CAREER OBJECTIVE:
Seeking professional perfection by optimizing my experience and skills through any challenging job
CAPABILITIES AND QUALIFICATIONS:
Designing many major units (new and revamp); Field studies and material take-off; Laying out plot plan, LCP, demo plan, and transposition; All kinds of pipe support details; Verifying line list and tie-in list; Checking Vendor and internal squad drawings; Locating utility stations, steam and condensate manifolds; Building all equipment, racks, and platforms; Checking ISOs and fixing all the problems; Communicating with different disciplines; Using laser scan software to enhance the accuracy of revamp work by checking location and dimensions; Filing FDCN, RFIC, to update the necessary change of the major document and database; Monitoring different offices to coordinate their progress, inquiries, and solving the problems; Field work experience – checking dimension and tie-in location
CAD SKILLS:
Expert in AutoCad, Facet Plan, PDS, PDS Drawing Manager, IsoGen and OrthoGen, Smart Plant Review, Trimble (Laser Scan), OK level on MicroStation and on Solidworks
EDUCATION:
Associate Degree in Mechanical Engineering, Northeast Institute of Technology (1997)
WORKING HISTORY:
FLUOR, Sugar Land, Texas (August 2009- October 2009)
TITLE: Piping Designer II
PROJECT NAME: Russian TANECO (Nizhnekamsk Refinery & Petrochemical)
TASK: Fixed all the problems in the drawing (checked by senior designers) in PDS model and generated the drawings through PDS Drawing Manager and OrthoGen
FLUOR, Sugar Land, Texas (March 2007 – August 2009)
TITLE: Piping Designer I
PROJECT NAME: DEEP CONVERSION PROJECT (TOTAL)
TASK: Designed two major new units: Cooling Water Tower and PSA from grass root to completing the large bore in solo, including field study, demo plot, plot plan, transposition, LCP, MTO, utility stations, and etc.; Built all the equipment, racks, sump, platforms, and piping; Remodeled the hot separator and re-piped it with the field sketches and checked with laser; Done many tie ins; Designed many steam tracing manifolds and stations; Built most equipment by checking with existing drawing, spec, project document, vendor data, and squad check drawing; Monitoring and cooperating the works between the different offices of New Deli and Port Arthur. Communicate with different disciplines; Filing FDCN, RFIC, and PLSR; Checking the laser scan to ensure the feasibility and quality of the revamp work
FLUOR, Sugar Land, Texas (November 2006 – March 2007)
TITLE: DRAFTER IV
PROJECT NAME: CORE Wood River Refinery Revamps/Restart, ConocoPhillips, Woodriver, Illinois
TASK: Calculated preliminary MTO; Checked ISO drawing; Designed piping for a new desalter; Revised equipment location plan to match PDS model; Created a tie-in location drawing; Checked line lists and tie-in lists
SHAW STONE-WEBSTER (August 2006 - November 2006)
TITLE: PIPING DESIGNER
PROJECT NAME: Propane Dehydrogenation Refinery
TASK: Designing underground piping; Preliminary MTO and valve dragging
LIAOHE OIL COMPANY, Panjin, China (June 2003 - January 2005)
TITLE: DRAFTER/DESIGNER
PROJECT NAME: Dawa Refinery Revamps
TASK: Drafted P&ID, plot plan, transposition, and ISOs; Calculated MTO and BOM; Made line list and tie-in list by checking line conditions and insulation; Designed piping supports and MPS; Field checked dimensions and tie-in locations
NORTHEAST ENGINEER COMPANY, Shenyang, China (December 1999 - June 2003)
TITLE: DRAFTER
PROJECT NAME: Tie-in project for Panshan refinery in Liaoning Province
TASK: Drew P&ID, plot plan, and ISO; MTO; Checked line list and tie-in list; Some preliminary piping design and support.