Post Job Free
Sign in

Project Management Engineer

Location:
Japan
Posted:
October 19, 2010

Contact this candidate

Resume:

Dela Cruz-Crystal, Iris (Updated: ** Nov ****)

Lanesca Apartment D, Binayuyo,Catmon, Bulacan, Bulacan 3022, Central Luzon, Philippines.

Email: **************@*****.*** Tel: 092********(Mobile)

Employment History

1. Philippine Batteries Inc.(Motolite)

Aug 2006 - Present

Position Title (Level) : Industrial Engineer Supervisor ( Supervisor / 5 Yrs & Up Experienced Employee )

Specialization : Engineering - Industrial

Role : (not provided)

Industry : Manufacturing / Production

Work Description : RESPONSIBILITIES:

*Supervise, direct and review workload of Industrial Engineers in accordance with the expected deliverables of the team.

*Interface with other departments and affiliate companies to ensure timely delivery of the teams commitments.

*Provide support, guidance and act as adviser to Industrial Engineers for IE-related issues.

*Review reports of Industrial Engineers like time study, work sampling study, lay out study, projects and other similar activities to ensure data accuracy.

*Determine and enhance manufacturing processes, manpower requirements, time standards and production standards using motion and time study, statistical methods and mathematical calculations.

*Coordinate with production units to resolve production problems, maximize product reliability and minimize cost.

*Review production line capacity to determine plant performance and capability.

*Study operations sequence, material flow and operators performance to enhance production line productivity and efficiency.

*Conduct plant layout studies for equipment, materials and workspace for maximum space utilization.

*Identify opportunities for improvement, initiate action plans and recommend solutions to enhance line productivity and efficiency.

EXPERIENCES GAINED:

*Pioneer the set-up of Industrial Engineering Team in current company.

*Pioneer the set-up of lean manufacturing transformation in current company.

* Experience in handling projects for business process

reengineering, process and systems improvement, cost

reduction, capacity planning and productivity and

efficiency improvement.

* Experience in handling a team of 4 Plant Industrial Engineers.

* Experience in effective communication and

presentation of ideas, projects or concepts.

*Experience in preparing financial and business reports of the plant.

2. Wistron Infocomm Phils.Corp.(formerly Acer)

Apr 2000 - Aug 2006

Position Title (Level) : Industrial Engineer ( Supervisor / 5 Yrs & Up Experienced Employee )

Specialization : Engineering - Industrial

Role : (not provided)

Industry : Manufacturing / Production

Work Description : RESPONSIBILITIES:

* To improve production line productivity and production

operators' efficiency through project studies.

* To implement cost reduction measures through project

studies.

* To facilitate team improvement and development.

EXPERIENCES GAINED:

* Experience in handling projects for business process

reengineering, process and systems improvement, cost

reduction, capacity planning and productivity and

efficiency improvement.

* Experience in handling a team of 4 Industrial Engineers.

* Experience in effective communication and

presentation of ideas, projects or concepts.

ACCOMPLISHMENTS:

* Worked with IT team about the automation of

operator’s hourly performance, 2006.

*Prepared the line set up, manpower arrangement and cost analysis of PDA models’ transfer from sister company in China to Philippine-based company, 2005.

* Streamlined production line cycle time for a savings of

US$ 145,133 , 2005.

* Identified work hazards base on Occupational Health

and Safety standards, 2005

* Streamlined production line cycle time for a savings of

US$ 30, 779 , 2004.

* Reduced 30% of labor cost due to manpower

maximization, 2004.

* Reduced 40% of fixture cost due to recycling

implementation, 2004.

* Increased the line productivity by 15% due to line

improvement project, 2003.

* Headed the installation of high-tech softwares for work

efficiency of IE’s, 2002.

Educational Background

Bachelor's/College Degree of Engineering (Industrial)

Graduation Date: 2000

Major : Industrial

Institution/College : Saint Louis University, Philippines

CGPA : 80/100

- of -

Graduation Date: N/A

Major :

Grade : -

Skills

(Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just started using or learning the skill)

Proficiency Skill (Years of Experience)

Advanced Capacity Planning (>5) , Semicon/NB/PDA Experience (>5) , Technical Writing Skills (5) , Operation and Systems Analysis (5) , Motion Economy and Time Study (5) , Project Management (5) , Management Skills (5) , Productivity Analysis and Improvement (5) , Training Skills (5)

Intermediate Value Stream Mapping (2)

Languages (Proficiency: Best=10 - Worst=1)

Language Spoken Written

English 10 10

Filipino 10 10

Personal Particulars

Age : 33

Date of Birth : 29 Oct 1977

Nationality : Philippines

Permanent Residence : Philippines

Gender : Female

Marital Status : Single

Preferences

Willing to Travel : Yes

Willing to Relocate : Yes

Possess Own Transport : No

Availability : Immediately after notice period of 1 month(s)

Miscellaneous

Additional Information : CAREER OBJECTIVE:

* A managerial or supervisory position dealing with process improvement, productivity improvement, project management and business process reengineering.

SUMMARY OF QUALIFICATIONS:

* Knowledge of lean manufacturing set-up.

* Extensive experience in Manufacturing Systems, Project Management (Business

Process Reengineering, Productivity and Efficiency Improvements and Cost

Reduction Projects)

* 8 years of leadership experience as IE Supervisor.

* 8 years of experience in conducting training.

* Authors company procedure base on ISO requirements

TRAININGS:

* Lean Manufacturing, 2008

(Lean Thinking, Value Stream Mapping, Inventory Management)

* Factory Physics, 2008

* Dale Carnegie Training, 2007

* Cost of Quality Training, 2006

* Occupational Health and Safety, BVQI, 2005.

* Trainers Training Part 2, Wistron Corporation-Philippines, 2005

* Manufacturing Systems, Wistron Corporation-Taiwan, 2004

* Basic IT Skills, Wistron Corporation-Philippines, 2003

* Project Management Training- Asia Business Consultancy, 2003

* English Proficiency Training- Prof. Mallari, 2002

* Customer Satisfaction Training, Wistron Corporation-Taiwan, 2002

SUMMARY OF SKILLS:

Project Management Skills

* Set-up lean manufacturing transformation, 2008-present.

* Set up PDA line by capacity planning, line layout and cost computations, 2005.

* Streamlined production line cycle time for a savings of US$ 10,705.5, 2005.

* Identified work hazards base on Occupational Health and Safety standards,

2005

* Streamlined production line cycle time for a savings of US$ 30, 779 , 2004.

* Reduced 30% of labor cost due to manpower maximization, 2004.

* Reduced 40% of fixture cost due to recycling implementation, 2004.

* Increased the line productivity by 15% due to line improvement project, 2003.

* Headed the installation of high-tech softwares for work efficiency of IEs, 2002.

Leadership Skills

* Managed a team of 4 junior industrial engineers, including daily work

assignments, 2000-present

* Conducted performance appraisal of team member, when needed

2000-present

* Facilitated team development and conflict resolution, when needed

2000-present

* Conducted hiring, when needed 2002-present.

Training Skills

* Trained new production operators during new product pilot run, 2000-present

* Trained new industrial engineers, 2000-present

* Trained other engineering departments for job enrichment, 2000-present

Technical Writing Skills

* Authored company procedure base on ISO, 2001-present

* Editor of company newsletter, 2004-present

Technical Skills

* Prepared capacity planning of production, 2000-present

* Conducted motion and time study for work efficiency analysis, 2000-present

* Prepared work instruction of production operators, 2000-present

* Conducted studies on process improvement, 2000-present

* Conducted studies for line productivity and efficiency improvement,

2000-present

* Prepared monthly cost reduction report, 2004-present



Contact this candidate