EXPERIENCE SUMMARY
General Project Controls
• Supervise and train Project Controls personnel
• Provide Administrator duties for Primavera Enterprise (PE) Scheduling program
• Create and maintain Scheduling Procedures and Guidelines
• Develop scheduling processes and schedule templates – including EPS, OBS, WBS and coding structures
• Integrate Multiple Vendor Schedules into a master schedule
• Create Schedules from Estimates and Conceptual Drawings up to Completed Design through Construction and Start-up
• Schedule Maintenance Duties – Activity Updates, Layouts, Filters, Resources, Imports, Exports, Backups, User Access Rights and Coding Dictionaries
• Create Schedule Reports – Daily, Weekly, Monthly, Status Update, What If, Variance, Resource Historgrams, Gant Charts, Pert Charts, Earned Value …
• Schedule Analysis – CPM, Activity Variances, Work Constructability, Space Coordination, Resource Leveling/Forcasting, SPI, CPI and Earned Value
• Chair Meeting with Client, Sub-Contractors, Foreman and Superintendents
• Field Walk Downs and Quantity Tracking
• Create Presentations – Everything from Wall Posters with graphics and charts to a web meetings on a Smart Board
• Preparation of Bid Proposals
Other
• Maintenance Procedure Writer
• Mechanical Test Engineer
• Create Maintenance Work Packages for Modifications, CM and PM
Major Projects
Energy/Utilities
Nuclear Power
• Refueling Outages
• New Construction & Start Up
• Ice Condenser Melting and Reload
• Forced Outages
• Steam Generator Replacement
• Heat Exchanger Retube
• 12 Week Online Rolling Schedule
Fossil Generation
• Flue Gas Expansion Joint Replacement
• Forced Outages
• Boiler Maintenance Outages
• Flue Gas Air Pre-heater Replacement
• SCR
• FGD Wet Scrubber
• Electrostatic Precipitator
• Turbine Power Upgrade
• Boiler Pendant Tube Replacement
Other
• Soy Bean Processing Facility Construction
Computer Programs
Project Controls - Primavera Project Planner (P3), Primavera Enterprise (P3E, P4, P5, P6, P6v7), Sure Track, MicroSoft Project, Quicknet, Project 2 (P2), Deltek Cobra, Deltek Open Plan, Prolog
Other – MicroSoft Access, Excel, Word and Power Point, dBase, Visio, Various Work Management Programs
General – I am very thorough and quick to learn new software programs
WORK HISTORY
3/2010 – Present Work as a Consultant with Gate 6 Solutions, Inc.
• Senior Project Controls Specialist – Bid Proposals, Soy Bean Facility Construction, Project Management Process Development for Small Business
2/2008 – 3/2010 Coffeen, IL, Coffeen Power Station with Gate 6 Solutions, Inc.
• Senior/Lead Scheduler for FGD and Precipitator Project for the general contractor Alberici
8/2005 – 1/2008 Monroe, MI, Monroe Power Plant with Washington Group International
• Projects Control Supervisor Managing Capital and Environmental Project Schedules on multiple DTE sites
8/2004 – 8/2005 San Clemente, CA, San Onofre Nuclear Generating Station with ViLinc Solutions
• Site Principle for ViLinc Solutions Managing VSI personnel (interviews thru release)
• Refueling Outage night shift Lead Scheduler
• Lead Scheduler on the Steam Generator Replacement Project
8/2001 – 8/2004 Monroe, MI, Monroe Power Plant
• 4/2003 – 8/2004 with The Bartech Group – Lead Scheduler for Detroit Edison Outage Group
• 2/2002 – 4/2003 with PIER Support Services – Senior Planner / Scheduler for Unit 3 SCR Project
• 8/2001 – 12/2001 with PIER Support Services – Senior Planner / Scheduler for Unit 1 Capital Projects
4/2001 – 8/2001 Harrisburg, PA, Three Mile Island with Onsite Energy Services
• Lead Scheduler for Refueling Outage night shift
1/2001 – 4/2001 Red Wing, MN, Prairie Island Nuclear Power Facility with Resource Technical Services
• Lead Scheduler on the Steam Generator Replacement Project
• EPC Scheduler for Capital Projects
1/1991 – 8/2000 Bridgman, MI, D. C. Cook Nuclear Plant – direct hire for American Electric Power
• 8/1999 – 8/2000 Surveillance Specialist for Restart Group
• 3/1999 – 8/1999 Engineering Restart Support
• 2/1996 – 3/1999 Senior Online Scheduler (Department ES&H and Employees Club Rep.)
• 8/1992 – 2/1996 Senior Outage Scheduler (Department ES&H Rep.)
• 1/1991 – 8/1992 with Halliburton NUS – Mechanical Maintenance Procedure Writer
6/1990 - 12/1990 Russelville, AK, Arkansas Nuclear One with Spear Contract Services, Inc.
• Outage Scheduler / Coordinator
2/1990 - 6/1990 Oak Harbor, OH, Davis Besse with Cataract, Inc.
• Mechanical Planner for the Planning and Management Support Section
1/1989 - 2/1990 Rochester, NY, Ginna Nuclear Plant Planning Department with Halliburton NUS
• Mechanical Work Planner / Maintenance Procedure Writer / Scheduler
2/1984 - 12/1988 Shippingport, PA, Beaver Valley Power Station with Schneider Engineers
• Mechanical Start Up Engineer
CERTIFIED: Level III Mechanical Inspector per ANSI N45.2.6 and VT-2 per ASME Section XI.
6/1977 – 5/1983 US Navy - Nuclear Power Program – Machinist Mate 1st Class E6 – Honorable Discharge
• 6/82 - 5/83 Submarine Squadron 7 Logistics Department - Pearl Harbor, HI, Transient Personnel Supervisor CERTIFIED: Prisoner Escort
• 12/78 - 6/82 USS Los Angeles SSN-688 - Pearl Harbor, HI, Leading first class, Engineering Watch Supervisor, Duty Section Leader, Quality Assurance Inspector, Parts Petty Officer and Ships Barber
• 6/77 - 5/82 Navy Training Schools - Machinist Mate and Nuclear Power