Bridge (Cable Stay) Brunswick, Georgia (121M)

8/1997 – 05/2001

• Supervision and installation of Coffer dams

• Set up and pouring of footers

• Setting girders

• Columns and Tower Legs, (Forming)

• Hanging of iron in South Towers

• Drove all piling for South Approach, footers and caps

• Pushed and tensioned cable

• Oversaw a crew on Form Traveler

• Formed and poured last two Hammerhead Caps

• Push and tension cable for stays

• 90% of work off barges

REFERENCES:

Mike Bacon: Project Manager, American Bridge #011-504-3392-9119

Bob Fitzgerald: Construction Manager, Misener Marine #954-***-****

Jeff Addison: Owner Coastal Foundations #912-***-****

More exp. Available if nec.