Post Job Free
Sign in

Technician Mechanical

Location:
Las Vegas, NV, 89147
Salary:
11.00
Posted:
August 11, 2010

Contact this candidate

Resume:

SHAWN J MAHONE

**** *. ******** ** *** ****

Las Vegas, NV 89147

Cell# 707-***-****

Email: *******@*****.***

Summary of Qualifications: My work experience relating to Manufacturing/Production with these Companies has enabled me to achieve the skill level to productively accomplish the task directed. Achieving 15 years of related experience in Industrial/Manufacturing production and Safety procedures gives me the awareness and knowledge of OHSA Safety regulations.

Work Experience:

Blend Technician

Employer: Nor-Cal Beverages 2286 Stone Blvd West Sacramento, Ca 95691

Hire Date: August 18th 2008-April 23rd 2009

Duties: Blending Juices, Teas, and Energy Products to their desired specifications. Creating set-ups for each product that is to be blended while keeping a clean and safe work area. Daily duties were checking water readings and the chemical analysis of the Water system. This also included sanitizing the blending tanks to ensure the proper level of sanitation

Blend Technician:

Employer: CocaCola/Amcan Beverages

Date: August 20th 2007-August 9th 2008

Duties: Blending Juices, Teas, and Energy Products to their desired specifications. Creating set-ups for each product that is to be blended while keeping a clean and safe work area. Daily duties were checking water readings and the chemical analysis of the Nano system. This also included sanitizing the blending tanks to ensure the proper level of sanitation.

Blend Technician

Employer: Spherion/Amcan Beverages

Dates: May 23rd 2007-August 19th 2007

Duties: Blending variety of beverage products and by measuring and weighing the correct amount of ingredients required.

Production Specialist/Parts clerk, Receiving clerk:

Employer: Owens Corning/Cultured Stone, Napa CA

Dates: November 16th 2004-June 3rd 2007

Duties: Produce and construct boxes for the Master molds; also spraying fiberglass on the molds then to insert foam/using foam injector for final product. Then inserting air to lift molds of Master; and doing any additional work needed

to complete the finished product. Perform inventories on stock items, stocking of

Received parts and placing in the system.

Mechanical tech/Masonry setup technician

Employer: Fibrebond Inc. 299 Beck Ave. Fairfield, CA

Dates: October 30th 2000-June 23rd 2003

Duties: Construction of prefabricated modules for telecommunication companies such as; Cingular, Nextel, and Verizon. Following detailed blueprints, cutting rebar for each building, assembly of floors and walls, and making mechanical installs and measuring.

Batchmaker:

Employer: MLO Products, 2345 Watney Way, Fairfield, CA

Dates: October 8th 1997-June 15th 1998

Duties: Weighing and Measuring of Items needed for each product. Following formulas in order to make proper protein dry shakes and health bars. Set up extruders for extraction of the product; and to perform maintenance on different machines. Also properly weighing of product from extruder and labeling as well as sanitation.

Production Worker:

Employer: Chrysler Foundry, Indianapolis, IN.

Dates: October 31st 1988-March 15th 1993

Duties: Assembly line worker which prefab engine block for the machine plant in Detroit.

Reference: Available upon request



Contact this candidate