Kashfia Haque
*** * *******, ********, ** *****
Phone: 818-***-****
Email:*******@*****.***
Objective
Seeking a challenging position in an organization where I can utilize my skills, experiences & hard work to open new avenues of success for me and for the team.
Summary of qualifications
3 years of construction management experience
Administrative support
Assistance to pre construction services
Estimating
Take offs
Plan distribution
Submittals,
Request for information (RFI’s)
Drafting skills with AutoCAD
Managing multiple projects
Subcontractor buyout
Computer literacy
Ability to communicate effectively
Preparing correspondence, reports
Education
The Master of Science in Construction Engineering & Management 2007
University of Southern California (USC) GPA 3.71/4.00
Bachelor of Architecture 2005
Bangladesh University of Engineering and Technology (BUET) GPA 3.39/4.00
Professional Experience
Project Engineer /Estimator 2007- 2010
Webcor Builders, 550 S. Hope St, Los Angeles, CA 90071
Projects managed:
USC Campus EVK Student Housing Renovation 2010
Los Angeles, CA
Project Value $600, 000
Project engineer for the renovation work, providing the improvement of the interior, mechanical, electrical and other services of the student residence building.
Supported project managers in negotiations, writing subcontracts with detailed scope letter of inclusions, exclusions & qualifications.
Performed detail quantity take-offs & assisted senior estimators in final budget preparation.
Reviewed & processed submittals, RFI’s.
Monitored the progress of each vendor to assure compliance with their contract
Updated daily Report
Coordinated meeting between different groups of the project.
Sunset Millennium z12
West Hollywood 2008-2009
Project Value $337 million
Assisted in the pre construction phase of the project which combined 59,483 gross square foot site area consisting of two structures. The east parcel is the site of two 9 stories hotels, and the middle parcel with 9 story condominium complex.
Prepared site logistic plans and monitored compliance with environmental mitigation requirements.
Performed takeoffs and assisted in budget preparation
Collected, organized, and conducts project related duties as assigned.
LA Live! Hotel & Residence
Down town, Los Angeles 2007-2008
Project Value $500 million
Assisted senior project manager in completing pre-construction phase of the tallest mixed use buildings in Downtown Los Angeles. Following a trend in urban development, the project mixes two hotels brands, offering a total of 1,001 keys (878 J.W. Marriott keys, 123 Ritz Carlton keys).
Documentation and scrutinizing work involved in pre construction.
Assisting bid analysis, pre-construction meetings and related award coordinating activities
Worked as bid analyst of the trades and evaluated vendor proposals ,assisted in subcontracts
Also Provide support to estimating department, including perform quantity take-offs and bid analyses for private and public construction projects; and review and analysis of contract drawings with subcontractors to ensure scope coverage and lowest price.
Project Coordinator
California Institute of Technology (Caltech)
Campus Planning: Architecture and Engineering facilities 2006-2007
Responsible for producing reports on archive plans and update a database
Prepared construction plans directed by the senior architects of the department.
Reviewed construction drawings to insure compliance with university guidelines.
Intern Architect
Desire Architects 2005
Prepared Architectural & Structural design plans using AutoCAD.
Assisted in the preparation of working drawings and CAD drafting
Assisted senior architects with updating existing plans and specifications
Computer Skills
Microsoft Office (Excel, Power Point, World)
Operating Systems: Windows 7/XP/ Vista Isqft, preconstruction management software
CMIC, construction database software AutoCAD
Primavera Project Planner for Scheduling Coral Draw
On Screen Takeoff (OST) Photoshop
Win Est pro Plus for Estimating Timberline
Honors & Awards
Graduated as top three of the class of 2005, Dean listed all four years in college.
4th year student project was exhibited & ranked among the top In the ARCH ASIA forum student exhibition in India, 2004
Completed OSHA 10 hour and 30 hour general industry training Course
Aiming to earn the LEED AP by this year.