Post Job Free
Sign in

Engineer Project Manager

Location:
United States
Salary:
USD35000
Posted:
September 11, 2012

Contact this candidate

Resume:

RESUME

• NAME: CHE BAKAR BIN CHE SOH

• EMAIL: ******@*****.***.** ; ******@*****.***

• AGE: 38 YEARS

• RELIGION: ISLAM

• NATIONALITY: MALAYSIAN

• MARITAL STATUS: MARRIED

• NRIC: 740***-**-****(A2652227)

• D.O.BIRTH:28TH MARCH 1974

• HOBBIES: BADMINTON

• ADDRESS: NO.12 JALAN ANGGERIK EMAS 1,TAMAN ANGGERIK EMAS, 4300 BANDAR TEKNOLOGI KAJANG,KAJANG SELANGOR

• H/PHONE NO: 601*-******* /601*-*******/601*-*******(MALAYSIA PHONE NUMBERS)

• H/PHONE:964***********(IRAQ NUMBER)

EDUCATIONAL BACKGROUND

BAC.DEGREE IN CIVIL ENGINEERING (HONS) -(1995-1998) -UNIVERSITY PUTRA OF MALAYSIA

DIPLOMA IN CIVIL ENGINEERING (1992-1995)-UNIVERSITY TECHNOLOGY OF MALAYSIA

SIJIL PELAJARAN MALAYSIA (GRADE 2)-1991

SIJIL RENDAH PELAJARAN (10AGG.)-1989

REGISTERED WITH PROFESSIONAL BODIES

REGISTERED WITH INSTITUTION OF ENGINEERS (IEM) AS GRADUATES MEMBERS-(17TH JAN.2000)

REGISTERED WITH BOARD OF ENGINEERS (BEM) AS A GRADUATES ENGINEER-(16TH SEPT.1999)

PROFESSIONAL COURSES/TRAINING ATTENDED

• BUSINESS WRITING SKILLS ORGANISED BY OPUS TRAINING DEPARTMENT -(17 NOVEMBER 2008-18NOVEMBER 2008).

• TALK ON ASSET MANAGEMENT AND ASSET MANGEMENT PLANT” ORGANISED BY OPUS TRAINING DEPARTMENT -(05 NOVEMBER 2008)

• ESQ LEADERSHIP TRAINING(BASIC TRAINING) ORGANISED BY UEM ACADEMY -(29 OCTOBER 2008 -

31 OCTOBER 2008).

• A TALK ON “PROPOSED WIDENING OF THE EXISTING PENANG BRIDGE” ORGANISED BY OPUS TRAINING DEPARTMENT -(26 SEPTEMBER 2008)

• A TALK ON “IBS EXPERIENCE IN THE CONSTRUCTION OF UEM ACADEMY AND IBS CENTRE ORGANISED BY OPUS TRAINING DEPARTMENT -(04 SEPTEMBER 2008)

• REHABILATION OF KOLEJ YAYASAN UEM ORGANISED BY OPUS TRAINING DEPARTMENT -(22 AUGUST 2008)

• INTRODUCTION TO ALLIANCE CONTRACTING ORGANISED BY OPUS TRAINING DEPARTMENT -(15 JULY 2008).

• THE FIRE WARDEN TRAINING ORGANISED BY OPUS TRAINING DEPARTMENT -(12 JULY 2008).

• OHSAS 18001:1999 TO OHSAS 18001:2007 TRANSITION COURSE (OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEM) SEMINAR ORGANISED BY OPUS TRAINING DEPARTMENT- (01 JULY 2008).

• A TALK ON HOW TO ADMINISTER CONSTRUCTION CLAIMS ORGANISED BY OPUS TRAINING DEPARTMENT -(27 JUNE 2008).

• TALK ON FIRE PREVENTATION CLAIMS ORGANISED BY OPUS TRAINING DEPARTMENT -(13 JUNE 2008).

• NETWORK PAVEMENT CONDITIONS ASSESSMENT ORGANISED BY OPUS TRAINING DEPARTMENT -(16 MAY 2008).

• LANDSCAPE DESIGN APPROACH ORGANISED BY OPUS TRAINING DEPARTMENT –(14 MAY 2008).

• MECHANICAL CONSIDERATION IN DESIGNING BUILDING IN CYBERJAYA.

• CUSTOMER RELATIONSHIP MANAGEMENT 2ND PHASE(BLUE OCEAN STRATEGY) ORGANISED BY OPUS TRAINING DEPARTMENT –(24 MARCH 2008).

• A TALK ON SLOPE STABILITY’NMM-NORTHERN REGION EXPERIENCE ORGANISED BY OPUS TRAINING DEPARTMENT –(10 MARCH 2008).

• IT SECURITY AWARENESS BRIEFING ORGANISED BY OPUS TRAINING DEPARTMENT (02 NOVEMBER 2007).

• PRESENTATION BASIC SURVEY IN ENGINEERING OVERVIEW ORGANISED BY OPUS TRAINING (09 OCT. 2007).

• BRIEFING ON 1S09001,EMS14001 AND OHSAS18001 ORGANISED BY OPUS TRAINING DEPARTMENT (16 AUGUST 2007).

• CRM WORKSHOP ORGANISED BY OPUS TRAINING DEPARTMENT (13 OCTOBER 2006).

• PERFORMANCE MANAGEMENT WORKSHOP ORGANISED BY UEM ACADEMY(21 NOVEMBER 2006)

• BRIEFING FOR SIRIM COMPLIANCE AUDIT PREPARATIONS(ISO14001:200&OHSAS18001:1999 ORGANISED BY OPUS TRAINING DEPARTMENT (13 OCTOBER 2006).

• BRIEFING FOR SIRIM COMPLIANCE AUDIT PREPARATIONS(ISO14001:200&OHSAS18001:1999 ORGANISED BY OPUS TRAINING DEPARTMENT (15 AUGUST 2006).

• AN INDUCTION PROGRAMME ORGANISED BY OPUS TRAINING DEPARTMENT (11 AUGUST 2006)

• PERSONAL TRACK SAFETY COURSE(KTM038) l ORGANISED BY OPUS TRAINING DEPARTMENT (17 JULY 2006)

• PROFESSIONAL CORPORATE IMAGE ORAGANISED BY IKRAM TRAINING & INFRASTUCTURE DEVELOPMENT INSTITUTE - (17 NOVEMBER 2005)

• SEMINAR PERLAKSANAAN MS ISO 9001 AT JABATAN KERJARAYA TRENGGANU( 27 MAY 1999).

BRIEF WORKING EXPERIENCE

CHE BAKAR BIN CHE SOH IS A CIVIL ENGINEER WITH 15 YEARS WHICH HAS BEEN MAINLY FOCUSED ON THE PROJECT CONSTRUCTION MANAGEMENT,CONSTRUCTION SUPERVISION AND MONITORING AND SITE INSPECTION WORKS AND STRUCTURAL DESIGN WORKS. HE PRESENTLY ATTACHED AS A CIVIL ENGINER ( CIVIL & STRUCTURAL) AT PETRONAS CARIGALI IRAQ (PCIHBV) FOR THE CONSTRUCTION OF OIL AND GAS PROJECT LOCATED AT GARRAF,IRAQ.

LATEST & PREVIOUS EXPERIENCES

EMPLOYER NAME:PETRONAS CARIGALI IRAQ(PCIHBV)-DEVELOPER FOR OIL AND GAS PROJECT AT GARRAF,IRAQ

PERIOD: MID JULY2010 - PRESENT

POSITION: CIVIL & STRUCTURAL ENGINEER FOR THE OIL AND GAS PROJECT AT GARRAF,IRAQ

Organizing and phasing of the duties of all the site staff (all trades/ disciplines) such as civil works, pipe lines and etc.

Co-ordination liaison with all project contractors,(EPCC and EPC)

Checking, coordinating and approved construction drawing issued by contractor’s consultant.

Supervision and coordination of site works.

Certifying interim claims by the contractor.

Liaison with South Oil Company (owned by Iraq government) regarding to the all issues related with the oil and gas construction.

1. . EMPLOYER NAME:JURUTERA PERUNDING REKACEKAP SDN BHD-(CIVIL & STRUCTURAL ENGINEERING CONSULTANT)

PERIOD: NOVEMBER 2009-MID JULY 2010

POSITION: RESIDENT ENGINEER (C&S)

a. NOVEMBER 2009-JULY2010- RESIDENT ENGINEER (C&S) AT JURUTERA PERUNDING REKACEKAP SDN BHD FOR THE CONSTRUCTION OF AIR STATION AND RELATED INFRASTRUCTURES AND BUILDINGS FOR AGENSI PENGUATKUASAAN MARITIM MALAYSIA,SUBANG JAYA.

Organizing and phasing of the duties of all the site staff of all trades.

Co-ordination liaison with all project consultant.

Checking and coordinating construction details issued by all consultant.

Supervision and coordination of site works.

Certifying interim claims by the contractor.

Liaison and make necessary arrangement for interim inspection by authorities.

Attending site/client consultant meetings.

3. EMPLOYER NAME: OPUS INTERNATIONAL (M) BHD PROJECT MANAGEMENT COMPANY)

(SUBSIDIARIES OF UEM WORLD BHD)

PERIOD: 03 JULY 2006-OCTOBER 2009

POSITION: PROJECT/SITE ENGINEER(C&S)

a. (01 0CTOBER 2007- OCTOBER 2009)-PROJECT ENGINEER AT OPUS INTERNATIONAL (M) BHD-ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SENTUL TO BATU CAVES.

b. (03 JULY-30 SEPT. 2007)-PROJECT ENGINEER AT OPUS INTERNATIONAL (M) BHD (Ace Vector Sdn Bhd)-ELECTRIFIED DOUBLE TRACK PROJECT RAWANG TO IPOH.

WORKS INVOLVED AS PERLISTED BELOW:

ASSIST HEAD OF CONSTRUCTION/SECTION MANAGER AND PROJECT MANAGER IN SITE MONITORING,SITE SUPERVISION AND SITE INSPECTION WORKS INVOLVING INFRA WORKS, CIVIL WORKS, HALTS, BUILDINGS, BRIDGES AND ROAD WORKS AND ENSURING THAT THE CONSTRUCTION WORKS COMPLY WITH THE S.O.N(STATEMENT OF NEEDS@PROJECT BRIEF),B.Q(BILLS OF QUANTITY,SPESIFICATION OF WORKS,APPROVED CONSTRUCTION DRAWINGS,SCHEDULE AND OTHER SET CRITERIA.

ATTEND AND WITNESS SLUMP TEST, CUBE TEST TO ENSURE STRENGTH OF CONCRETE ALWAYS IN ORDER.

PREPARE DAILY/ WEEKLY REPORT AS PART OF QA & QC ITEMS.

LIASE WITH OTHER DEPARTMENTS (ARCHITECT & MECHANICAL ) TO ENSURE HANDING OVER PROCESS OF BUILDINGS/STATIONS/HALTS IS SMOOTHLY CARRIED OUT.

LIASE WITH SYSTEM DEPARTMENT TO ENSURE THE GRADES OF OCS MAST CONCRETE MEET THE REQUIRED QUALITY.

MEMBER OF THE QA & QC MEETING FOR THE SENTUL TO BATU CAVES STATION ELECRTIFIED DOUBLE TRACK PROJECT.

ASSIST KTMB (END USER) TO PREPARE THE RELEVANT RECOVERY MATERIAL FORMS AND TO ENSURE THE PROCESS OF HANDING OVER OF ROCOVERY MATERIALS IS SMOOTHLY CARRIED OUT.

CONDUCT RANDOM INSPECTION FOR THE INFRASTRUCTURE WORKS, CIVIL WORKS, HALTS, BUILDINGS, BRIDGES AND ROAD WORKS.

TO REVIEW AND COMMENTS THE METHOD STATEMENT AND CONSTRUCTION DRAWINGS PROPOSED/SUBMITTED BY MAIN CONTRACTOR WITHIN TIME REQUIREMENT.

SUPERVISION AND MONITORING WORKS FOR R.C WALL AND FOUNDATION WORKS (MICRO PILES,BORED PILES,SPUN PILES, RC PILES INSTALLATION, STRIP FOOTING AND PAD FOOTING).

SOIL TESTING (FIELD DENSITY TEST).METHOD OF TESTING THAT ARE APPLY AT SITE SUCH AS CORE CUTTER METHOD, SAND REPLACEMENT & SPEEDY TEST.

ATTEND AND WITNESS SLUMP TEST, CUBE TEST TO ENSURE STRENGTH OF CONCRETE ALWAYS IN ORDER

FOR CUBE TEST FAILED -REBOUND HAMMER, WINDSOR PROBE TEST & CORING TEST)

ATTEND MEETING WITH MAIN CONTRACTOR, CONSULTANT AND CLIENT.

TO INFORM/REMIND MAIN CONTRACTOR VERBALLY,MEMO’S OR LETTER IF ANY MISTAKE IN CONSTRUCTION ACTIVITIES IDENTIFIED AT SITE.

SUBMITTED WEEKLY PROGRESS REPORT TO OPUS INTERNATIONAL (M) BHD (HQ) REGULARLY.

CERTIFIED DAILY REPORT PREPARED BY MAIN CONTRACTOR.

TO CHECK, EVALUATE AND CERTIFIED PROGRESS CLAIMS PREPARED BY MAIN CONTRACTOR.

TO ENSURE THAT THE CONTRACTOR ALWAYS FOLLOWS STATEMENT OF NEEDS(SON),APPROVED CONSTRUCTION DRAWING,BQ AND SPESIFICATION OF WORKS IN THEIR WORKS.

4. EMPLOYER NAME: KUMPULAN IKRAM PROJECT OR KIP Management SDN BHD PROJECT MANAGEMENT COMPANY)

(SUBSIDIARIES OF PROTASCO BHD)

PERIOD :03 APRIL 2000-30 JUNE 2006

POSITION: PROJECT/SITE ENGINEER(C&S)

TO ASSIST PROJECT MANAGER IN PROGRESS SITE MONITORING,SITE SUPERVISION AND SITE INSPECTION WORKS INVOLVING INFRA WORKS, CIVIL WORKS, BUILDINGS AND ROAD WORKS AND ENSURING THAT THE CONSTRUCTION WORKS COMPLY WITH THE S.O.N(STATEMENT OF NEEDS@PROJECT BRIEF),B.Q(BILLS OF QUANTITY,SPESIFICATION OF WORKS,APPROVED CONSTRUCTION DRAWINGS,SCHEDULE AND OTHER SET CRITERIA. .

a. (16TH JANUARY 2006-30TH JUNE 2006)-PROJECT /SITE ENGINEER AT KLUANG HOSPITAL PROJECT (PHASE 1 )

WORKS INVOLVED AS PERLISTED BELOW:

EARTH WORKS SUPERVISION AND MONITORING WORKS

SUPERVISION AND MONITORING WORKS FOR RETAINING STRUCTURE (INCLUDING REINFORCED EARTH, STONE COLUMN METHOD COMPLETED WITH PLATE BEARING TEST FOR REINFORCED SOIL STRUCTURE.

SUPERVISION AND MONITORING WORKS FOR R.C WALL AND FOUNDATION WORKS (SPUN PILES, RC PILES INSTALLATION, STRIP FOOTING AND PAD FOOTING).

FOUNDATION WORKS-STATNAMIC TEST,PDA TEST, STATIC LOAD TEST, PILES INTEGRITY TEST & WELDING TEST FOR RC PILES INSTALLATION.

ATTENDED MEETING WITH MAIN CONTRACTOR, CONSULTANT AND CLIENT.

TO INFORM/REMIND MAIN CONTRACTOR THROUGH VERBAL,MEMO’S OR LETTER IF ANY MISTAKE IN CONSTRUCTION ACTIVITIES IDENTIFIED AT SITE.

SUBMITTED WEEKLY PROGRESS REPORT TO KIP Management SDN BHD (HQ) REGULARLY.

CERTIFIED DAILY REPORT PREPARED BY MAIN CONTRACTOR.

TO CHECK, EVALUATE AND CERTIFIED PROGRESS CLAIMS PREPARED BY MAIN CONTRACTOR.

b. (01 JANUARY 2005-15 JANUARY 2006)-ENGINEER AT KIP Management SDN BHD (HQ).

c.(01 AUGUST 2004-31 DECEMBER 2004)-ASSISTED PHD RESEARCHCER FROM PUBLIC WORKS DEPARTMENT(PWD) TO SUPERVISED GEOPIER INSTALLATION AT GEBENG,KUANTAN (THE PROJECT CONTRACT IS UNDER IKRAM GEOTECHNIC SDN BHD (SUBSIDIARIES OF PROTASCO BHD).

d. (01 AUGUST 2001-30 JULY 2004)-PROJECT / SITE ENGINEER AT THE PROPOSED PROJECT OF NEW MUADZAM SHAH POLYTECHNIC.

e.(03 APRIL 2000-30 JUNE 2001)- PROJECT / SITE ENGINEER FOR THE CONSTRUCTION OF TEACHER QUARTERS PROJECT AT ALAM DAMAI AND BANDAR PERMAISURI CHERAS,KUALA LUMPUR.

WORKS INVOLVED:

`

INSPECTION WORKS.

JOINT INSPECTION WITH CONSULTANT RESIDENT ENGINEER(C&S) TO CHECK AND SUPERVISE LEVEL, FOUNDATION WORKS (PILING WORKS-DEEP FOUNDATION, FOOTING-SHALLOW FOUNDATION), R.C WORKS & OTHER RELEVANT MATTERS AT SITE.

ATTEND MEETING WITH MAIN CONTRACTOR, CONSULTANT AND CLIENT.

TO INFORM/REMIND MAIN CONTRACTOR VERBALLY, MEMO’S OR LETTER IF ANY MISTAKE IN CONSTRUCTION ACTIVITIES IDENTIFIED AT SITE.

SUBMITTED WEEKLY PROGRESS REPORT TO KIP Management SDN BHD (HQ) REGULARLY.

CERTIFIED DAILY REPORT PREPARED BY MAIN CONTRACTOR.

CERTIFIED PROGRESS CLAIMS BY MAIN CONTRACTOR.

TO ENSURE THAT THE CONTRACTOR ALWAYS FOLLOWS STATEMENT OF NEEDS (S.O.N),APPROVED CONSTRUCTION, DRAWING,BQ AND SPESIFICATION OF WORKS IN THEIR WORKS.

I.WITNESSED ALL TESTING DONE AT SITE/LABRORATORY INCLUDING:

REIFORCEMENT BARS TESTING,WELDING JOINTING FOR STEEL STRUCTURE WORKS,SOIL TESTING (FIELD DENSITY TEST).METHOD OF TESTING WHAT WE APPLIED AT SITE SUCH AS CORE CUTTER METHOD, SAND REPLACEMENT & SPEEDY TEST.

FOUNDATION WORKS-PDA TEST, STATIC LOAD TEST, PILES INTEGRITY TEST & WELDING TEST FOR RC PILES INSTALLATION.

STRUCTURE WORKS (SLUMP TEST, CUBE TEST)

FOR CUBE TEST FAILED -REBOUND HAMMER, WINDSOR PROBE TEST & CORING TEST).

INFRA (ROAD WORKS)-FIELD DENSITY TEST, CBR TEST & CORING TEST.

5. EMPLOYER NAME: HUBUNGAN RAYA TRENGGANU CONSTRUCTION SDN BHD (MAIN CONTRACTOR)

PERIOD:01 JANUARY 1999-30 MARCH 2000

POSITION: PROJECT/SITE ENGINEER(C&S)

WORKS INVOLVED:

PROGRESS MONITORING

PREPARED PROGRESS REPORT INCLUDING(S-CURVE, GANTT CHART AND ETC) & DAILY REPORT.

ATTENDED EVERY INSPECTION WITH KEMAMAN PWD ENGINEER (BUILDING ENGINEER).

ATTENDED MEETING WITH PWD & CLIENT REPRESENTATIVES (HEALTH MINISTRY).

FULL TIME SITE MONITORING ACTIVITIES.

6. EMPLOYER NAME: BRADNY CONSULTANT SDN BHD CIVIL & STRUCTURAL CONSULTING ENGINEERS)

PERIOD:(15 MARCH 1998-31 DECEMBER 1998

POSITION: STRUCTURAL DESIGN ENGINEER(C&S)

WORKS INVOLVED:

BUILDING STRUCTURE DESIGN INCLUDING ROOF, SLAB, COLUMNS, BEAMS AND FOUNDATION DESIGN.

DESIGNED AND SUPERVISED TNB SUBSTATION (2 STOREY) FOR KOPERASI POLIS KG ATTAP KUALA LUMPUR.

II.PRACTICAL TRAINEE IN STRUCTURAL DESIGN AT BRADNY CONSULTANT SDN BHD-6 MONTHS

BUILDING STRUCTURE DESIGN INCLUDING ROOF, SLAB, COLUMNS, BEAMS AND FOUNDATION DESIGN.

CURRENTLY SALARY: USD 13000+USD6500(allowances)

EXPECTED SALARY:USD35,000 +USD5000(Allowances)

REFERENCES:

NAME : MR.MD. ALI BIN MD HASSAN(440*********)

ADDRESS: NO.22 TAMAN RIVERIA PERDANA

BATU 7,SIJANGKANG SEMPADAN

42500 KLANG,SELANGOR

H/PHOHE:019-*******,SITE OFFICE:03-62591589, HEAD OFFICE:03-76272788

POSITION:SAFETY AND HEALTH MANAGER

COMPANY:OPUS INTERNATIONAL (M) BHD

EMAIL:*****.********@*******.******.***

NAME: MR.DZULKIFLI BIN TAIB

ADDRESS:JALAN 1/18B KAMPUNG BATU

BATU 5 OFF JALAN IPOH

51200 KUALA LUMPUR

H/PHONE:019-*******, SITE OFFICE:03-62591589, HEAD OFFICE:03-76272788

POSITION:HEAD OF CONSTRUCTION (PMC)

COMPANY : OPUS INTERNATIONAL (M) BHD

EMAIL: *********.****@*******.******.***



Contact this candidate