PROJECT SUPERINTENDENT Walsh Construction/Walsh Group

Whiteman AFB Replace Family Housing 5/09 – 5/10

Contract W912DQ-08-C0015 Value $36,692,695.00

- Project Description: Demolish 370 residential units, complete of infrastructure, replace with 360 residential units, infrastructure and all supporting amenities.

- Responsibilities: Monitor all trades for safety compliance with Em385 1.1, OSHA and the Walsh Safety manual. Review schedules, daily, and notify any contractor of non compliance. Monitor all phases of quality control, assist QC dept. with trade technical RFI’s Update redline drawings, update drawings with all ASI directives and notify all effected parties. Hold weekly meetings with ACOE and Sub contractors. Maintain a clear working knowledge of all contract documents – RFP, ASIs, RFIs, and all contract buyouts through closeout.

PROJECT SUPERINTENDENT Archer Western Contractors/Walsh Group

BCT Complex Increment 2 Fort Lewis 3/08 – 5/09

Contract W912DW-07-C-0025 Value $111,405,576.00

- Project Description: Walsh Group was the prime sub working with Alutiiq International. As such we handled all production field issues with no site civil. The project consisted of 3 Battalion HQ, 1 Brigade HQ, 2 Company Operating Facilities (COF) and 1 Enlisted Personal Dining Facility (EPDF)

- Responsibilities: Monitor all trades for safety compliance w/ Em385 1.1, OSHA, and the Walsh Safety manual. Review daily schedules and notify contractors of non compliance. Monitor all phase of quality control, Identify errors busts and constructability issues in advance, assist QC dept w/ trade technical RFI’s. Update redlines, update drawings with all ASI directives and notify all effected parties. Conduct weekly meetings with ACOE and Sub contractors coordination meetings. Maintain an absolute working knowledge of all contract documents – RFP, ASIs, RFIs, and all contract buyouts through closeout. Manage all aspects of in house labor. Work closely with MEP QC on TAB through commissioning.

PROJECT SUPERINTENDENT Bristol Construction Services

F-22 Lo Maintenance Spray booth Hanger 10/07 – 02/08

Elmendorf AFB Contr. DACA85-02-D-0014 Value $28,456,000.00

- Responsibilities: Assuming all site superintendent duties awaiting the arrival of the permanent replacement superintendent. I was not available due to my prior commitment to the BCT complex at Fort Lewis with Walsh Group.

PROJECT SUPERINTENTDENT Bristol Construction Services

Off Crew Administration Building (Addition) 5/06 – 10/07

Naval Sub Base Kitsap Contr. N44255-06-C-2105 Value $4,235,026.00

- Project Description: 22,000 Sq Ft addition to an operational Admin Building, the purpose to house off crews of the Trident Fleet.

- Project Challenges: Coordinating outages 30 days in advance without fail. IE-mass notification, fire suppression, communications and alarms.

Responsibilities: Monitor trades for safety compliance w/ Em355 1.1, OSHA,

and Bristol Safety manual. Daily schedule reviews and contractor compliance as needed. Update drawings with all ASI directives and notify all effected parties. Conduct weekly meetings with NAVFAC (ROICC) and Sub contractors to coordinate work. Maintain clear working knowledge of all contract documents – RFP, ASIs, RFIs, and all contract buyouts through closeout.

PROJECT MANAGER OSO Construction

Submarine Base Bangor Kitsap 10/05 – 4/06

Value $1,353,023.00

- Project Description: Framing contract, 54 replacement residential units (privatization project).

- Responsibilities: Contracted with OSO for six months as a consultant to establish operational procedures in a military setting.

PROJECT MANAGER Porter Construction

Seattle, WA 7/04 – 9/05

Project Description: providing envelope remediation in the world of post litigation on behalf of homeowners associations. 50% of the projects are self perform

GENERAL SUPERINTENDENT Parsons Construction

Ellsworth Air Force Base 4/ 03 6/ 04

Contract #W9128-04-D-007 Value $15,236,000.00

- Project Description: Demolish 212 existing units/including infrastructure.

Design -build 186-replacement units/same site – infrastructure to buy out.

- Responsibilities: Insured site compliance with EM385 1.1 Assist in creation of sub contractor bid packages. Reviewed contracts to ensure no gaps/overlaps pre release by PM. Monitored sub contractor progress, quality control and timelines. Conducted weekly meeting w/ Air Force and Army Corp of Engineers. Maintained clean copy of as builds and redlines. Maintained daily logs. Managed 30 man self-performing concrete crew.

FIELD SUPERINTENDENT Sundt Construction

Fort Lewis 7/00 – 3/03

- Project Description: Oversee fast tract 30-day remodels, of existing multi family units. 120 units per 6 month contract. Schedule contractors, QC all work performed. Maintain daily log reporting on all work.

Naval Air Station, Whidbey Island Sundt Construction

Contract N68711-99-6653 Value 15,795,716

- Project Description: Aid PM in timely close out of 112 replacement navy family housing units. Worked closely with QC and ROICC QA managed subcontractors in timely correction of work deemed deficient. Devised team approach to final walk through with ROIC owners by taking a punch crew on final this resulted in 99% expectance at final.

CARPENTER FORMAN Silver Cloud Inns

Silver Cloud Hotels multi store expansion project. Was charged with the oversight of all concrete form work, reporting to the superintendent, working with pile bucks on placement of sheet pile, tying of Steele cages for placed pile. Placement and layout of PT cables and ultimately one of three layout men for 3-4 story wood frame buildings built on top of PT decks.

General Superintendent DLP ASSOC INC

DLP is a Small commercial and residential developer operating on the Olympic peninsula in Washington State. I ran their work from public hearing through buy out.

Special Qualifications:

CQM Qualified Army Corp of Engineers since 1999

Maintain current OSHA 30 hour

Journeyman Carpenter

Journeyman Roofer

Current CPR Card

Current Defibrillation



Contact this candidate