ALDRIN I. MAGBUHAT
J. Adajar St. Sta. Rita, Batangas City, Philippines
Cellphone No.: [Roaming] +63-939-*******
Email: **********@*****.***
Personalised employment Pass holder (PEP)
FIN: G6080271N Date of application: July 27,2009
Date of issue: Jan 18,2010
Date of expiry: Jan 18,2015
OBJECTIVE
To be able to work in an established and construction oriented organization that will provide personal growth and will enhance my abilities and knowledge leading to professional maturity in line of Instrumentation.
WORK HISTORY
Project Site: Petroleum Development Oman (PDO) Steam Process Project
Address : Qarn Alam, Sultanate of Oman
Company : OCEAN AUTOMATION SOLUTION
Position : Instrument Commissioning Technician
Period : July 12 – Dec. 18,2011
Project Site: BP Angola PSVM FPSO Project
Address : Jurong Shipyard, Singapore
Company : MODEC Int’l. Inc.
Position : Instrument Commissioning Technician
Period : May 26,2011 – July 10,2011
Project Site: First Gas Power – Siemens Power Operation Inc.
Address : 1000 Megawatts Power Plant Project Sta. Rita, Batangas City
Company : I & E Industrial System Services, Inc.
Position : Instrument
Period : September 8,2010 to May 9,2011
Project Site : Bohai- FPSO Phase II Development Project (onshore/offshore)
Company : Conocco Phillips China Inc
Address : Sembawang Shipyard, Singapore
Position : Instrument Commissioning Technician
Period : April 11,2008 – July 31,2009
Project Site : EPC2 SAKHALIN ENERGY INVESTMENT COMPANY (SEIC)
Address : Sakhalin Oblast Nogliki District, Lunskiy Bay, Sakhalin, Russia
Company : KENTZ GROUP OF IRELAND
Position : Instrument Commissioning Technician and E&I QA QC Inspector
Period : Sept. 2007 – April 7, 2008
Project Site: Exxon Neftigas Ltd. Building Project
Address : Yuzhno,Sakhalin,Russia
Company : KENTZ GROUP OF IRELAND
Position : Instrument Commissioning Technician
Period : January 2007 – April 2007
Project Site : Exxon Neftigas Ltd. Onshore Project Facilities
Address : Chayvo,Sakhalin,Russia
Company : KENTZ GROUP OF IRELAND
Position : Instrument Commissioning Technician
Period : January 2006 – December 2006
Project Site: Qatar Fertilizer Company (QAFCO)
Address : Umsaid Industrial, Doha, Qatar
Company : DOHA ENGINEERING AND INSTRUMENTATION Co.
Address : P.O. Box 145 Doha Qatar
Position : Instrument Technician
Period : December 2004 – June 2005
Project Site : QATAR GAS (Shut-down Project)
Address : Ras Laffan Industrial City, Ras Laffan, State of Qatar
Company : MIDEAST CONSTRUCTOR’S WLL (MECON)
Address : Qatar Gas Train 3 (LNG), Ras Laffan Industrial City,
Ras Laffan, State of Qatar
Position : Instrument Technician
Period : April 2004 - May 2004
Project Site: Keilco llijan
Address : Ilijan, Batangas City
Company : I & E Industrial System Services, Inc.
Address : 76 Libjo, Takad, Batangas City
Position : Instrument Technician
Period : September 2003 - October 2003
Project Site : Saudi Aramco Rabigh Refinery
Address : Rabigh, K.S.A.
Project Site : Petrokemya
Address : Jubail, K.S.A.
Company : Hadi AI-Hammam Est.
Address : P.O. Box 3, Rahima 31941
Kingdom of Saudi Arabia
Position : Instrumentation and Electrical Technician
Period : March 2003 - September 2003
Company : I & E Industrial System Services, Inc.
Address : 76 Libjo, Takad, Batangas City
Position : Instrument Technician
Period : November 2002 - March 2003
Project Site : First Gas Power – Siemens Power Operation Inc.
Address : 1000 Megawatts Power Plant Project
Sta. Rita, Batangas City
Project Site : Steel Corporation
Address : Balayan, Batangas City
Project Site : Shell Philippines Exploration B. V. (SPEX)
Address : Pilipinas Shell Petroleum Corporation
Tabangao, Batangas City
Equipment Used:
HART communicator 475, 375,Fluke Multitester, Druck 610 Pressure Calibrator, Druck 603 Pressure Calibrator,BEAMEX MC5 Multifunctional Calibrator, PC6-15 Pressure Calibrator, HART Communicator 275, BUDENBERG Deadweight Tester, ARMATUREN Comparator, DRUCK Deadweight Tester, DRUCK DBC650 Temperature Dry Block Calibrator,DRUCK 725 communictor, ENDRESS & HAUSER Commulog Communicator, Fluke Multi-Tester
Duties & Responsibilities:
• Performing, Testing and commissioning of hydraulic valves with the coordination of Boardman on DCS console to obtained and confirmed of those I/O signals.
• Pre-commissioning, Testing and commissioning of Ballast pumps to the client as per Engineer/Supervisor’s schedule
• Performing of various maintenance activities on instrumentation and control system.
• Modification, implementation, testing and commissioning on Power Management System using PLC particular in the confirmation of those I/O signals.
• Involves in troubleshooting of process field instrumentation and automation faults, logic interlocks (intermediate & ESD system)
• Corrective & Preventive Maintenance of instrument at all Power Plant units/areas.
• Work on different units for trouble shooting of instruments faults/problem to process dept.
• Overhauling & calibration of transmitter ( flow, pressure , level , temperature )
• Pre-commissioning, Testing and Commissioning, Pre and Start-up and operation and maintenance on the systems and modules such as: Fire & Gas, Safety Instrumented System (SIS), Emergency Shutdown (ESD), Process Shutdown (PSD), Process Control System (PCS)
• Pre-commissioning, Testing and commissioning of HPU (hydraulic power unit)
• Perform of signal simulation and functional loop testing of field instruments with the coordination of Boardman on DCS console to obtained and confirmed of those I/O signals.
• Involves on the teams for plant shutdown, restoration, testing and commissioning and start-up.
• Preparation of drawings, ITR’s and as-built.
• Performing of control loop checking, calibration, recalibration, troubleshooting, verification, rectification, modification and simulation of various instrumentation and control instruments.
• Testing of fire alarm, smoke detector and heat protector
• Perform all the job, as advised by Supervisor and gave daily production reports.
• Perform loop checking and loop setting of Valve Air Ventilation(VAV) to the client as per Engineer/Supervisor’s schedule
• Loop checking/ loop testing/ functional and matrix testing of Air Handling Unit AHU) instruments such as pressure/temperature/flow transmitters/ switches.
• Responsibilities & Duties:
• Perform loop checking and loop setting to the client as per Engineer/Supervisor’s schedule.
• Perform wire checking of field instrument to junction box up to Control Room.
• Termination of instrument cables, transmitters, junction box cross connection on marshalling panels.
• Field instrument installation based on instrument location plan and Piping instrument diagram (P & ID).
• Perform wire checking of field instrument to junction box up to Control Room.
• Monitoring of all installed instruments in air compressor 1 &2 due to functional and matrix testing according to the command of engineering team in control room specially the condition of the turbine.
• Servicing and Calibrating of control valves.
• Bench Setting of actuators
• De Coupling of valves and calibration of possitioner.
• Servicing of SOVs, Boosters, Filters, Regulators and other accessories in control valves
• Perform loop checking and loop setting to the client as per Engineer/Supervisor’s schedule.
• Perform wire checking of field instrument to junction box up to Control Room.
• Termination of instrument cables, transmitters, junction box cross connection on marshalling panels.
• Validation/Calibration of process instruments, especially smart family transmitter, Foxboro, allen Bradley, honey well, Rosemount Transmitter like pressure temperature switches and gauges,masoneillan control valves.
• Calibration and stroking of control valves such as globe valve,masoneilan and fisher.
• Perform all the job, as advised by Supervisor and gave daily production reports.
• Field instrument installation based on instrument location plan and Piping instrument diagram (P & ID).
• Termination and installation of level switch on truck loading area. (granules)
• Termination and installation of vibration probe in gas compressor(first to sixth stage).
• Rendered services in the Maintenance and Process Units to perform Validation and Calibration of Instrumentation system Such as Transmitters and Control Valves installed in CDU, OCR and Plat former Unit.
• Loop checking of instrument controller, such as Honeywell, smart transmitter and control valves stroking and functional testing.
• Wire checking and continuity checking from instrument junction box to control panel.
• On site validation/ calibration PT, FT, LT and TT.
• Testing of fire alarm, smoke detector and heat protector.
TRAININGS
September 29, 30 and
October 2, 2008 : Basic Offshore Safety Induction and EmergencyTraining
(BOSIET)
Alert Disaster Control
Loyang Crescent, Singapore
April 18,2004 - : H2S & Breathing Apparatus Familiarization Course
April 20,2004 Mecon Recreation Area
Al Khor, Ras Laffan, State of Qatar
February 2, 2002- : Industrial Instrumentation Course
April 20, 2002 I & E Industrial Systems Services, Inc.
T.E.S.D.A.
November 8, 1992 - : On – the – Job Training at
May 11, 1993 M4 CONSTRUCTION
FCCU CALTEX REFINERY Poblacion, San Pascual, Batangas
Instrument Technician [Trainee]
EDUCATION
COLLEGE : Diploma of Technology
(1994) Major in Electronics
Pablo Borbon Memorial Institute of Technology
Presently [Batangas State University]
Batangas City
SECONDARY : Saint Theresa’s Academy
(1991) Presently [ Saint Theresa College ]
Bauan, Batangas
PRIMARY : Sta. Rita Elementary School
(1987) Sta. Rita, Batangas
CHARACTER REFERENCES
Fiscal Eliseo G. Lontok
Procecutor’s Office
Batangas City
Mr. Porfirio Pagsinohin Sr.
Clerk of Court
Municipal Trial Court in Cities
Batangas City
Attorney Meynardo Atienza
Attorney-at-Law
Poblacion, San Pascual, Batangas
PERSONAL DATA
Born on July 18, 1974 at Sta. Rita Batangas. City
Other Identification Data:
Weight :89kg.
Height : 5’ 7”
Civil Status : Married
Passport No. : XX2034978
SSS No. : 04-08540777
TIN No. : 189-582-432