Seeking full-time employment in the field of Plant/Operations/Program Management. Have extensive hands-on experience in the Engineering, Program and Launches, Quality and Manufacturing Management.
PERSONAL: Born August 19, 1972. Married. Trilingual (English-Spanish-German). Mexican citizen. International living experience in and out the United States.
EDUCATION: B.S. in Industrial Engineering.
Instituto Tecnológico Y de Estudios Superiores de Monterrey.
ITESM - Campus Tampico
Graduated December 1993
Manufacturing Systems Specialization Course
Instituto Tecnológico Y de Estudios Superiores de Monterrey.
ITESM - Campus Toluca
Graduated November 1998
SKILLS
PROFILE: Engineering: Time Studies, cost Analysis, Line Balancing, Ergonomics, Accounting, Plant Engineering, Production Engineering, Project Management, Quality Control, Systems Planning, Systems Engineering, Human Resources Management and Product Engineering.
Computer/Design: Word, Excel, Power Point, Harvard Graphics, Access, Visual Basic, AutoCAD, CATIA, MS Project, MINITAB 14, Baan, BPCS, SAP.
Other: GD&T’s, ISO/TS 16949, Advanced CATIA, Theory of restrictions, QS-9000, ISO 9000:2000 and ISO 14000 internal auditor, Leadership, Six Sigma Green Belt course, Lean Manufacturing course.
WORK EXPERIENCE: Bocar S.A. de C.V. – Automotive – Aluminum Casting parts
Projects Manager – Current (Nov. ‘11 – to date)
Main Achievements:
1.- Improve compliance to project budgets from 50% to 100%
2.- Improve new projects area performance from 73.8% to 97.6%
3.- Improve PCP methodology implementation from 50% to 83%.
4.- Savings on project budgets of $500,000 USD.
5.- 100% compliance to quoted mfg. rates, scrap. Rates & volume for new projects.
PWO de México S.A. de C.V. – Automotive – Stamped Parts
Process Planning & Projects Manager – 1 yr. 4 Months (Mar.’09 – Aug. ’10)
Main Achievements:
1.- 100% compliance to project budgets.
2.- Improve quotations accuracy from 72% to 98%.
3.- Development & implementation of quoting strategy to win a 15 Mio USD contract (VW Beetle NF & NMS)
4.- Development of planning and new project department.
5.- 12% profit achieved on new projects (Jetta NF, Beetle NF & NMS)
Elring Klinger Mexico, S.A. de C.V. - Automotive- Stamped parts.
2 yrs. 4 months – (Nov. ’06 – Feb. ’09)
Heat Shields Operations Manager
Main Achievements:
1.- Reduction of the setup time in 75% using SMED.
2.- Increase on the production volume in 27% without increase on labor or other resources.
3.- Reduction of the PPM's ration with customers in 60%
4.- Reduction of 35% of WIP using Kanban.
Quality and Customer Service Manager
Main Achievements:
1.- Accomplishment of external quality system audit with only 2 minor non conformances.
2.- Reduction of the customer concerns ratios on 60%.
3.- To obtain 1200 point in the Ford's SIM system to qualify for Q1.
Grupo Flextronics, S.A. de C.V. - Electronic – Metal Mechanical.
Operations Manager – 2 yrs. 2 months (Aug. ’04 – Nov. ’06)
Main Achievements:
1.- Reduction of the setup time by 38% using SMED.
2.- Implementation of Kanban Metodology in all production areas.
3.- Reduction of 25% of space usage by utilizing the following lean tools: VSM, 5S's, Kanban & Visual Management.
Areva T&D, S.A. de C.V. - Electrical – Metal Mechanic.
Manufacturing Manager – 3 yrs. 5 months (Mar. ’01 – Aug. ’04)
Main Achievements:
1.- Implemention of 6 Sigma methodology.
2.- Reduction of failure rate on medium voltage transformers from 37% to 5% using 6 Sigma methodology.
3.- Implementation of work cell concept and multi-products assy. lines.
Dura Convertible Systems: Automotive - Stamped Parts.
6 yrs. 11 months (May ’94 – Feb. ’01)
New Projects Manager
Main Achievements:
1.- Development of new projects department.
2.- Launch of Ford M205 project (Thunderbird)
3.- Prototypes development for New Beetle Cabrio Project
Manufacturing Engineering Manager
Main Achievements:
1.- New building construction & installation in a 6 months period.
2.- Transfer & start up of all manufacturing operations from the Michigan Facility to Mexico in 3 months. (9 Presses, 4 Welding robot, Powder coat painting line, 12 machining centers & 4 assy. Lines)
Information Systems Superintendent
Achievements:
1.- Implementation of finance software Platinum
2.- Development of tailor made MRP software for the company.
3.- Development and installation of T1 link with corporate HQ.
Manufacturing Superintendent
Product Engineer
Main Achievements:
1.- Implementation of electronic data collection system to statistically monitor the JX-27 assembly process.
2.- Achievement of a Cpk of 1.33 for the JX-27 convertible top.
Manufacturing Engineer
Main Achievements:
1.- Reduction of the total process cycle time from 220 mins to 45 mins.
2.- Elimination of 90% of WIP with new layout development.
Manufacturing Engineering Technician
Main Achievements:
1.- Development of assembly process for Chrylser’s JX-27 convertible Top
2.- Tooling and fixtures design for Chyrsler’s JX-27 project.
3.- Development of all process documentation.